Wikipedia:WikiProject U.S. Roads/Missouri/All-time list

Given are the years of the first and last official maps the routes appear on (except for numbers that died in 1926 or 1927, which are starred). These are not always the exact years the routes were created or eliminated (and at least through 1939, since the map is dated January 1, the creation dates are probably the previous year).

In 1929 Missouri designated a "300 mile system" of additional routes, as well as "park connections" and "traffic relief routes". Most suffixed routes were numbered at this time. Unfortunately proposed numbers are not shown, so routes that were renumbered before construction was complete are missing from the table. Missing 1929 numbers: 73 75 109 115

1922 and 1923 maps 1950 map 1952 map

from to notes
Route 1 1922 now
Route 1A 1922 1929
→ 102
Phelps City spur
Route 1B 1922 1927 Craig spur
was 1 rerouted to make this unnecessary?
Route 1C 1922 1929
→ 111
Bigelow spur
Route 1D 1922 1929
→ 113
Maitland spur
Route 1E 1922 1929
→ 120
New Point spur
Route 1F 1922 1929
→ 118
Forest City spur
Route 1F 1922 1926*
→ US 60 (part)
Joplin to Kansas; typo for 16, shown as 16 on the 1923 map
Route 2 1926
← 60
now
Route 2 1922 1926*
→ US 40
Route 3 1926
← 67
now
Route 3 1922 1926*
→ US 65
Route 4 1922 1959
→ US 136 (part)
Route 4A 1922 1929
→ 85
Evona spur
Route 4B 1926
← 9 (part)
1929
→ 81
Kahoka to Iowa
Route 5 1922 now
Route 5A 1922 1929
→ 95
Longrun spur
Route 6 1922 now
Route 7 1926
← 63
now
Route 7 1922 1926*
→ US 63
Route 8 1926
← 62
now
Route 8 1922 1926*
→ US 36
Route 9 1935
← 59
now
Route 9 1926
← 61
1934
→ US 59 (part)
Route 9 1922 1926*
→ US 61
Route 9A 1922 1929
→ 56
Philadelphia spur to county line
Route 10 1922 now
Route 11 1929 now appears in 1930; unlabeled until 1934
Route 11 1922 1926*
→ US 69
Route 12 1952
← 240 (part)
now
Route 12 1940 1945
→ 47 (part)
Route 12 1935 1935
→ US 169 (part)
Fairfax Bridge approach
Route 12 1926
← 36
1930
→ US 160
Route 12 1922 1926*
→ US 50
Route 12A 1922 1929
→ 87
Jamestown spur to county line
Route 12B 1922 1929
→ 89
Chamois spur
Route 13 1922 now
Route 14 1926
← 40
now
Route 14 1922 1926*
→ US 60 (1927: US 66)
Route 15 1922 now
Route 16 1941
← 96
now
Route 16 1936 1940
→ 96
Route 16 1922 1930
→ US 60 (part)
Route 17 1922 now
Route 17A 1928 1937
→ 32 (part)
Plato spur
unlabeled until 1931
Route 18 1936 now
Route 18 1933
← 4 (part)
1934
→ US 59 (part)
Route 18 1922 1932
→ 4 (part)
Route 19 1922 now
Route 19A 1928 1932
→ B (part)?
Davisville spur
became part of 49 in 1935-1936
Route 20 1922 now
Route 21 1922 now
Route 21A 1929 1983 unlabeled until 1935
Route 22 1922 now
Route 23 1929? now appears in 1931; unlabeled until 1933
Route 23 1922 1926*
→ US 67
Route 24 1922 1927*
→ 52
Route 25 1922 now
Route 26 1922 1927*
→ 62
Renumbered to match the Missouri grid of roads
Route 26 1927
← 54
1940
→ 154
Route 26 1952
← 4 (part)
1970
→ US 136 (part)
Route 27 2005 now
Route 27 1922 1968
→ 148
Route 28 1922 now
Route 29 1936 1958
→ 161
Route 29 1922 1930
→ US 169 (part)
Route 30 1922 now
Route 31 1922 now
Route 32 1922 now
Route 33 1922 now
Route 33A 1922 1929
→ 116
Lathrop spur
Route 34 1922 now
Route 35 1922 1958
→ 7 (part)
swapped with 1 before 1926
Route 36 1922 1926*
→ 12
Route 37 1922 now
Route 38 1940 now
Route 38 1922 1937
→ 14 (part)
Route 38N 1930
← 38 (part)
1932
→ US 71 Opt. (part)
Route 39 1922 now
Route 40 1922 1926*
→ 14
Route 41 1922 now
Route 42 1937 now
Route 42 1922 1935
→ 14 (part)
Route 43 1936 now
Route 43 1922 1929
← 13 (part)
Route 44 1922 1958
→ 76 (part), 148, 176
Route 45 1930?
