Talk:Vizag back-to-back HVDC converter station

Latest comment: 8 years ago by 106.51.21.52 in topic synchronizing grids

synchronizing grids

edit

Sometimes the excess power fed to the southern grid by this HVDC link is flowing back to Western region through the 765 KV AC lines between Southern grid and the Western grid which is not desired. — Preceding unsigned comment added by 106.51.21.52 (talk) 06:38, 21 April 2016 (UTC)Reply