The Parramatta Light Rail is a 12-kilometre (7 mi) standard gauge light rail line currently under construction in Sydney, New South Wales, Australia.

Parramatta Light Rail
An Urbos 100 on a test run between Dundas and Telopea, March 2024
Overview
StatusUnder testing (stage 1)
OwnerTransport for NSW
Termini
Stations16 (stage 1)
Websitewww.parramattalightrail.nsw.gov.au
Service
Services2
Operator(s)Transdev Australasia
Depot(s)Camellia
Rolling stock13 Urbos 100
History
Planned opening2024 (stage 1)
Technical
Line length
  • 12 kilometres (7 mi) (stage 1)
  • 9 kilometres (6 mi) (stage 2)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map
Map

The first stage of the line will run from Westmead to Carlingford via the Western Sydney centre of Parramatta. Construction commenced in 2019, with the first stage due to start passenger services in mid-2024. In July 2024, transport minister Jo Haylen announced that services running on the first stage will be running as the L4 Westmead & Carlingford Line.

A second stage is planned for a branch from Camellia or Rydalmere to Sydney Olympic Park. Construction of stage two is expected to commence in 2024.

The line is physically completely separate from the rest of the Sydney light rail network. It is being managed by Transport for NSW.

Background

edit

Parramatta - Duck River tramway

edit

Between 1883 and 1943, a tramway, operated by Sydney Ferries Limited, travelled from the Parramatta Park end of George Street to the mouth of the Duck River,[1] where it originally connected with the company's Parramatta River ferry services to Sydney CBD.[2][3][4] The connecting ferries ceased in 1928; the line then primarily carried freight until it closed in March 1943.[5][6][7] Part of the Parramatta Light Rail will run via a very similar route including via Tramway Avenue in Parramatta, named after the original line.

Rogans Hill Tramway

edit

The Rogans Hill railway (originally a steam tramway) was a short-lived railway line in Parramatta. Upon its opening in 1902, it ran between Parramatta and Baulkham Hills and was later extended to Castle Hill in 1910.[8] After a decision by the NSW Government in 1919 to convert the line into a railway, the tramway was relaunched in 1923 as such with the final extension to Rogans Hill opening in 1924.[9] However, the line was never successful after its conversion into a railway due to competition with cars and buses on Old Windsor Road (which ran parallel to it) and as a result it closed in 1932.[10] During the feasibility study for the Parramatta Light Rail in 2013, the route of the old Rogans Hill railway line was investigated as a possible corridor for the new light rail.[11]

Route investigation

edit

In 2013, Parramatta City Council published a $1 million feasibility study into a proposed Western Sydney Light Rail Network, designed to improve transport links throughout Western Sydney and meet the challenges posed by the projected rise in population in the region in the coming decades. The study found that a light rail system was a viable solution to address the growing transport needs of Parramatta and Western Sydney. The report estimated $20 million in funding was required to undertake a detailed investigation and to prepare a business case.[12] It proposed that construction of the network would take place in several stages, the first of which comprised a route from Macquarie Centre to Castle Hill via Eastwood, Dundas, Parramatta and Baulkham Hills, with a branch from Parramatta to Westmead. Further extensions were proposed from Parramatta to Bankstown and Rhodes.[12]

As part of its 2014/15 budget, the New South Wales Government announced Transport for NSW would investigate ten potential light rail routes in Western Sydney. The government allocated $400 million to ensure funds for detailed planning and construction of an initial project would be 'ready to go', should the investigations prove favourable.[13] Six of the ten routes being investigated were eliminated from contention in October 2014.[14] The routes investigated were:

Route Status Notes
Parramatta to Bankstown Not selected
Parramatta to Castle Hill via Old Northern Road Not selected
Parramatta to Castle Hill via Windsor Road Eliminated in October 2014 Based on the route proposed by Parramatta City Council. Old alignment of the Rogans Hill railway line
Parramatta to Liverpool via the T-way Eliminated in October 2014
Parramatta to Macquarie Park via Carlingford Parramatta - Carlingford section selected
Parramatta to Macquarie Park via Eastwood Eliminated in October 2014 Based on the route proposed by Parramatta City Council
Parramatta to Strathfield/Burwood via Sydney Olympic Park Strathfield option selected Route extended from Sydney Olympic Park to Strathfield/Burwood in October 2014
Parramatta to Sydney CBD via Parramatta Road Eliminated in October 2014
Parramatta to Rouse Hill Eliminated in October 2014
Parramatta to Ryde via Victoria Road Eliminated in October 2014

Of the final four routes, the Macquarie Park via Carlingford and the Strathfield via Olympic Park options were perceived as the frontrunners to be selected.[15] The Macquarie Park route was supported by Parramatta, Ryde and The Hills councils.[16][17][18] The Strathfield route was supported by The WestLine Partnership, a lobby group consisting of businesses and organisations with a presence in the area.[19] Auburn and Canada Bay councils were later joined by Strathfield Council as members of the group.[20][21]

The Strathfield route passes through industrial areas of Sydney and the potential for these areas to generate funding and patronage was a key point of contention during the lobbying period. The WestLine Partnership suggested the Strathfield route could be partially financed via value capture. Property developers building urban renewal projects along the line would provide a financial contribution to the government.[22] The group also suggested building a branch from Newington to Rhodes and indicated its funding model could allow a route to Carlingford to be built as well.[23] Supporters of the Macquarie Park route argued the needs of that corridor were more pressing and the Strathfield route would be poorly utilised in its early years.[24][25]

Official announcement

edit
 
The Parramatta River passing through Rydalmere and Camellia, as seen in 2010. A mixture of low density housing and light industry can be seen on the Rydalmere side of the river. Heavy industry dominates on the Camellia side. Sydney Olympic Park can be seen in the middle distance.