← 52A
now 1930 map still shows 52A; first labeled in 1933
Route 45 1922 1929
→ 19 (part)
Route 46 1922 now
Route 47 1922 now
Route 48 1922 now
Route 49 1922 now
Route 49A 1966 1974 Davisville spur
Route 50 1922 1926*
→ 1 (part)
Route 51 1922 now
Route 51A 1922 1929
→ 51 (part)
Puxico spur
Route 52 1927
← 24
now
Route 52 1922 1927*
→ 4 (part)
Route 52A 1922 1929
→ 45
Armour to county line
still appears in 1930, but probably erroneously
Route 53 1922 now
Route 54 1922 1927*
→ 26
Route 54A 1922 1929
→ 19 (part)
Perry to county line
Route 55 1922 1958
→ 77
Route 55A 1922 1929
→ 105
East Prairie spur to county line
Route 56 1930
← 9A
1956
→ 168
Route 56 1922 1929
→ 47 (part), 79 (part)
Route 57 1922 1958
→ 171
Route 58 1922 now
Route 59 1961
← US 71 (part)
now
Route 59 1922 1934
→ 9
Route 60 1922 1926*
→ 2
Route 61 1922 1926*
→ 9
Route 62 1927
← 26
1930
→ 82
Route 62 1922 1926*
→ 8
renumbered because US 60 was going to be US 62
Route 63 1922 1926*
→ 7
Route 64 1922 now swapped with US 54 in 1932-1933
Route 64A 1948 now Bennett Spring State Park
unlabeled until 1971
Route 64A 1922 1929
→ 83
Quincy spur to county line
Route 64B 1966
← 64 (part)
now Pomme de Terre State Park
Route 65 1922 1923 northwest from St. James; became 68 in 1927
Route 66 1987
← US 66
now
Route 66 1922 1927*
→ US 54 (part)
Route 67 1922 1926*
→ 3
Route 68 1927 now
Route 68 1922 1927*
→ 32 (part)
Route 69 1922 1923
→ 13 (part)
Route 70 1922 1958
→ 72 (part)
Route 71 1922 1922
→ 3 (part)
Route 72 1922 now
Route 73 1933
← US 54 (part)
now 73 should have been assigned in 1929
Route 73 1934 1934
→ US 59 (part)
proposed extension of US 73 to Pembina, ND that did not make it; old 73 may have been renumbered for a short time
Route 74 1922 now
Route 75 1968
← 77 (part)
now 75 should have been assigned in 1929
Route 76 1922 now
Route 76A 1956 1975
→ 176 (part)
Rockaway Beach spur
previously unlabeled
Route 77 1959
← 55
now
Route 77 1930 1954
→ US 50 Byp. (part)
unlabeled until 1931
only a tiny bit at the south end remained after 1935
Route 78 1944 now
Route 78 1922 1937
→ 80 (part)
Route 79 1930 now
Route 80 1955 now
Route 80 1922 1953
→ US 160 (part), 99, 148
Route 81 1930
← 4B
now
Route 82 1931
← 62
now
Route 82 1922 1930
→ US 62 (part)
Route 83 1930
← 64A
now
Route 84 1922 now
Route 85 1930
← 4A
now
Route 86 1922 now
Route 87 1930
← 12A
now
Route 88 1964
← 13 (part)
1978
Route 88 1922 1960
→ US 71 (part)
Route 89 1930
← 12B
now
Route 90 1922 now
Route 91 1930
← 51 (part); 51 replaced 51A
now
Route 92 1922 now
Route 93 1930 1930
→ US 62 (part)
unlabeled; southwest from Campbell
Route 94 1922 now
Route 95 1930
← 5A
now
Route 96 1941
← 16
now numbered to match Kansas
Route 96 1929?
