This is a list of snakes found in Guatemala.

Leptotyphlopidae

edit

Order: Squamata. Family: Leptotyphlopidae

The Leptotyphlopidae (commonly called Slender Blind Snakes or Thread Snakes are a family of snakes found in North and South America, Africa, and Asia. All are fossorial and adapted to burrowing, feeding on ants and termites. Two genera are recognized comprising eighty-seven species. These are relatively small snakes rarely exceeding 30 cm in length. The body is cylindrical with blunt head and short tail. Scales are highly polished. Their diet consists mostly of termites or ants, their larvae and pupae. The pheremones they produce protect them from attack by termites.

Typhlopidae

edit

Order: Squamata. Family: Typhlopidae

The Typhlopidae are a family of blind snakes. They are found mostly in the tropical regions of Africa, Asia, the Americas, mainland Australia and various islands. The rostral scale overhangs the mouth to form a shovel like burrowing structure. They live underground in burrows, and since they have no use for vision, their eyes are mostly vestigial. They have light-detecting black eyespots, and teeth occur in the upper jaw. The tail ends with a horn like scale. Most of these species are oviparous. Currently, 6 genera are recognized containing 203 species.

Boidae

edit

Order: Squamata. Family: Boidae

The Boidae are a family of nonvenomous snakes found in America, Africa, Europe, Asia and some Pacific Islands. Relatively primitive snakes, adults are medium to large in size, with females usually larger than the males. Two subfamilies comprising eight genera and 43 species are currently recognized. Prey is killed by a process known as constriction; after an animal has been grasped to restrain it, a number of coils are hastily wrapped around it. Then, by applying and maintaining sufficient pressure to prevent it from inhaling, the prey eventually succumbs due to asphyxiation.

Loxocemidae

edit

Order: Squamata. Family: Loxocemidae

The Loxocemidae are a monotypic family[1] of snakes created for the monotypic genus Loxocemus that contains the species L. bicolor found in Central America. Loxocemidae is the smallest snake family, having just one species and one genera. Adults grow to a maximum of 1.57 m]] (62 in) in length. On average this snake grows to roughly 91 cm]] (3ft). The body is stout and very muscular. The diet (nutrition)|diet]] is believed to consist of rodents and lizards. It has also been observed eating iguana eggs.

Tropidophiidae

edit

Order: Squamata. Family: Tropidophiidae

The Tropidophiinae, common name dwarf boas, are a subfamily of snakes found from Mexico and the West Indies south to southeastern Brazil. These are small to medium-sized fossorial snakes, some with beautiful and striking color patterns. Currently, 4 living genera containing 22 species and one extinct genus with one species are recognized. These snakes are very small, averaging to about 30–60 cm in length. Most species spend their day burrowed underground or under vegetation, surfacing only at night or when it rains. Some species are arboreal and are ofter seen hiding in bromeliads in trees. They can change color from light]] (when they are active at night) to dark]] (inactive in the day). This color change is brought about by the movement of dark pigment granules. When threatened, they coil up into a tight ball. A more peculiar defensive behavior is their ability to bleed voluntarily from the eyes, mouth, and nostrils.

Colubridae

edit

Order: Squamata. Family: Colubridae

Colubridae (from Latin coluber, snake) is a family of snakes. This broad classification of snakes includes about two-thirds of all snake species on earth. The earliest species of the snake family date back to the Oligocene epoch. With 304 genera and 1,938 species, Colubridae is the largest snake family. Colubrid species are found on every continent except Antarctica. While most colubrids are nonvenomous]] (or have venom that is not known to be harmful to humans) and are mostly harmless, a few groups, such as genus Boiga, can produce medically significant bites.

Elapidae

edit

Order: Squamata. Family: Elapidae

Elapidae (Greek éllops = sea-fish) is a family of venomous snakes found in tropical and subtropical regions around the world, terrestrially in Asia, Australia, Africa, North America and South America and aquatically in the Pacific and Indian Oceans. Elapid snakes exist in a wide range of sizes, from 18 cm species of Drysdalia to the 5.6 m King Cobra, and are characterized by hollow, fixed fangs through which they inject venom. Currently, 61 genera that include 325 species are recognized. All elapids have a pair of proteroglyphous fangs that are used to inject venom from glands located towards the rear of the upper jaws. In outward appearance terrestrial elapids look similar to the Colubridae: almost all have long and slender bodies with smooth scales, a head that is covered with large shields and not always distinct from the neck, and eyes with round pupils. In addition, their behavior is usually quite active and most are oviparous. There are exceptions to all these generalizations: e.g. the death adders]] (Acanthophis) include short and fat, rough-scaled, very broad-headed, cat-eyed, live-bearing, sluggish ambush predators with partly fragmented head shields.

