Talk:Riviera MRT/LRT station

Latest comment: 1 year ago by Sammi Brie in topic GA Review

Fair use rationale for Image:NS logo.jpg

edit
 

Image:NS logo.jpg is being used on this article. I notice the image page specifies that the image is being used under fair use but there is no explanation or rationale as to why its use in this Wikipedia article constitutes fair use. In addition to the boilerplate fair use template, you must also write out on the image description page a specific explanation or rationale for why using this image in each article is consistent with fair use.

Please go to the image description page and edit it to include a fair use rationale. Using one of the templates at Wikipedia:Fair use rationale guideline is an easy way to insure that your image is in compliance with Wikipedia policy, but remember that you must complete the template. Do not simply insert a blank template on an image page.

If there is other fair use media, consider checking that you have specified the fair use rationale on the other images used on this page. Note that any fair use images lacking such an explanation can be deleted one week after being tagged, as described on criteria for speedy deletion. If you have any questions please ask them at the Media copyright questions page. Thank you.

BetacommandBot (talk) 23:56, 2 January 2008 (UTC)Reply

GA Review

edit

The following discussion is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.


This review is transcluded from Talk:Riviera MRT/LRT station/GA1. The edit link for this section can be used to add comments to the review.

Reviewer: Sammi Brie (talk · contribs) 18:15, 1 January 2023 (UTC)Reply

It won't take long to make the needed changes in copy and add alt text. 7-day hold to ZKang123. Sammi Brie (she/her • tc) 18:15, 1 January 2023 (UTC)Reply

Copy changes

edit
  • One platform was closed early for urgent maintenance, while operations continue as trains run at the other platform This should be updated to past tense.
  • However, the restrictions imposed on construction works due to the COVID-19 pandemic has led to delays and the dates were pushed by one year to 2032 Add a comma after "delays" (User:Sammi Brie/Commas in sentences)
  • The S$1.1 billion (US$0.8 billion) involves Missing word "project"
  • Like the rest of the LRT stations, the station has lifts and wider fare gates for the wheelchair disabled, and tactile flooring to guide visually impaired commuters through the station Remove the comma: not separable into two sentences

Sourcing and spot checks

edit

Earwig turns up no substantial issues, mostly proper nouns like "The Cross Island Line (CRL)". Four sources were selected for spot checks.

  • 6: Checks out the closure of one platform for the 2020 maintenance incident.  Y
  • 8: Announcement of four-station branch line with a 2031 opening date.  Y
  • 10: Announcement of contract award: Construction works for the CPe Riviera station are expected to start in the first quarter of 2023, with passenger service targeted to commence in 2032.  Y
  • 13: Website listing accessibility features of the LRT stations—seems like this is systemwide.  Y

Other items

edit
  • The article has three libre licensed images. None have alt text.
Responded to above comments. ZKang123 (talk) 04:51, 4 January 2023 (UTC)Reply
The discussion above is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.