The Parramatta Light Rail scheme was officially unveiled on 8 December 2015, when the government announced it had selected the Strathfield route plus a truncated version of the Macquarie Park route that ends at Carlingford.[26] The two routes were proposed to converge at Camellia and proceed through Parramatta to Westmead.

The government's announcement included a $1 billion contribution towards the project. The government will also adopt the value capture approach advocated by The WestLine Partnership, by instigating an infrastructure contribution on new residential developments along the route. The revenue raised by the levy will be used to help fund the light rail and other infrastructure for the area.[26] The government's investigations into the value capture process held up the announcement of the preferred route but would reportedly have allowed the two lines to be built together.[22] The state government will also explore funding contributions from the federal and local tiers of government.[26] The convenor of the partnership stated that the light rail project's funding model would be used as a test case for funding future infrastructure projects.[21]

Construction of the lines was expected to commence in late 2018 but there was no announcement of an expected completion date or a total budget for the project.[27][28] An early estimate from January 2016 put the total cost at $3.51 billion.[29]

Deferral and redesign of the eastern branch

edit

In August 2016, Transport for NSW noted the project could be delivered in stages.[30] A new metro line between the Sydney central business district and Parramatta was announced in November 2016.[31] The metro would adopt a similar route to the Strathfield branch of the light rail; media reports indicated the metro project would most likely cause the deferral of construction of this branch.[32] This was confirmed in February 2017, when it was announced that the Westmead - Camellia section and the Carlingford branch would be built as stage 1 of the light rail project.

Despite the deferral of construction, planning work for the Strathfield via Sydney Olympic Park branch continued.[33] Media reports from 2017 indicated the route could shift from running to the south of the Parramatta River to the north of the river and that the section from Sydney Olympic Park to Strathfield could be dropped.[34]

The preferred stage 2 route was announced in October 2017. The changes reported on by the media were confirmed. The redesigned route runs from either Rydalmere or Camellia to Sydney Olympic Park via Ermington, Melrose Park and Wentworth Point. No details about the project's cost or construction dates were announced.

In November 2020, it was reported that the block of land at Camellia, bought by the NSW government for $53.5 million for the stabling and maintenance depot, was effectively worthless because of high levels of soil contamination.[35][36] The purchase was referred to the Independent Commission Against Corruption (ICAC) because an internal investigation by the NSW transport department found the purchase of the land, for three times what the Valuer-General estimated it was worth, broke basic rules, and the land was bought from a developer without a valuation. The developer had bought the six-hectare parcel of land only months before, for $38 million.[37]

In 2022, it was reported that it would take until 2031 to open stage 2 for passenger operations, 5 years longer than originally planned.[38]

In February 2024, stage 2 of the Parramatta Light Rail was approved by the New South Wales Government, with the 2023-24 state budget committing $200 million to the project.[39]

Design

edit

The routes will begin at Westmead before proceeding east to Camellia or Rydalmere via North Parramatta and the Parramatta CBD. At Camellia/Rydalmere the two routes split. The stage 1 route goes north to Carlingford, while the stage 2 route continues east to Sydney Olympic Park.

Stage 1 - Parramatta and branch to Carlingford

edit
 
Line diagram of stage 1
 
The installation of overhead wires on the newly completed section between Telopea and Yallamuni (Rydalmere), December 2022

The stage 1 route was announced on 17 February 2017. The stage 1 route runs between Westmead and Carlingford via North Parramatta, the Parramatta CBD, Camellia, Rydalmere, Dundas and Telopea. It includes sixteen stops along a 12 km (7 mi) route. It includes two wire-free sections—one between Westmead and Cumberland Hospital—and another between Prince Alfred Square and Tramway Avenue.[40] The maintenance and stabling facility will be located east of Rosehill Racecourse. Trams will access the facility via a short branch line that uses the alignment of the Sandown railway line.[41][42] Extension from Carlingford to Epping is under study.[43]

The Environmental Impact Statement for stage 1 was released in August 2017.[44] Planning approval was granted in May 2018.[45] The stops are, from west to east:[46][47]

Westmead - Westmead light rail stop will be the western terminus of both lines of the Parramatta Light Rail. Located on Hawkesbury Road in the suburb of Westmead, the stop will consist of one island platform (two platforms) and one side platform, adding up to a total of 3 platforms. Located on the intersection with Railway Parade,[48][49] its close location relative to Westmead Railway Station will enable quick transfers with Sydney Trains at Westmead railway station and future Sydney Metro West.[50] This stop also contains one of the 7 traction power substations that serve the line.[51]

Westmead Hospital - Also located in the suburb of Westmead, this station will be located north of the intersection of Caroline Street.[48] It will consist of 2 side platforms and serve Westmead Hospital.