Viperidae

edit

Order: Squamata. Family: Viperidae

The Viperidae are a family of venomous snakes found all over the world, except in Antarctica, Australia, Ireland, Madagascar, Hawaii, various other isolated islands, and north of the Arctic Circle. All have relatively long, hinged fangs that permit deep penetration and injection of venom. Four subfamilies are currently recognized. The Crotalinae, commonly known as "pit vipers", are a subfamily of venomous vipers and are also the only viperids found in the Americas. They are distinguished by the presence of a heat-sensing pit organ located between the eye and the nostril on either side of the head. Currently, 18 genera and 151 species are recognized: 7 genera and 54 species in the Old World, against a greater diversity of 11 genera and 97 species in the New World. These snakes range in size from the diminutive hump-nosed viper,

References

edit
  1. ^ Cite error: The named reference ITIS-F was invoked but never defined (see the help page).

Campbell, Jonathan A. "Reptiles and amphibians of Guatemala - Checklist". University of Texas at Arlington, Department of Biology. Retrieved 2012-03-10.



2011 Van Earthquake
UTC time??
Magnitude7.2 Mw
Depth20 kilometres (12.427423844747 mi)[1]
Epicenter38°37′41″N 43°29′10″E / 38.628°N 43.486°E / 38.628; 43.486
Areas affected  Turkey
CasualtiesDeaths: Unknown Injuries: 50+


2011 Van Earthquake
UTC time??
Magnitude7.2 Mw
Depth20 km (12 mi)
Epicenter38°37′41″N 43°29′10″E / 38.628°N 43.486°E / 38.628; 43.486
Areas affected  Turkey
CasualtiesDeaths: Unknown Injuries: 50+


2011 Van earthquake struck eastern Turkey, Van on October 23, 2011. According to USGS, the earthquake occurred in 12.4 miles depth and in magnitude 7.2. [2] Local newspapers reported that the struck was strongly felt in Van Province. There are collapsed buildings and a high death toll is expected. [3] Buildings and infrastructure in Erciş district are seriously damaged, leaving the telephone and electric lines unusable. It affected the city of Van and neighbouring towns causing many buildings to collapse. Van's airport was damaged causing flight diversions. The epicentre was in the village of Tabanli in the east of the province. [4]

References

edit



List of detention centers in Guatemala

References

edit

Dirección General del Sistema Penitenciario. "Total de Reclusos y Reclusas que se encuentran en los diferentes centros de Detención del Sistema Penitenciario". Retrieved 2009-10-19.

Castañon, Mariela (19 de Septiembre de 2009). "La red de prisiones en el país. Un sistema a punto del colapso". La Hora. Retrieved 2009-10-19. {{cite web}}: Check date values in: |date= (help)


Magnitude Intensity MI BAKUN, W.H. and C.M. WENTWORTH (1997): Estimating earthquake location and magnitude from seismic intensity data, Bull. Seismol. Soc. Am., 87, 1502-1521.

Corrections to "Estimating earthquake location and magnitude from seismic intensity data" by W. H. Bakun Published in 1998, U.S. Dept. of the Interior, U.S. Geological Survey, Information Services, distributor] ([Menlo Park, CA], [Denver, Colo)


http://www.docstoc.com/docs/22767904/Magnitude-and-Location-of-Historical-Earthquakes-in-Japan-and


Toppozada, T. R. (1975). Earthquake magnitude as a function of intensity data in California and western Nevada. Bulletin of the Seismological Society of America 65, 1,223–1,238.

Toppozada, T. R., C. R. Real, and D. L. Parke (1981). Preparation of Isoseismal Maps and Summaries of Reported Effects for pre-1900 California Earthquakes. California Division of Mines and Geology Open-File Report 81-11, 182 pps.