← 6 (part)
1940
→ 16
unlabeled until 1931
Route 96 1922 1922 southwest from Higginsville
Route 97 1930
← 44 (part)
now
Route 98 1922 now
Route 99 1954
← 80 (part)
now
Route 99 1930 1952
→ US 67 (part)
unlabeled until 1932
Route 100 1930 now originally Gray Summit to St. Louis; extended west in 1931 (unlabeled until 1933)
Route 101 1941 now numbered to match Arkansas
Route 101 1930 1940
→ 143
Sam A. Baker State Park
unlabeled until 1937
Route 102 1940 now Big Oak Tree State Park
Route 102 1930
← 1A
1932
→ 4 (part)
Route 103 1930 now Big Spring State Park
unlabeled until 1933
Route 104 1941 now Washington State Park
Route 104 1930 1937
→ 106 (part)
Alley Spring State Park
unlabeled until 1935
Route 105 1930
← 55A
now
Route 106 1930 now Deer Run State Park
unlabeled until 1934
Route 107 1930 now Mark Twain State Park
unlabeled until 1932
Route 108 1930 now 1930 map shows it replacing part of 25, but in 1931 it's on its current alignment and 25 is back to normal
Route 109 1934 (project map) now Babler State Park; unlabeled until 1938
109 should have been assigned in 1929 (this one probably wasn't, since Babler Park doesn't appear until 1935)
Route 110 1930 now unlabeled until 1935
Route 111 1938
← 118
now
Route 111 1930
← 1C
1937
→ 118
Route 112 1930 now Roaring River State Park
unlabeled until 1932
Route 113 1930
← 1D
now
Route 114 1962
← US 60 (part)
now unlabeled until 1963
Route 114 1930 1958
→ 155 (part)
Meramec State Park
unlabeled until 1933
Route 115 1943 (project map) now unbuilt until 1948
Route 116 1930
← 33A
now
Route 117 1930 now Indian Trail State Park
unlabeled until 1938
Route 118 1938
← 111
now
Route 118 1930
← 1F
1937
→ 111
Route 119 1930 now Montauk State Park
unlabeled until 1933
Route 120 1930
← 1E
now
Route 121 1936 now Wallace State Park
Route 122 1937 now Van Meter State Park
Route 123 1936 now
Route 124 1938 now
Route 125 1936 now
Route 126 1942 now
Route 127 1937 now
Route 128 1948 now Crowder State Park
Route 129 1937 now
Route 130 1948 now Pershing State Park
Route 131 1937 now
Route 132 1948 1995
→ 23 (part)
Knob Noster State Park
Route 133 1937 now
Route 134 1948 now Lake of the Ozarks State Park
Route 135 1937 now
Route 136 1950 1950
→ 145
Lake Paho Conservation Area
Route 137 1937 now
Route 138 1952 now
Route 139 1938 now
Route 140 1936 1974
→ US 67 (part)
Route 141 1938 now
Route 142 1952 now
Route 143 1941
← 101
now Sam A. Baker State Park
Route 144 1972 now Hawn State Park
Route 144 1954
← 13 (part)
1958
→ 173 (part)
may have been renumbered because I-244 was proposed as I-144?
Route 145 1952
← 136
now Lake Paho Conservation Area
Route 146 1950 now probably numbered due to its nearness to 46
Route 147 1948 now Cuivre River State Park
Route 148 1969
← 27
now
Route 148 1959
← 44 (part)
1968
→ 248
Route 148 1954
← 80 (part)
1958
→ 76 (part), 173 (part)
Route 149 1948 now Originally spur to New Cambria; extended north in 1950-1952; unlabeled until 1952
Route 150 1948 now had been US 50 Opt. until 1938
Route 151 1950 now
Route 152 1954 now
Route 153 1952 now
Route 154 1941
← 26
now
Route 155 1956 1966
→ 185
should have appeared by 1955; I have in my notes that it came in 1953 but I've looked several times without success
Route 156 1951 now probably numbered due to its nearness to 56, since 148 and 152 did not appear until 1954
Route 157 1955 now Thousand Hills State Park
Route 158 1954
← 14 (part)
now
Route 161 1959
← 29
now
Route 162 1956 now
Route 163 1973 now was this skipped in 1959 so it could be used as a branch of US 63?