Childrens Hospital, previously the Children's Hospital at Westmead, this station is an island-platform station along Hainsworth Street which will serve the Westmead Children's Hospital. During the naming process of the station, the Darug word for infant, 'Gurung', was proposed but rejected.[52]

Ngara, previously called Cumberland Hospital station, got its name from the Darug word meaning "To listen, to hear, think".[53] The station consists of two side platforms and will serve Cumberland Hospital. Ngara station is located on Factory Street, in the suburb of North Parramatta.

Benaud Oval, formerly Factory Street,[54] is named after the nearby Richie Benaud Oval which the station also serves. Consisting of two side platforms, it is located on the corner of Factory Street and Church Street in North Parramatta and contains the second of the power substations.[51]

Fennell Street consists of two side-platforms on the corner of Fennell Street and Church Street in the suburb of Parramatta.

 
Prince Alfred Square stop, March 2023

Prince Alfred Square is located on Church Street adjacent to its namesake in the suburb of Parramatta. The last stop before the line enters the Parramatta CBD over the Parramatta River. When opened, it will serve the Western Sydney Stadium and consist of 2 side platforms.

Church Street, formerly Eat Street, is a light rail stop that will serve the newly-pedestrianised section of Church Street in the Parramatta CBD. It will consist of two side platforms; most of the street excluding the station were opened in late 2021.[55]

Parramatta Square is the second stop within Parramatta CBD. Consisting of two side platforms, when opened Parramatta Square station will be between Parramatta railway station and the future Parramatta metro station[56] and will be directly connected to both by Civic Link.[57] Parramatta Square station contains another traction substation.

Robin Thomas, called Harris Street during planning, is a two side-platform station located at the intersection between Macquarie Street and Harris Street in Parramatta. It is located directly before the light rail line takes two sharp 90 degree turns onto Harris, then George Street. Named after nearby Robin Thomas Reserve.[58]

Tramway Avenue is located after the second pair of adjacent 90 degree turns on the line. This stop is located on its namesake street. After this station, the street-running section ends at Bidgee Bidgee bridge (formerly James Ruse Drive Bridge),[48] named after an Indigenous tribal leader.[59] Tramway Avenue station is also where the 5.7 km (3.5 mi) long shared path (formally called the Carlingford Light Rail Active Transport Link) to Carlingford begins,[60] and is the location of the fourth power substation. Initially planned to have an island platform, the design was revised in 2018 to two side platforms.

Rosehill Gardens station (formerly Camellia station) is the first of the 5 stations on the Parramatta Light Rail Stage 1 line that were reused from the Carlingford railway line. The station consists of two side platforms and serves the nearby Rosehill Gardens Racecourse, which the station is named after. Just before Rosehill Gardens station, the line branches off towards the tram Stabling and Maintenance Facility[61] and the future Stage 2 line via a reused section of the Sandown Line.

Yallamundi, formerly Rydalmere Station, takes its name from a Darug word meaning storytelling. It is the second station reused from the Carlingford Line and consists of two side platforms on the site of the old station. Yallamundi station serves the nearby Western Sydney University (South Parramatta Campus) and the suburb of Rydalmere.

Dundas is the first of three old Carlingford Railway Line stations to retain its name, and the only one to retain its heritage-listed station building.[62] Located just south of Kissing Point Road, it consists of two side platforms and contains the second-last power substation and a backup operational control centre in case the maintenance facility malfunctions. The station serves the suburb of Dundas.

 
Telopea stop nearing completion, November 2023

Telopea consists of two side platforms and is the second station on the line to retain its old name. Serving the suburb of Telopea, it contains the last traction power substation on the line. Just after the station is the only single-track section on the entire system;[63] the entirety of the original Carlingford railway line was single-track, and as a consequence the bridge above this section was built to accommodate only one, not two tracks. Since the road that runs above it is Pennant Hills Road, a 6 lane major arterial road, the bridge cannot be modified or removed.

Carlingford is the terminus of the Parramatta Light Rail Stage 1 route. The single track splits back into two just before the approach to the station, where they end in two side platforms.[63] Carlingford station is also the terminus of the aforementioned Active Transport shared path and serves the suburb of Carlingford.

Stage 2 - Branch to Sydney Olympic Park

edit
 
Line diagram of stage 2

The second branch of the light rail continues east to Sydney Olympic Park.

There are two options being considered for the connection to the stage 1 route. The first option would utilise the Carlingford railway line (and stage 1) corridor over the Parramatta River to Rydalmere, where it would then branch. The second option would leave the main stage 1 route at Camellia and utilise the branch line built to provide access to the tram depot. It would continue via the Sandown railway line corridor and Grand Avenue, then cross the Parramatta River just east of Rydalmere ferry wharf. Both versions of the route then continue via Ermington and Melrose Park, cross back to the south of the Parramatta River, pass through Wentworth Point and terminate at Sydney Olympic Park. The stage 2 route is around nine kilometres (six miles) long and will include ten to twelve stops.[39] The second option is shown as the planned route on the Parramatta Light Rail website.[64]

The original plans for this branch followed a route similar to that taken by Grand Avenue through Camellia before crossing the Duck River, passing through Newington, crossing Haslams Creek, serving Sydney Olympic Park and terminating at the major transport hub of Strathfield.[65]

