Commissioned in 1985 AD at Nadipur in Pokhara, Nepal, Seti Hydropower Station has an installed capacity of 1.5 MW. Water from the Seti Gandaki River is dammed to provide electricity which is later used for irrigation.[1][2][3]
Seti Hydropower Station | |
---|---|
Country | Nepal |
Location | Kaski District |
Coordinates | 28°13′50″N 83°57′54″E / 28.23056°N 83.96500°E |
Purpose | Power and irrigation |
Status | Operational |
Owner(s) | Nepal Electricity Authority |
Dam and spillways | |
Type of dam | run-of-river |
Commission date | 1985 |
Installed capacity | 1.5 MW |
Seti Hydropower Project
editSeti Hydropower Station is a run of river type with installed capacity of 1.5 MW and design generation of 9.8 GWh consisting of 3 units each 0.5 MW. It is located at Nadipur, Pokhara and was commissioned in 1985 AD with assistance from Government of People’s Republic of China and Government of Nepal. The power canal for this power station is jointly used for irrigation purposes looked after by Department of Irrigation and hence, the operation of this power station is affected by irrigation as well. The cumulative generation of Seti HPS has reached 254.77 GWh till 2011/12 from its first run. The station has generated 11.62 GWh in FY 2010/11 and 10.41 GWh in FY 2011/12 with decrease of 10.37%. The station contributed 0.25% of the total energy in the INPS in 2011/12.[4]
See also
editReferences
edit- ^ "Nepal Electricity Authority, Generation Operation and Maintenance". 2020-06-16. Archived from the original on 2020-06-16. Retrieved 2020-07-02.
- ^ Rai, Ash Kumar (2014-02-03). "Environmental Impact from River Damming for Hydroelectric Power Generation and Means of Mitigation" (PDF). Archived (PDF) from the original on 2014-02-03. Retrieved 2020-07-02.
- ^ "Power Plants : Hydro (More than 1MW)".
- ^ "Seti Hydropower Project". www.nwrmap.info. Retrieved 2023-11-25.
28°13′54″N 83°59′32″E / 28.2318°N 83.9921°E