Tousson Toppozada and David Branum. California earthquake history ANNALS OF GEOPHYSICS, VOL. 47, N. 2/3, April/June 2004 http://www.annalsofgeophysics.eu/index.php/annals/article/view/3317/3363


The Development of Earthquake Intensity Attenuation Model in Northern-China and Its Application in Quantitatively Estimating the Earthquake Location and Magnitude Zhang, Y.; Ma, G.; Shi, B.; Zhang, J. American Geophysical Union, Fall Meeting 2008, abstract #S13C-1812



Victims 2010 Haiti earthquake, according to RNW and Haitian government respectively:

Buried Unrecovered bodies Total   Government estimates
Léogâne (MM IX) 3364 1636 5000 20000-30000
Petit-Goâve, Grand-Goâve and Gressier (MM IX): 1347 20 1367 ?
Jacmel (MM VIII)[1] ? ? 400 4000
Port-au-Prince (MM VIII)
   main cemetry 18000 18000 ?
   other cemetries 7000 7000 ?
   mass graves in Titanyen 13000-20000 13000-20000 ?
   other (mass) graves 10000 10000 ?
Total buried victims ~ 62000 ?
Victims still in rubble 30000 30000 ?
Total death toll estimate ~ 91767 ~ 230000



Guatemala: Electricity sector
 
Data
Electricity coverage(2006) 83.1% (total), --% (rural), --% (urban); (LAC total average in 2007: 92%)
Installed capacity(2006) 2,039.1 MW
Share of fossil energy 62% (incl. 15% biomass in co-generating sugar plants)
Share of renewable energy 38% (hydroelectric & geothermal)
GHG emissions from electricity generation (2003) **1.57 MtCO2
Average electricity use (2006) 566,2 kWh per capita
Distribution losses (2006) 16.9%
Transmission losses (2006) **1.7%
Residential consumption (% of total) **33%
Industrial consumption (% of total) **n/a
Commercial consumption (% of total) **n/a
Average residential tariff (US$/kWh, 2006) **0.139; (LAC average in 2005: 0.115)
Average industrial tariff (US$/kWh, 2006) **0.103; (LAC average in 2005: 0.107)
Average commercial tariff (US$/kWh, 2006) **n/a
Annual investment in electricity **n/a
Institutions
Sector unbundling Yes
Share of private sector generation 65%
Competitive supply to large users Yes
Competitive supply to residential users No
Number of service providers 11 (generation), 1 (transmission), 5 (distribution)
National electricity regulator Yes (SIGET)
Responsibility for policy setting Ministry of Economy
Responsibility for renewable energy Ministry of Economy
Responsibility for the environment Ministry of Environment and Natural Resources (MARN)
Electricity Sector Law Yes (1996)
Renewable Energy Law Yes (2007)
CDM transactions related to the electricity sector 3 registered CDM project; 385,533 t CO2e annual emissions reductions

The Electricity sector in Guatemala is a relatively small but rapidly growing sector in Guatemala's economy.

the largest producer of geothermal energy in Central America. Except for hydroelectric generation, which is almost totally owned and operated by the public company CEL (Comisión Hidroeléctrica del Río Lempa), the rest of the generation capacity is in private hands. With demand expected to grow at a rate of 5% in the coming years, the Government’s 2007 National Energy Strategy identified several hydroelectric and geothermal projects as the best option to meet demand in the future and to diversify the country’s energy mix. This would also reduce the dependence on traditional thermal sources and, with that, the vulnerability to high oil prices that the country started to face in 2005. El Salvador is also one of the countries included in the SIEPAC project, which will integrate the electricity network of the country with the rest of the Central American region.

Electricity supply and demand

edit

Installed capacity

edit

El Salvador is the country with the highest geothermal energy production in Central America. Total installed capacity in 2006 was 1,312 MW, of which 52% was thermal, 36% hydroelectric and 12% geothermal. The largest share of generation capacity (65%) was in private hands. In terms of evolution, installed capacity has almost doubled in the last 20 years and increased by 200 MW since the year 2000. [1]

Gross electricity generation in 2006 was 5,195 GWh, of which 40% came from traditional thermal sources, 38% from hydroelectricity, 20% from geothermal sources, and 2% from biomass. [2]