In 2024, the NSW Legislative Council Inquiry into Current and future public transport needs in Western Sydney recommended "that the Government urgently investigate extending Stage 2 of the Parramatta Light Rail project so that the line no longer terminates at the Carter Street precinct but continues from there to terminate at Lidcombe railway station".[66] This recommendation has been endorsed by Cumberland Council[67] and public transport advocacy groups such as EcoTransit Sydney.[68]

Construction

edit

Stage 1

edit
 
Construction along Church Street, Parramatta, April 2021

In November 2017, a CPB Contractors/Downer Group joint venture and John Holland were shortlisted to build stage 1. At the same time, three consortia were shortlisted to supply the rolling stock, maintain the infrastructure and operate the services:[69][70]

The winning bidders were announced in December 2018. The CPB/Downer joint venture will build the majority of the infrastructure, while Great River City Light Rail will build the depot, light rail stops and power systems, supply the vehicles, the signalling systems and operate the network. The total budget for stage 1 is A$2.4 billion.[40][71]

Construction began in 2018,[33] with the line expected to open in 2024.[72]

In July 2018, work commenced on site remediation at the Camelia depot site.[73] Major construction was originally planned to start in June 2020.[74] This was brought forward to January 2020 and the first sod was turned on 31 January 2020.[75][76]

Micro tunnelling will be used to build drainage and stormwater capacity underneath Church Street, to minimise construction impacts and disruptions in comparison to traditional pipeline construction such as excavating above the ground.[77] The first micro-tunnel machine was launched in June 2020 from Centenary Square to Parramatta Town Hall and will connect to an existing pipe to extend stormwater capacity. A second micro-tunnel machine will also be launched from Centenary Square to Lennox Bridge to build drainage and stormwater capacity underneath Church Street.[78]

Major construction of Stage 1 commenced at Westmead in July 2020.[79]

 
Parts of the light rail contain green track; this is an example near Cumberland Hospital

Traffic changes

edit

Traffic changes were implemented along and surrounding the light rail alignment as part of enabling works.[80]

 
The partially opened pedestrianised section of the line along Church Street, April 2023
Church Street
edit
 
The partially opened section on Macquarie Street, May 2023

Church Street between Macquarie Street and Market Street became a pedestrian-only zone on 1 February 2020 prior to the start of major construction in June that year.[76][74] This included "Eat Street", a section of Church Street between George Street and Lennox Bridge where restaurants and outdoor tables and seating are located. The NSW government previously stated that work on 'Eat Street' would not start until 2020.[81][82][83] During construction, outdoor dining infrastructure along "Eat Street" would be removed and construction hoarding would be erected. The initial plan was, between 1 November to 31 January each year, 'Eat Street' would benefit from a construction 'grace period', when construction hoardings would be removed and outdoor tables and seating would be temporarily reintroduced.[84] This was to ensure that business owners, diners, tourists and shoppers do not experience constant construction works during the busy holiday season. However, after consulting with the Parramatta Light Rail Business Reference Group and Eat Street businesses, the plan was changed to 'fast tracking' the works during the initial grace period and delaying the grace period.[85] This would allow major construction to be completed earlier (scheduled in August 2021), followed by a delayed grace period, before installation of stops, testing and commissioning begins.[86] The "Eat Street" reopened to outdoor dining in October 2021 following the lifting of COVID-19 lockdown restrictions.[87]

Church Street between Barney Street and Victoria Road was closed to traffic on 3 July 2020.[88] Bus services along Church Street were redirected to travel along O'Connell Street.

George Street
edit

On 29 November 2019, George Street between O'Connell Street and Harris/Macarthur Street was converted from the existing one-way eastbound configuration into two-way traffic.[89] The parking and the travel lanes along the southern side of George Street were temporarily removed one week prior, to allow eastbound motorists to get used to travelling on the northern side of George Street. The conversion of George Street to two-way traffic is to offset the loss of westbound lanes on Macquarie Street, which is along the light rail alignment.[80]

O'Connell Street
edit

In June 2020, works to widen O'Connell Street to four lanes between Barney Street and Albert Street were completed.[90] The intersection of O'Connell Street and Barney Street was also reconstructed to allow continuous flow between both roads.

Bus service changes

edit

After Church Street closed on 1 February 2020, the Parramatta free shuttle service 900 ran on a modified route, running along George Street instead of Macquarie Street.[91][76]

Railway line closures

edit
 
The Carlingford and Sandown railway lines. The section of the Carlingford line to be converted to light rail is highlighted.
 
Camellia station on the Carlingford line. Most of the line will become part of the Parramatta Light Rail.