Route 164 1956 now
Route 165 1959
← 86 (part)
now
Route 167 never? never? was this skipped in 1959 so it could be used as a branch of US 67?
Route 168 1957
← 56
now
Route 170 1956 1979
→ 190
why was this numbered before 168?
Route 171 1959
← 57
now
Route 172 1960 now Lake Wappapello State Park
Route 173 1959
← 144, 148 (part)
now
Route 174 1966
← US 166 (part)
now should have appeared in 1964
Route 175 1999
← US 71 (part)
now
Route 175 1964 1980 Fort Zumwalt Park
should have appeared in 1963
Route 176 1959
← 44 (part)
now
Route 177 1963 now Trail of Tears State Park
Route 178 1964 1980 Johnson's Shut-Ins State Park
Route 179 1964 now
Route 180 1960
← US 40 Alt.
now Why was this number assigned so early?
Route 181 1968 now
Route 185 1967
← 155
now 185 was probably chosen so only one digit would be changed; hence 183 was probably skipped
Route 187 1964 now Boone's Lick State Historic Site
Route 190 1980
← 170
now
Route 202 1969 now
Route 210 1954 now
Route 213 1961 now
Route 215 1971 now why this number?
Route 221 2010 now
Route 224 1969
← US 24 Bus.
now
Route 231 1964 now why this number?
Route 240 1936
← US 24 (part), 3 (part), 20 (part)
now
Route 242 2013 now
Route 245 1971 now why this number?
Route 246 1954
← 46 (part)
now
Route 248 1969
← 148
now
Route 249 2001 now
Route 254 1966 now
Route 265 1962 now
Route 266 1962
← US 66 (part)
now
Route 266 1957 1959
→ I-44 (part)
Route 267 1964
← US 67 Alt. (part)
now
Route 269 1953 now
Route 271 1961
← US 71 (part)
1961
→ 371 (part)
why was this so short-lived?
Route 273 1991 now why this number? if due to nearness to US 73, why no Kansas cooperation?
Route 283 1968?
← US 169A (part)
now why this number?
unlabeled until 1970
Route 291 1972
← US 71 Byp.
now why this number?
Route 340 1938 now
Route 350 1980
← US 50 (part)
now
Route 354 1968
← US 54 (part)
1968
→ US 54 Bus.
Route 360 2004 now
Route 364 2001 now
Route 366 1975
← US 50-66 (part)
now
Route 367 1975
← US 67 (part)
now
Route 370 1993 now
Route 371 1962
← US 71 (part), 271
now
Route 376 1995 now typoed as 367 in 1995
Route 413 2004
← 13 (part)
now
Route 465 2004 2020
Route 571 1987
← US 71 (part)
now
Route 725 1972 1983
→ I-170 (part)
why this number?
Route 740 1959 now
Route 744 1971
← US 66B
now
Route 750 1965 1978
← 765 (part)
unlabeled until 1967
Route 752 1970 now why this number?
1970 map shows it only west of US 59; after that it's only east
Route 759 1961
← US 59 Spur
now
Route 763 1961 now
Route 765 1967 now
US 24 Alt. (Lexington) 1948 (first city inset) 1958
US 24 Bus. (Lexington) 1959
← US 24 (part)
1968
→ 224
US 24 Bus. (Moberly) 1953
← US 24 City
1978
US 24 City (Moberly) 1948 (first city inset) 1952
→ US 24 Bus.
US 24 Bus. (Paris) 1970? (implied)
← US 24 (part)
now
US 36 Bus. (St. Joseph) 1960 1963
US 36 Bus. (Cameron) 1965 (implied)
← US 36 (part)
now
US 36 Bus. (Hamilton) 1962 (implied) now had been US 36 (part) until 1960-61
US 36 Spur (Utica) 1937? (implied) now
US 36 Bus. (Chillicothe) 1979 (implied) now
US 36 Bus. (Brookfield) 1957 (no city inset in 1955-56)
← US 36 (part)
now implied to exist since 1956
US 36 Bus. (Macon) 1971
← US 36 (part)
now
US 36 Spur (Macon) 1948 (first city inset) 1961 unlabeled at first
US 36 Bus. (Clarence) 2013 now presumably existed before 2013, but not shown on map
US 36 Bus. (Shelbina) 1973 (implied)
← US 36 (part)
now
US 36 Bus. (Monroe City) 1983
← US 36 (part)
now initially typoed as US 24 Bus.