Demand

edit

In 2006, total electricity sold in El Salvador was 4,794 GWh, which corresponds to 702kWh annual per capita consumption. The residential sector accounted for 33% of the consumption, with the unregulated market making up for 11% of the electricity consumed. [1]

Maximum demand in the wholesale electricity market was 881 MW, 6.3% higher than the figure for 2005. [3]

Demand versus supply

edit

Increase in maximum demand since the year 2000 has been matched by similar increases in installed capacity. Average annual increase in maximum demand has been 2.6%, while average increase in installed capacity has been 2.9%, with increase percentages above 6% for both measures for the year 2006. [1] The nominal reserve margin for the system in 2004 was 36%. Although high, this number does not capture the vulnerability of the generation system to particular unit outages, especially those related to hydroelectric capacity and availability. [4]

As for the future, demand is expected to grow at an annual rate of 5% in the coming years [2]. Peak demand is expected to grow from 833 MW in 2005 to 1,030 MW in 2010. Planning simulations indicate that the risk of power rationing is unlikely to occur until 2010 even if there is a delay in the commissioning of the SIEPAC interconnection. [4] The 2007 National Energy Strategy identifies the geothermal and hydroelectric projects more likely to be executed in order to close the gap between demand and supply in the future and to meet the objective of diversifying the country’s energy mix. [2]

Access to electricity

edit

In 1995, only 65.5% of the population in El Salvador had access to electricity. Currently, the electrification index is 83.4%. This coverage is higher than that in Guatemala (83.1%), Honduras (71.2%) and Nicaragua (55%) but lower than the one for Costa Rica (98.3%) and Panamá (87.1%) [1] and also below the 94.6 average for LAC [5]. Electrification in most major urban centers is estimated to be above 97%, whereas rural coverage is around 72%. The Ministry of Economy’s plans seek to reach a 93% rural electrification index by 2009. [4] This ambitious plan includes the expansion of the distribution network as well as the installation of photovoltaic solar panels in areas that are isolated from the network. [2]

Service quality

edit

Interruption frequency and duration

edit

In 2005, the average number of interruptions per subscriber was 12, while duration of interruptions per subscriber was 16 hours. This is very close to the weighted averages for LAC, which are 13 interruptions and 14 hours respectively. [5]

Distribution and transmission losses

edit

In 2006, distribution losses in El Salvador were 12.4%, only higher than those of Costa Rica (9.4%) and below the regional Central American average of 16.2% [1]. On the other hand, transmission losses were as low as 1.7% for the same year [3].

Responsibilities in the electricity sector

edit

Policy and regulation

edit

The regulatory entities for the electricity sector in El Salvador are:

  • The Electrical Energy Directorate (DEE - Dirección de Energía Eléctrica), created in 2001, is the administrative Unit within the Ministry of Economy that is in charge of elaborating, proposing, coordinating and executing policies, programs, projects and other actions in the electricity sector. [6]
  • The General Superintendence of Electricity and Telecommunications (SIGET) is the regulatory body for both the electricity and telecommunications sector. SIGET is in charge of regulating the power market, the distribution companies and consumer prices. [4]

In 2006, the President created the National Energy Council (CNE), which has the role of analyzing El Salvador’s energy situation as well as the Government proposals, recommending the inclusion of new actions and strategies. The CNE seeks to contribute to a shift in generation towards renewable energy and to modify consumption patterns toward the efficient use of energy.[2]

The Transactions Unit (UT) is the private company in charge of administering the wholesale electricity market, being in charge of system dispatch and performing clearing-house functions. [4] UT is also responsible for the operation of the transmission system.

Generation

edit

In 2006, there were 11 generation companies in El Salvador. Of the 22 generating plants, 18 were in private hands. The only public company with a stake in generation is CEL (Comisión Hidroeléctrica del Río Lempa), which owns 97% of the hydroelectric capacity. The number and type of plants operated by each company is as follows: [1]

Type Company name No. of plants Installed capacity (MW)
WHOLESALE MARKET 13 1,157.3
Public companies 4 460.3
Hydroelectric 4 460.3
CEL 4 460.3
Private companies 9 697
Geothermal 2 151.2
LaGeo 2 151.2
Thermal 7 545.8
CESSA 1 32.6
CLESA 1 0
Duke 3 318
Invers.Ene 1 51.2
Nejapa 1 144
RETAIL MARKET 9 155.5
Private companies 9 155.5
Hydroelectric 3 12.3
CECSA 1 8
De Matheu 1 1.5
Sensunapán 1 2.8
Thermal 6 143.2
Borealis 1 13.6
CASSA 1 29
EGI Holdco 1 5.5
Ing. Cabaña 1 21
Ing. Ángel 1 30
Textufil 1 44.1
TOTAL 22 1,312.8