The northern branch to Carlingford will reuse most of the Carlingford railway line, which closed on 5 January 2020.[92] The closure included Rosehill railway station, located between Clyde and Camellia, which will not be served by the light rail project.[65][93] The level crossing across Parramatta Road was also removed later that month.[94]

The Carlingford line was single track for most of its length, had shorter platforms than other lines in Sydney and had long been seen as under-utilised. Patronage declined from 446,000 journeys in 2001 to 260,000 journeys in 2014.[95] 2016-17 patronage figures based on Opal card tap on and off data recorded 511,000 journeys on the line during the year. This placed the line last among all train lines in the Opal network.[96] Various modification schemes to revitalise the line had been proposed. Action for Transport 2010, a New South Wales Government plan released in 1998, included the Parramatta Rail Link; a heavy rail line from Parramatta to Chatswood that would have utilised the Carlingford line between Camellia and Carlingford. As part of the CityRail Clearways Project announced in 2004, a passing loop was to have been built at Rydalmere, enabling a more frequent service.[97][98] Neither scheme came to fruition.

The Sandown railway line was officially closed in June 2019 and removal of the line and tracks began in July 2019.[99][100] This 1.5 kilometre line diverged from the Carlingford line at Camellia and ran close to the southern bank of the Parramatta River. Passenger services had ceased in December 1991, though the line's Rosehill platform remained in use for special charters, while freight trains ceased in June 2010 when trains from the Clyde Refinery last ran.[101][102][103] The western end of the Sandown line will be used by the light rail to provide access to a tram stabling and maintenance facility.[42]

Operation

edit

When operations begin, Transdev will operate the network for eight years, with a possible extension of up to an additional ten years.[104]

A document produced by Transport for NSW in February 2017 stated services would operate every 7.5 minutes throughout the day.[33] However, a press release from December 2018 said services would operate every 7.5 minutes during peak periods, with frequencies at other times left unspecified.[40]

Westmead & Carlingford Line, numbered L4, is the service name of the stage 1 route.[105][106]

Fleet

edit

Stage 1 will be operated by a fleet of thirteen Urbos 100 built by Construcciones y Auxiliar de Ferrocarriles (CAF).[104] Urbos 100 are also already in operation on the Inner West Light Rail in five module configuration. The Urbos 100 on the Parramatta Light Rail will instead operate in seven modules with a length of 45.5 metres (149 ft), feature onboard batteries and in-ground charging.[107][104][108]