US 36 Bus. (Hannibal) 1960
← US 36 (part)
now
US 36 Alt. (Hannibal) 1945 (first city inset)
← W
1954 (no city inset in 1955-56) implied to exist since 1942
US 40 Alt. (Kansas City) 1938
← US 40 (part), US 40 Opt. (East KC)
1965
US 40 City (Kansas City) 1936 1937
→ US 40 (part)
duplicate US 40 in 1935
US 40 Opt. (Kansas City) 1934 (first available city inset after 1928) 1963
US 40 Opt. (East Kansas City) 1935 1937
→ US 40 Alt. (part)
duplicate US 40 in 1934
US 40 Bus. (Columbia) 1960
← US 40 (part)
1963
US 40 Alt. (St. Louis) 1960 1963 along I-70
US 40 Alt. (St. Louis) 1941
← US 40 (part)
1959
→ 180
US 40 Byp. (Troy-Wentzville) 1938 1965
US 40 City (St. Louis) 1936 1959 duplicate US 40 in 1934-35; swapped with US 40/US 40 Alt. in 1940-41
US 40 Truck (St. Louis) 1939
1942
1939
1963
US 50 Opt. (Lone Jack-Olathe) 1936 1938
→ A, B, K, P
became 150 in 1948
US 50 Bus. (Warrensburg) 1961 now had been US 50 (part) until 1959-60
US 50 Bus. (Knob Noster) 2013 now presumably existed before 2013, but not shown on map
US 50 Spur (Smithton) no idea (implied) now
US 50 Bus. (California) 2010 (implied)
← US 50 (part)
now
US 50 Bus. (Jefferson City) 1963
← US 50 (part)
now implied to exist since 1962; second segment added in 1966-67; original segment deleted in 1973-74
US 50 Byp. (St. Louis) 1955
← 77
1974
→ US 50 (part)
US 50 City (St. Louis) 1936 1954 duplicate US 50 in 1934-35
US 54 Bus. (Lake Ozark) 1969
← 354
now
US 54 Bus. (Eldon) 1975
← US 54 (part)
now
US 54 Alt. (Jefferson City) 1953 1957
→ US 54 (westbound)
US 54 Bus. (Fulton) 1972
← US 54 (part)
now
US 54 Bus. (Mexico) 1995
← US 54 (part)
now
US 54 Bus. (Louisiana) 2013? (implied)
← US 54 (part)
now
US 59 Bus. (St. Joseph) 1960
← US 59 City
1963
→ US 59 (part)
US 59 City (St. Joseph) 1945 (first city inset)
← US 59 (part)
1959
→ US 59 Bus.
US 59 Spur (St. Joseph) 1960 1960
→ 759
US 60 Bus. (Seneca) 1966 (implied)
← US 60 (part)
now
US 60 Bus. (Neosho) 1961
← US 60 (part)
now
US 60 Bus. (Monett) 1962 (first city inset)
← US 60 (part)
now implied to exist since 1958
US 60 Bus. (Aurora-Verona) 1963 (implied)
← US 60 (part)
now
US 60 Bus. (Springfield) 1959
← US 60 City
1963
US 60 City (Springfield) 1945 (first city inset) 1958
→ US 60 Bus.
US 60 Bus. (Rogersville) 1967 (implied)
← US 60 (part)
now
US 60 Bus. (Mansfield) 1960 (implied) now had been US 60 (part) until 1957-58
US 60 Bus. (Mountain Grove) 1977
← US 60 (part)
now
US 60 Bus. (Cabool) 1974 (implied)
← US 60 (part)
now
US 60 Bus. (Willow Springs) 1966 (implied)
← US 60 (part)
now
US 60 Bus. (Van Buren) 1995
← US 60 (part)
now
US 60 Bus. (Elsinore) 1965
← US 60 (part)
1975
US 60 Bus. (Poplar Bluff) 1989 (implied)
← US 60 (part)
now
US 60 Bus. (Dexter) 1963
← US 60 (part)
now
US 60 Bus. (Sikeston) 1961
← US 60 (part)
now
US 61 Spur (New Madrid) 1948 (implied) now
US 61 Bus. (Sikeston) 1952
← US 61 City
1987
US 61 City (Sikeston) 1948 (first city inset) 1950
→ US 61 Bus.