Source: CEPAL 2007

Transmission

edit

In El Salvador, one government-owned company, Etesal (Empresa Transmisora de El Salvador), which was constituted in 1999 after the restructuring of CEL (Comisión Ejecutiva Hidroeléctrica del Río Lempa) [7], is responsible for the maintenance and expansion of the transmission system [3].

Distribution

edit

In El Salvador, there are five distribution companies. The market share for each of them in 2006 was: [1]

  • CAESS: 44%
  • Delsur: 25%
  • AES-CLESA: 18%
  • EEO: 10%
  • Deusem: 2%

CAESS, CLESA, EEO (Empresa Eléctrica de Oriente) and Deusem (Distribuidora Eléctrica de Oriente) are controlled by AES Corporation. [8]

Renewable energy resources

edit

The 2007 National Energy Policy supports the diversification and increase of energy sources, mainly through renewable energy such as hydroelectricity, geothermal, solar, wind power and biofuels (as well as mineral coal and natural gas). Besides hydroelectricity and geothermal energy, the government foresees the addition of 50MW of renewable generation in the next 10 years in the form of wind power, solar power, biomass and mini-hydroelectric plants [2].

In November 2007, El Salvador approved the Fiscal Incentives Law for the Promotion of Renewable Energy. This new legal framework includes incentives such as a 10 year tax exemption for projects below 10MW of generation capacity. [9] A new System for the Promotion of Renewable Energy (SIFER) contemplates the creation of a Revolving Fund for the Promotion of Renewable Energy (FOFER) that would provide soft loans and guarantees and assist in the financing of feasibility studies for new projects.[10]

Hydroelectricity

edit

Currently, hydroelectric plants account only for 36% of the electricity produced in El Salvador. The public company CEL (Comisión Hidroeléctrica del Río Lempa) owns and operates 97% of the capacity. [1] The four hydroelectric plants in El Salvador are: 5 de Noviembre (81.4 MW), Guajoyo (15MW), Cerrón Grande (135 MW), and 15 de Septiembre (156.3 MW), all of them on the Lempa River [3].

In this sector, the projects currently underway are:

  • Upgrading of the two units in the 15 de Septiembre plant with 24MW of new capacity
  • New hydroelectric plant, the 66 MW El Chaparral
  • New hydroelectric plant, the 261MW Cimarron Hydroelectric Power Plant

This expansion of the hydroelectric capacity would add 351MW to the system in the next 5 years, a 76% increase in current capacity. In addition, if the bi-national projects El Tigre (in the Lempa River) and El Jobo and Piedra de Toro (in the Paz River) with Honduras and Guatemala were carried out, 488MW of additional capacity would be added to the generation system. [2]

Wind

edit

El Salvador’s wind potential is currently being studied by Comisión Hidroeléctrica del Río Lempa (CEL) and the Finnish Meteorological Institute (FMI). [2]

Solar

edit

A solar map of the country is also under development. [2]

Geothermal

edit

Currently, there are two geothermal facilities in operation in El Salvador, the 95MW Ahuachapan, and the 66MW Berlin plant. Majority state-owned power company LaGeo, formerly Gesal, operates the two plants. LaGeo is currently expanding the two existing geothermal plants, as well as conducting a feasibility study for a third plant, Cuyanausul. It is expected that the three projects add 64 MW of installed electric generation capacity by 2007. [11]

The 2007 National Energy Strategy determines that potential geothermal capacity in El Salvador is about 450MW. Expansion plans could result in 183MW additional capacity in the period 2006-2014 (a 121% increase in the next 7 years), with projects to be developed in Ahuachapán (25MW), Berlín (50MW), San Vicente (54MW) and Chinameca (54MW). [2]

History of the electricity sector

edit

Early history

edit

Until the mid 1990s, the power sector in Salvador operated through the government owned Comisión Hidroeléctrica del Río Lempa (CEL), which provided generation, transmission and distribution services. The electricity sector restructuring that led to the unbundling of electricity generation, transmission and distribution and the horizontal division of generation and distribution into several companies was carried out in the period 1996-2000. The Electricity Law (Legislative decree No.843) and its secondary legislation were enacted in 1996 and 1997 respectively through initiatives led by the Electrical Energy Directorate (DEE) within the Ministry of Economy (MINEC). [4]. The General Superintendence for Electricity and Telecommunications SIGET) was created as part of the reform and assigned the responsibility of applying the sector laws and monitoring compliance with them [2].