References

edit
  1. ^ "Parramatta Trams | Parramatta History and Heritage". historyandheritage.cityofparramatta.nsw.gov.au. Retrieved 28 January 2024.
  2. ^ "The Parramatta Tram". The Sydney Morning Herald. 2 October 1883. Archived from the original on 22 August 2016. Retrieved 14 July 2016.
  3. ^ Dunn, John (2006). Comeng: A History of Commonwealth Engineering Volume 1, 1921-1955. Kenthurst: Rosenberg Publishing. p. 95. ISBN 1877058424.
  4. ^ Oakes, John (2009). Sydney's Forgotten Industrial Railways. Redfern: Australian Railway Historical Society. p. 29. ISBN 9780980510645.
  5. ^ "Parramatta Ferry to Terminate at Bridge: Company's Decision". The Sun. 7 February 1928. Archived from the original on 19 October 2017. Retrieved 7 June 2017.
  6. ^ Hoskins, Ian (2015). "River Cycles - A History of the Parramatta River". Dictionary of Sydney. Archived from the original on 22 October 2016. Retrieved 7 June 2017.
  7. ^ McCarthy, Ken (April 1973). "The Era of the Steam Tramway" (PDF). Trolley Wire. 14 No. 2 (145): 3. Archived (PDF) from the original on 11 March 2016. Retrieved 28 July 2016.
  8. ^ "Rogans Hill Branch". www.nswrail.net. Retrieved 28 January 2024.
  9. ^ "February 1867 - Loco Express" (PDF). Loco Express. February 2018. Retrieved 31 January 2024.
  10. ^ "Rogans Hill Branch". www.nswrail.net. Retrieved 31 January 2024.
  11. ^ The Parramatta Light Rail Problem, retrieved 31 January 2024
  12. ^ a b "Western Sydney Light Rail Network". Parramatta City Council. Archived from the original on 7 June 2015. Retrieved 3 July 2013.
  13. ^ "Parramatta light rail: $400 million reserved to transform travel to Sydney's second CBD". Transport for NSW. 17 June 2014. Archived from the original on 21 June 2014. Retrieved 18 June 2014.
  14. ^ "Four Western Sydney corridors shortlisted for Parramatta Light Rail". Transport for NSW. 27 October 2014. Archived from the original on 27 October 2014.
  15. ^ Lehmann, John (8 June 2015). "Sydney Olympic Park light rail project promises long-overdue 'linking up' of infrastructure". The Daily Telegraph. Retrieved 7 December 2015.
  16. ^ "MEDIA RELEASE: Parramatta City Council's vision for Western Sydney Light Rail". Parramatta City Council. 11 June 2015. Archived from the original on 10 December 2015. Retrieved 7 December 2015.
  17. ^ "Parramatta to Macquarie Park Light Rail". City of Ryde. 8 May 2015. Archived from the original on 8 December 2015. Retrieved 7 December 2015.
  18. ^ "Hills Mayor calls on James Shaw to change track on Light Rail route". The Hills Shire Council. 13 March 2015. Archived from the original on 17 December 2015. Retrieved 7 December 2015.
  19. ^ "About The WestLine Partnership" (PDF). Sydney Olympic Park Business Association. The WestLine Partnership. Archived (PDF) from the original on 4 March 2016. Retrieved 7 December 2015.
  20. ^ "Strathfield Council commits $20,000 to support the WestLine Partnership". Strathfield Council. 27 March 2015. Archived from the original on 17 December 2015. Retrieved 28 December 2015.
  21. ^ a b The WestLine Partnership. "Full Steam Ahead for Light Rail Along Olympic Corridor". Sydney Olympic Park Business Association. Archived from the original on 4 March 2016. Retrieved 28 December 2015.
  22. ^ a b Clennell, Andrew (7 December 2015). "Western Sydney light rail project worth more than $2b to be announced". The Daily Telegraph. Retrieved 7 December 2015.
  23. ^ FitzGerald, Deborah (24 February 2015). "Corporate push to connect light rail from Parramatta to Olympic Park with $1.1 billion in private funding". Parramatta Advertiser.
  24. ^ "The time is NOW for Light Rail to Carlingford". The Hills Shire Council. 8 June 2015. Archived from the original on 17 December 2015. Retrieved 7 December 2015.
  25. ^ Kembrey, Melanie; Saulwick, Jacob (7 December 2015). "Premier Mike Baird to announce light rail from Parramatta to Sydney Olympic Park". The Sydney Morning Herald. Archived from the original on 8 December 2015. Retrieved 7 December 2015.
  26. ^ a b c "Making it happen in Western Sydney: Parramatta light rail network unveiled". Transport for NSW. 8 December 2015. Archived from the original on 8 December 2015.
  27. ^ "Parramatta Light Rail". Transport for NSW. Archived from the original on 10 December 2015. Retrieved 8 December 2015.
  28. ^ O'Sullivan, Matt (8 December 2015). "Parramatta light rail line via Sydney Olympic Park gets green light". The Sydney Morning Herald. Archived from the original on 8 December 2015. Retrieved 8 December 2015.
  29. ^ Saulwick, Jacob (16 October 2016). "Parramatta light rail costs blow out to more than $3.5 billion". The Sydney Morning Herald. Archived from the original on 17 October 2016. Retrieved 17 October 2016.
  30. ^ "Parramatta Light Rail Project Overview" (PDF). Transport for NSW. August 2016. p. 2. Archived (PDF) from the original on 11 October 2016. Retrieved 17 September 2016.
  31. ^ "Sydney Metro West: a new railway, more trains for Western Sydney". Transport for NSW. 14 November 2016. Archived from the original on 29 April 2017. Retrieved 14 November 2016.
  32. ^ O'Sullivan, Matt (2 October 2016). "Change of course looms for multibillion-dollar Parramatta light rail". The Sydney Morning Herald. Archived from the original on 4 October 2016. Retrieved 4 October 2016.
  33. ^ a b c "Parramatta Light Rail – Stage 1: frequently asked questions" (PDF). Transport for NSW. Archived from the original (PDF) on 17 February 2017. Retrieved 17 February 2017.
  34. ^ "Change of route leaves Sydney suburb out of light rail plans". 9news.com.au. Nine Digital. 14 July 2017. Archived from the original on 17 July 2017. Retrieved 16 July 2017.
