Talk:Thorneside railway station

Latest comment: 2 years ago by Pga1965 in topic angle

angle

edit

the turning angle was built here because the station was designed in diesel times on the line. further extensions were done post electrification, so hence fully electrified. even after electrification peak diesels terminated at Thorneside.

Pga1965 (talk) 17:50, 21 January 2022 (UTC)Reply