US 61 Bus. (Cape Girardeau) 1952
← US 61 City
1964
US 61 City (Cape Girardeau) 1945 (first city inset) 1950
→ US 61 Bus.
US 61 Bus. (Bowling Green) 1983
← US 61 (part)
now
US 61 Bus. (New London) 1965 (implied)
← US 61 (part)
now
US 61 Bus. (Hannibal) 1959
← US 61 City
now
US 61 City (Hannibal) 1945 (first city inset)
← W, Y
1958
→ US 61 Bus.
US 61 Bus. (Palmyra) 1963 (implied)
← US 61 (part)
now
US 61 Bus. (La Grange) 1989 now
US 61 Bus. (Canton) 1989 now
US 63 Bus. (Thayer) never (2003 AASHTO over existing state routes) now
US 63 Bus. (West Plains) 1963
← US 63 (part)
now
US 63 Bus. (Willow Springs) 1966
← US 63 (part)
now
US 63 Bus. (Columbia) 1963
← US 63 (part)
1980 missing in 1978
US 63 Spur (Columbia) 1963
← WW
1963
US 63 Bus. (Clark) 1961 (implied)
← US 63 (part)
1964 need confirmation that this existed
US 63 Bus. (Moberly) 1961
← US 63 (part)
now
US 63 Bus. (Kirksville) 2013
← US 63 (part)
now
US 63 Bus. (Kirksville) 1953
← US 63 City
2007? (last labeled in 2001)
US 63 City (Kirksville) 1948 (first city inset) 1952
→ US 63 Bus.
US 65 Bus. (Branson-Hollister) 1977
← US 65 (part)
now
US 65 Bus. (Ozark) 1966 (implied)
← F (part)
now
US 65 Bus. (Springfield) 1971
← US 65 (part)
now
US 65 Spur (Warsaw) 1954 (implied) 1977 needs explicit confirmation
US 65 Bus. (Marshall) 1964
← US 65
now
US 65 Bus. (Carrollton) 1973 (implied) now did Carrollton also have a US 24 Bus.?
US 65 Bus. (Trenton) 1953
← US 65 City
now
US 65 City (Trenton) 1948 (first city inset) 1952
→ US 65 Bus.
US 66 Bus. (Joplin) if this existed, it was before 1945 (replaced US 66, became US 71 Bus.)
US 66 Byp. (Joplin) if this existed, it was before 1945 (replaced W, became US 66)
US 66 Alt. (Joplin-Webb City) 1945 (first city inset)
← Y
1950
→ 57 (part)
implied to exist since 1939 or earlier
US 66 Bus. (Webb City) 1952
← US 66 (part)
1974
US 66 Alt. (Carthage) 1945 (first city inset) 1974
→ V
implied to exist since 1930; swapped with US 66 after 1936; unlabeled after 1963; typoed? as US 66 Bus. in 1974 AASHTO deletion
US 66 Bus. (Springfield) 1959
← US 66 City
1970
→ 744 (part)
realigned in 1963-64
US 66 Alt. Bus. (Springfield) 1963
← US 166 Bus. (part)
1963
→ 88 (part)
unlabeled; may not have been designated US 66 Alt. Bus.
US 66 Byp. (Springfield) 1963
← US 166 Truck
1963
→ US 66 Bus. (part)
unlabeled; may not have been designated US 66 Byp.
US 66 City (Springfield) 1945 (first city inset) 1958
→ US 66 Bus.
US 66 Bus. (Lebanon) 1958
← US 66 (part)
1974?
→ I-44 Bus.
US 66 Bus. (Waynesville) 1954 (implied)
← US 66 (part)
1974?
→ I-44 Bus.
US 66 Spur (Fort Leonard Wood) 1957 (implied)
← 17 (part)
1974?
→ I-44 Bus.
US 66 Bus. (Rolla) 1959
← US 66 City
1966
I-44 Bus.
US 66 City (Rolla) 1948 (first city inset) 1958
→ US 66 Bus.
US 66 Bus. (Pacific) 1964 (implied)
← US 66 (part)
1974?
