Sealdah–New Delhi Rajdhani Express

The 12313 / 12314 Sealdah–New Delhi Rajdhani Express is a Rajdhani class train of Indian Railways which connects the capital of West Bengal, Kolkata to the National Capital of India, New Delhi through Sealdah. It is the third Rajdhani Express class train connecting Delhi and Kolkata and is the second-fastest connection between these two cities by rail.[1]

Sealdah–New Delhi Rajdhani Express
New Delhi bound 12313 Sealdah Rajdhani hauled by 30330 Sealdah WAP-7
Overview
Service typeRajdhani Express
StatusOperational on daily basis
LocaleWest Bengal, Jharkhand, Bihar, Uttar Pradesh & Delhi
First service1 July 2000; 24 years ago (2000-07-01)
Current operator(s)Eastern Railway Zone
Route
TerminiSealdah (SDAH)
New Delhi (NDLS)
Stops8
Distance travelled1,459 km (907 mi)
Average journey time17hrs 45mins
Service frequencyDaily
Train number(s)12313 / 12314
Line(s) used
On-board services
Class(es)AC 1st Class, AC 2 Tier, AC 3 Tier
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesAvailable
Observation facilitiesLarge windows
Technical
Rolling stockLHB coach
Track gauge1,676 mm (5 ft 6 in)
Operating speed130 km/h (81 mph) operating speed 83 km/h (52 mph) average including halts

Overview

edit

Owing to the high demands of the passengers plying between Delhi and Kolkata and to ease down the existing pressure of bookings on the Howrah Rajdhani Express, Indian Railways decided to introduce another Rajdhani class train between these two cities. Since Howrah Division of Eastern Railways already had two existing Rajdhani Express trains, thus Sealdah Division of Eastern Railway was awarded with third Rajdhani Express to West Bengal. Hence on the annual railway budget of FY 2000-01, the then Minister of Railways, Mamata Banerjee, announced the starting of the Sealdah – New Delhi Rajdhani on bi-weekly basis. Based on the same, on 1 July 2000, the first Sealdah Rajdhani Express left for New Delhi from Sealdah for its maiden journey.[2]

On 23 August 2006, the coaches of Sealdah Rajdhani Express were upgraded to LHB coaches replacing the older ICF coaches.

Route and halts

edit

Traction

edit

It is hauled by a Howrah based WAP-7 (HOG) equipped locomotive from end to end. Post the transfer of HOG based WAP-7s and other electric locomotives to the Kanchrapara Locomotive Shed, officially known as the Sealdah Locomotive Shed, the Sealdah Rajdhani was occasionally spotted with the SDAH based WAP-7 (HOG) locomotive.

Time table

edit
Station Code Station name Arrival Departure
SDAH Sealdah --- 16:50
DGR Durgapur 18:48 18:50
ASN Asansol Junction 19:16 19:20
DHN Dhanbad Junction 20:20 20:25
GAYA Gaya Junction 22:57 23:00
DDU Pt DD Upadhyaya Junction 01:15 01:25
CNB Kanpur Central 05:20 05:25
NDLS New Delhi 10:50 ---

Speed

edit

The train can reach its maximum allowed speed of 130 km/h (81 mph), except for two specific sections. One is the 29 km (18 mi) stretch between New Delhi (NDLS) and Chipyana Buzurg (CPYZ), where the Railway is endeavoring to increase the maximum allowed speed from 110 km/h (68 mph) to 130 km/h (81 mph). The other section is Gurpa to Gujhandi near Koderma, comprising a 22 km (14 mi) long ghat portion where trains are permitted to travel at a maximum speed of 80 km/h (50 mph). Within tunnels, the speed limit is further reduced to 65 km/h (40 mph). Additionally, trains briefly touch speeds of 100 km/h (62 mph) over a short distance of approximately 3 km (1.9 mi).

 
12314 Sealdah Rajdhani Express standing at New Delhi Railway Station platform number 14

In 2019, the Cabinet Committee on Economic Affairs (CCEA) recommended to the government the augmentation of the existing maximum permissible speed of the Delhi – Howrah route from 130 km/h (81 mph) to 160 km/h (99 mph), with the aim of enhancing average speed by a minimum of 60% to facilitate quicker connectivity and trade. In alignment with this directive, the Railway Board approved a project budgeted at Rs. 6,865 crore under the Indian Railway’s Mission Raftaar initiative. The project's objective is to elevate the maximum permissible speed of both the Delhi – Howrah and Kanpur – Lucknow routes to 160 km/h (99 mph) by the timeline of 2022–2023. However, there has been no specific update on the progress of the project to date.[3]

edit

References

edit
  1. ^ "Big Sealdah Rajdhani revamp images: Book for same fare; get these new features and comforts". The Financial Express. 29 November 2017. Retrieved 19 July 2021.
  2. ^ Sealdah-New Delhi Rajdhani Express (Bi-weekly)
  3. ^ "Increasing the Speed to 160 kmph on existing New Delhi – Howrah Route (including Kanpur – Lucknow) has been approved by the Government". pib.gov.in. Retrieved 3 April 2024.