  35. ^ McKinnell, Jamie (18 May 2021). "Scathing report refuses to rule out corruption over NSW government's $53m land deal". ABC News. Archived from the original on 8 January 2022. Retrieved 7 January 2022.
  36. ^ "Acquisition of 4–6 Grand Avenue, Camellia". Audit Office of New South Wales. 18 May 2021. Archived from the original on 7 January 2022. Retrieved 7 January 2022.
  37. ^ Ferguson, Adele; O'Sullivan, Matt (14 December 2020). "Internal probe into toxic land scandal reveals agency flouted rules". Sydney Morning Herald. Archived from the original on 13 December 2020. Retrieved 14 December 2020.
  38. ^ O'Sullivan, Matt (9 November 2022). "Second stage of Parramatta light rail line will not open until 2031". The Sydney Morning Herald. Retrieved 4 July 2024.
  39. ^ a b Busby, Ellie (23 February 2024). "Parramatta Light Rail Stage 2 gets greenlight". parranews.com.au. Archived from the original on 5 March 2024. Retrieved 5 March 2024.
  40. ^ a b c "Parramatta Light Rail contracts signed". www.transport.nsw.gov.au. Transport for NSW. 20 December 2018. Archived from the original on 21 December 2018. Retrieved 21 December 2018.
  41. ^ "Transport for NSW 2015-16 Annual Report Volume 1" (PDF). Transport for NSW. p. 30. Archived from the original (PDF) on 18 November 2016. Retrieved 18 November 2016.
  42. ^ a b "Preferred route - stage 1" (PDF). Transport for NSW. Archived (PDF) from the original on 28 February 2019. Retrieved 17 February 2017.
  43. ^ Alex (29 March 2017). "Parramatta Light Rail part 3: Stage 1 extension and Stage 2 options". StrategicMatters. Retrieved 30 November 2023.
  44. ^ Gilbert, Ewan (23 August 2017). "Parramatta Light Rail: Consultation for stage one nears end as Government confirms acquisitions". ABC News. Australian Broadcasting Corporation. Archived from the original on 27 July 2021. Retrieved 30 August 2017.
  45. ^ "Parramatta Light Rail approved". www.transport.nsw.gov.au. Transport for NSW. 30 May 2018. Archived from the original on 8 June 2018. Retrieved 30 May 2018.
  46. ^ "Parramatta light rail to connect communities". Transport for NSW. 17 February 2017. Archived from the original on 20 February 2017. Retrieved 17 February 2017.
  47. ^ "Parramatta Light Rail | Stage 1 – Westmead to Carlingford via Camellia: Environmental Impact Statement" (PDF). Transport for NSW. pp. 5-31–5-52, 5-84–5-85. Archived (PDF) from the original on 16 June 2020. Retrieved 24 August 2017.
  48. ^ a b c Parramatta Light Rail Update - Spring 2021 - Part 1 - Westmead to Camellia, retrieved 28 January 2024
  49. ^ Government, NSW (20 April 2020). "Construction work hours extended at Hawkesbury Road, Westmead". Parramatta Light Rail. Retrieved 28 January 2024.
  50. ^ "Westmead metro station | Sydney Metro". www.sydneymetro.info. Retrieved 28 January 2024.
  51. ^ a b "Parramatta Light Rail Stage 1 - Infrastructure Package - Infrastructure Pipeline". infrastructurepipeline.org. Retrieved 28 January 2024.
  52. ^ "Geographical Names Act 1966 (372)" (PDF). Government Gazette of the State of New South Wales. 11 December 2020. p. 2.
  53. ^ "Ngara* Wireless Information and Communication Technologies – SIEF". sief.org.au. Retrieved 28 January 2024.
  54. ^ Parramatta Light Rail Update Part 2 - Tramway Avenue to Prince Alfred Square via Parramatta CBD, retrieved 28 January 2024
  55. ^ "Eat Street Open for Business – Sydney Olympic Park Business Association". Retrieved 28 January 2024.
  56. ^ "Parramatta metro station | Sydney Metro". www.sydneymetro.info. Retrieved 28 January 2024.
  57. ^ "Civic Link". cityofparramatta.nsw.gov.au. Retrieved 28 January 2024.
  58. ^ "Robin Thomas Reserve". www.cityofparramatta.nsw.gov.au. Retrieved 28 January 2024.
  59. ^ Parramatta Light Rail Update Part 1 | Carlingford to Tramway Avenue including Maintenance Facility, retrieved 28 January 2024
  60. ^ "New shared pathway connects Parramatta communities | nsw". www.mysydney.nsw.gov.au. Retrieved 28 January 2024.
  61. ^ "Parramatta Light Rail". Laing O’Rourke. Retrieved 28 January 2024.
  62. ^ "Station Stories". Transport NSW Blog. 3 January 2020. Retrieved 28 January 2024.
  63. ^ a b Parramatta Light Rail Update Part 2 | Camellia to Carlingford & Maintenance Facility | March 2022, retrieved 28 January 2024
  64. ^ "Parramatta Light Rail Stages 1 and 2". NSW Government Parramatta Light Rail. Archived from the original on 5 October 2022. Retrieved 4 October 2022.
  65. ^ a b "Parramatta Light Rail - How the preferred network was chosen". Transport for NSW. Archived from the original on 10 December 2015. Retrieved 8 December 2015.
  66. ^ NSW Parliament, Portfolio Committee No. 6 - Transport and the Arts (29 April 2024). "Report No. 21 - PC 6 - Current and future public transport needs in Western Sydney" (PDF). NSW Parliament.{{cite web}}: CS1 maint: numeric names: authors list (link)
  67. ^ Busby, Ellie (14 June 2024). "Lake's Lidcombe call: Mayor wants Light Rail extended". Parra News.
  68. ^ Network, Action. "Extend Parramatta Light Rail Stage 2 to Lidcombe and Strathfield". actionnetwork.org. Retrieved 24 June 2024.
  69. ^ World's best to build and operate Parramatta Light Rail Transport for NSW 22 November 2017
  70. ^ Parramatta light rail shortlists announced Metro Report International 23 November 2017
  71. ^ Downer JV awarded Parramatta Light Rail contract Archived 30 June 2019 at the Wayback Machine Downer Rail 28 December 2018
