Talk:A1 motorway (Romania)

Latest comment: 6 years ago by InternetArchiveBot in topic External links modified

Motorway sections under construction (July 2007) edit

"The 23 km of motorway forming a ring around Sibiu are to be completed in 2009"; please check the present status of this project as huge delays have appered due to the trial between Compania Naţională de Autostrăzi şi Drumuri Naţionale din România (CNADNR) and the construction company Todini. I am afraid 2009 is not a realistic term. Creionul (talk) 09:03, 14 April 2008 (UTC)Reply

Completed sections and under construction sections (as of Dec. 2011) edit

Please update the map:

1. Sibiu Bypass - completed 2. Nadlac-Arad - 44 km - under construction 3 Arad Bypass West - 12 km - u/c 4. Arad-Timisoara - 32 km - completed 5. Timisoara Bypass East - 9.5 km - u/c 6. Deva-Orastie - 32 km - u/c 7. Orastie-Sibiu - 82 km - u/c

Please see: http://www.cnadnr.ro/proiecte.php?tip=105 for more information (Romanian only). Fastardul (talk) 20:37, 16 December 2011 (UTC)Reply

Contracted and planned length notes edit

Opened sections: Bucharest – Pitești: 95.9 km ([1]), Pitești bypass: 13.6 km ([2]), Sibiu bypass: 17.5 km ([3]), Arad – Timișoara: 32.25 km ([4]), Arad bypass: 12.25 km ([5]). Total length: 171.5 km.

Under construction sections: Orăștie – Sibiu: 82.07 km ([6]), Deva – Orăștie: 32.5 km ([7]), Lugoj – Deva (lot 1): 27.6 km ([8]), Timișoara bypass: 9.5 km ([9]), Nădlac – Arad: 38.88 km ([10]). Total length: 190.55 km.

Tendered sections: Lugoj – Deva (lots 2, 3 and 4): 71.88 km ([11]), Timișoara – Lugoj: 25.62 km ([12]). Total length: 97.5 km.

Planned section: Sibiu – Pitești: 116.64 km ([13]), plus approximately 5 km for the connection with the Sibiu bypass ([14]).

Total length: Bucharest – Nădlac: 576.19 km, plus approximately 5 km. --BaboneCar (talk) 23:28, 16 October 2012 (UTC)Reply

Under construction sections (as of Apr. 2014) edit

  • Orăştie-Sibiu, lot 3 - 22.1 km
  • Deva-Lugoj, lot 2 - 28.6 km
  • Deva-Lugoj, lot 3 - 21.2 km
  • Deva-Lugoj, lot 4 - 22.1 km
  • Timişoara-Lugoj, lot 2 - 25.6 km
  • Arad-Nădlac, lot 1 - 22.2 km
  • Total Deva-Lugoj - 71,9 km (see [15] for construction start)
  • Total 141.8 km
MagRudolfMayer (talk) 16:19, 6 April 2014 (UTC)Reply
Ref? Nergaal (talk) 10:37, 7 April 2014 (UTC)Reply

Length of A1 vs. A11 edit

I've consulted several sources so far and at the moment it's unclear to me what is the length of the piece from the Arad bypass that became A11 and what's the length of it that's remaining as A1. Can anybody reference a source for this?

Shadow Caster One (talk) 07:56, 1 August 2015 (UTC)Reply

External links modified edit

Hello fellow Wikipedians,

I have just modified 2 external links on A1 motorway (Romania). Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 18 January 2022).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 19:37, 23 June 2017 (UTC)Reply