Talk:Jack Schrade Interchange

Latest comment: 18 years ago by Unclebex in topic Awards/Distinctions


Article Accuracy

edit

I originally found this article while looking up info on dual-deck bridges and this bridge was inaccurately described as carrying I-8 and SD Trolley traffic on a lower deck. In fact, both of these alternate routes run W-E (and on the valley floor) as opposed to I-805's N-S direction. --Uncle Bex 17:20, 2 February 2006 (UTC)Reply


Awards/Distinctions

edit

Additionally, I know that this bridge won some awards for concrete work and for the scope of the project back when it was built in the mid-1970s. Some further research should be put into it. I might have seen it on a California Department of Transportation (Caltrans) web page. --Uncle Bex 17:20, 2 February 2006 (UTC)Reply