  72. ^ "Stage 1 Frequently Asked Questions". Parramatta Light Rail. NSW Government. Archived from the original on 24 March 2023. Retrieved 19 October 2022.
  73. ^ Future Parramatta light rail stabling site to be decontaminated Rail Express 15 May 2018
  74. ^ a b "Parramatta CBD's construction schedule released". Parramatta Light Rail. 23 October 2019. Archived from the original on 26 October 2019. Retrieved 4 November 2019.
  75. ^ "Major construction to begin in January 2020". Parramatta Light Rail. 19 December 2019. Archived from the original on 3 February 2020. Retrieved 3 February 2020.
  76. ^ a b c "First sod turned for Paramatta Light Rail". Transport for NSW. 31 January 2020. Archived from the original on 2 February 2020. Retrieved 3 February 2020.
  77. ^ "Micro Tunnelling". Parramatta Light Rail. Archived from the original on 16 June 2020. Retrieved 16 June 2020.
  78. ^ "Micro-tunnel machine launches to Parramatta Town Hall". Parramatta Light Rail. 15 June 2020. Archived from the original on 16 June 2020. Retrieved 16 June 2020.
  79. ^ Light rail taking shape in Westmead Archived 7 August 2020 at the Wayback Machine Parramatta Light Rail 30 July 2020.
  80. ^ a b "Enabling Road Works". Parramatta Light Rail. Archived from the original on 26 October 2019. Retrieved 6 November 2019.
  81. ^ "Parramatta Light Rail – Stage 1: Connecting great places" (PDF). Transport for NSW. March 2017. pp. 1, 4. Archived from the original (PDF) on 21 June 2017. Retrieved 7 June 2017.
  82. ^ "NSW 'guarantees' later start of Parramatta Light Rail" Archived 24 July 2021 at the Wayback Machine Rail Express
  83. ^ Construction certainty for Parramatta 'Eat Street' Archived 17 August 2018 at the Wayback Machine Transport for NSW
  84. ^ "Construction on 'Eat Street' in 2020" (PDF). Parramatta Light Rail. 23 October 2019. Archived (PDF) from the original on 4 November 2019. Retrieved 4 November 2019.
  85. ^ "Eat Street light rail works fast-tracked". Parramatta Light Rail. 14 October 2020. Archived from the original on 30 January 2021. Retrieved 25 January 2021.
  86. ^ "Eat Street light rail works fast-tracked" (PDF). Minister for Transport and Roads. 15 October 2020. Archived (PDF) from the original on 29 January 2021. Retrieved 25 January 2021.
  87. ^ "Parramatta's Eat Street open for business". Parramatta Light Rail. 15 October 2021. Archived from the original on 18 October 2021. Retrieved 19 October 2021.
  88. ^ "Closure Church St North Parramatta - Driver Notice" (PDF). CDC NSW. Archived (PDF) from the original on 20 July 2020. Retrieved 20 July 2020.
  89. ^ "Pedestrians Urged To Look Both Ways As Parramatta's George Street Becomes Two-Way". NSW Government - Tomorrow's Sydney. Archived from the original on 6 November 2019. Retrieved 6 November 2019.
  90. ^ "Major roads makeover in Parramatta". Parramatta Light Raildate=10 June 2020. Archived from the original on 15 June 2020. Retrieved 15 June 2020.
  91. ^ "Upcoming changes in Parramatta CBD". 27 January 2020. Archived from the original on 3 February 2020. Retrieved 3 February 2020.
  92. ^ T6 Carlingford Line closure for Parramatta Light Rail –Temporary Transport Plan Archived 10 October 2019 at the Wayback Machine Transport for NSW
  93. ^ "Parramatta Light Rail | Stage 1 – Westmead to Carlingford via Camellia: Environmental Impact Statement" (PDF). Transport for NSW. pp. 5–65, 5–66, 8–27. Archived (PDF) from the original on 16 June 2020. Retrieved 24 August 2017.
  94. ^ "Boom! Gates are gone on Parramatta Road". Parramatta Light Rail. 29 January 2020. Archived from the original on 3 February 2020. Retrieved 3 February 2020.
  95. ^ "Journeys by line and year". Bureau of Transport Statistics. p. Journeys by line. Archived from the original on 11 October 2015. Retrieved 28 July 2016.
  96. ^ "Train Patronage - Monthly Figures". Transport for NSW. 8 June 2017. Archived from the original on 7 August 2017. Retrieved 13 July 2017.
  97. ^ "Big mini-budget for Sydney's rail network" Railway Digest May 2004 page 8
  98. ^ "State Environmental Planning Policy No 63—Major Transport Projects (Amendment No 3) under the Environmental Planning and Assessment Act 1979" (PDF). NSW Parliamentary Counsel's Office. September 2005. p. 7. Archived (PDF) from the original on 22 April 2017. Retrieved 22 April 2017.
  99. ^ "Transport Administration (Authority To Close Railway Lines – Carlingford And Sandown Lines) Order 2019 (66)" (PDF). Government Gazette of the State of New South Wales. 28 June 2019. p. 2269. Retrieved 28 June 2019.
  100. ^ "News Update September 2019 Newsletter" (PDF). Parramatta Light Rail. September 2019. Archived (PDF) from the original on 4 November 2019. Retrieved 4 November 2019.
  101. ^ "Cityrail launches new timetable". Railway Digest (February 1992): 45. 1992.
  102. ^ Walters, Chris (March 2020). "The Last Train to Carlingford". Railway Digest.
  103. ^ Sandown: End of the Line Railway Digest September 2010 page 24
  104. ^ a b c "Transfer Australasia Consortium Secures Parramatta Light Rail". 20 December 2018. Archived from the original on 4 November 2019. Retrieved 4 November 2019.
  105. ^ "Parramatta Light Rail enters final testing phase as network's name is revealed". NSW Government. 4 July 2024. Retrieved 4 July 2024.
  106. ^ "Parramatta light rail network map". Facebook. Jo Haylen. 4 July 2024.
  107. ^ "Parramatta Light Rail Overview" (PDF). Parramatta Light Rail. Archived from the original (PDF) on 3 December 2019. Retrieved 4 November 2019.
  108. ^ Transport for NSW, Parramatta Light Rail (19 February 2024). "Light rail vehicles | NSW Government". www.nsw.gov.au. Retrieved 28 March 2024.
edit