→ I-44 Bus.
US 66 Bus. (St. Louis) 1960
← 66 City
1963
US 66 Byp. (St. Louis) 1956 ← US 66 (part) 1965
US 66 City (St. Louis) 1936 1959
→ 66 Bus.
west of downtown is duplicate US 66 in 1934-35; 1938 clearly shows a three-pronged city route; west of downtown became US 66 in 1955-56
US 66 Opt. (St. Louis) 1934 (first available city inset after 1928) 1937 McKinley Bridge
US 67 Bus. (Poplar Bluff) 2001 (implied)
← US 67 (part)
now
US 67 Bus. (Greenville) 2010 (implied)
← US 67 (part)
now
US 67 Bus. (Fredericktown) 1965 (implied)
← US 67 (part)
now
US 67 Bus. (Desloge-Leadington) 1961 now
US 67 Alt. (Alton-St. Louis) 1939
← US 67 (part)
1963
→ 231 (part), 267
extended south in 1952-53
US 67 Byp. (St. Louis) 1938 1966
US 69 Alt. (Kansas City) 1938
← US 69 (part)
1963
US 69 Bus. (Excelsior Springs) 1957 (first city inset) 1979
US 69 Spur (Bethany) 1964 (implied) now
US 71 Bus. (Anderson-Pineville) 2004
← US 71 (part)
now
US 71 Bus. (Neosho) 2004 2010
→ I-49 Bus.
something else unlabeled in Neosho in 1948 (first city inset)?
US 71 Alt. (Carthage-Neosho) 1938
← US 71 Opt.
1997
→ 59 (part)
US 71 Opt. (Carthage-Neosho) 1932
← 38N (still shown in 1932)
1937
→ US 71 Alt.
US 71 Bus. (Joplin-Webb City) 1997
← US 71 (part)
2010
→ I-49 Bus.
US 71 Bus. (Joplin) 1945 (first city inset)
← US 71 (part)
1979
→ FF (part)
implied to exist since 1939 or earlier
US 71 Spur (Milo) 1964 (implied) now
US 71 Bus. (Nevada) 1971 (implied)
← US 71 (part)
2010
→ I-49 Bus.
US 71 Bus. (Butler) 1972
← US 71 (part)
2010
→ I-49 Bus.
US 71 Alt. (Kansas City) 1938
← US 71 (part)
1958
→ US 71 Bus.
US 71 Bus. (Kansas City) 1959
← US 71 Alt.
1969
→ 9 (part), A
removed south of downtown in 1967-68
US 71 Byp. (Kansas City) 1939
← 35 (part)
1971
→ 291
US 71 Bypass Spur (Liberty) 1948 (first expanded city inset) 1948
→ 33 (part)
originally part of 35; not sure if it was part of US 71 Byp or a spur of 35 in between
US 71 City (Kansas City) 1936 1937
→ US 71 (part)
duplicate US 71 in 1935
US 71 Byp. (Platte City) 1956 1957?
→ I-29 (part)
US 71 Bus. (St. Joseph) 1960
← US 71 City
1963
→ I-29 Bus. (part), 371 (part)
US 71 City (St. Joseph) 1938
← US 71 (part)
1959
→ US 71 Bus.
duplicate US 71 in 1936
US 71 Spur (St. Joseph) 1948 (first expanded city inset) 1957
→ H (part)
implied to exist since 1938 or earlier
US 71 Bus. (Savannah) 1991
← US 59 (part)
now
US 71 Bus. (Maryville) 1993 (implied)
← US 71 (part)
now
US 136 Bus. (Albany) 1954 (implied)
← US 136 (part)
now
US 136 Bus. (Memphis) never now
US 136 Bus. (Kahoka) never now
US 136 Spur (Wayland) 1971 (implied)
← US 136 (part)
now
US 160 Bus. (Willard) never now
US 166 Bus. (Joplin) 1958
← US 166 (part)
1962
→ I-44 Bus.
US 166 Bus. (Springfield) 1959
← US 166 City
1963
US 166 City (Springfield) 1952 1958
→ US 166 Bus.
US 166 Truck (Springfield) 1953 1962
→ US 66 Byp.??
US 169 Alt. (Kansas City) 1938 1970
→ 9 (part)
US 169 Spur (Smithville) never? now