Trains: Stations / in UK Template‑class | ||||||||||||||||||||||
|
Workington Steel Works edit
The diagram shows the line to the steel works as open. However, since the floods, the bridge is out of action. Should the line now be shown as closed, of have they found another way to link the steel works to the main line? 12:05, 28 December 2009 (UTC)