The electricity Law in El Salvador is pretty unique as it affords a high degree of liberty to market agents. Article 8 explicitly authorizes vertical integration in generation, transmission, distribution and supply. The only limitation consists of prohibiting generation, distribution and supply companies from owning shares in Etesal (Empresa Transmisora de El Salvador, S.A. de C.V.), the transmission company that resulted from the restructuring of CEL. Such an allowance, together with the organization of a price-based spot market, is surprising in a small system with few operators.[4]

21st century developments

edit

The remuneration of generators in the spot market did not generate interest from private producers to obtain high returns and therefore install new capacity. As a result, the Government was concerned with the possibility that a lack of new generation capacity could lead both to higher spot prices and higher tariffs, lower reserve margins and eventually lead to a supply crisis in which it could be forced to invest in the sector. In order to address this problem, in 2003 and 2004, the Government instituted rules for allowing competitively-bid long-term contract prices to be reflected in consumer tariffs and empowered the regulator to shift to a cost-based market if evidence of market manipulation emerged. [4]

In July 2005, as a result of the high international oil prices, the government created the National Emergency Committee to Address High Oil Prices in an attempt to analyze and promote measures to minimize impacts. This Committee promoted certain specific actions such as the spreading out working schedules to reduce vehicle traffic. Less than one year after the creation of the Committee, the necessity to broaden its scope of action was acknowledged, which led to the creation, in July 2006, of the National Energy Council (CNE). The CNE will propose, manage and contribute to the agencies in charge of approving energy strategies that participate in the country’s socio-economic development in harmony with the environment. [2]

In May 2007, the Salvadoran government produced its National Energy Policy, whose main objectives are: (i) ensuring proper, continuous, quality and reasonably priced energy supply; (ii) reduce vulnerability in energy provision through diversification of the country’s energy sources; (iii) minimize environmental impacts; and (iv) increase energy services coverage to the population and to the economic sectors. The specific objectives and strategic lines of the National Energy Policy include: (i) diversification and increase of energy sources; (ii) expansion of coverage; (iii) promotion of market efficiency and establishment of clear and stable rules; (iii) promotion of energy efficiency; and (iv) support for energy integration.[2]

Since November 2007 the Salvadoran government has been evaluating a Natural Gas law, since Natural Gas is not included nor regulated under the current Hydrocarbons Law. [12][13] This move has been propitiated because of a new large scale natural gas project being developed by Cutuco Energy Central America. This project will use Natural Gas to generate 525MW, more than half of what is currently generated in El Salvador.[1]

Regional integration, the SIEPAC project

edit

In 1995, after almost a decade of preliminary studies, the Central American governments, the government of Spain and the Inter-American Development Bank agreed to the execution of the SIEPAC project. This project, together with the Plan Puebla Panama aims at the electric integration of the region. Feasibility studies showed that the creation of a regional transmission system would be very positive for the region and lead to a reduction in electricity costs and to improvements in the continuity and reliability of supply. In 1996, the six countries (Panama, Honduras, Guatemala, Costa Rica, Nicaragua and El Salvador) signed the Framework Treaty for the Electricity Market in Central America.[14]

The design of the Regional Electricity Market (MER) was done in 1997 and approved in 2000. MER is an additional market superimposed on the existing six national markets, with a regional regulation, in which the agents authorized by the Regional Operational Body (EOR) carry out international electricity transactions in the region. As for the infrastructure, EPR (Empresa Propietaria de la Red S.A.) is in charge of the design, engineering, and construction of about 1,800 km of 230kV transmission lines. [14] The project is expected to be operational by the end of 2008 [11].

(For a map of the regional transmission line, see SIEPAC)

Tariffs and subsidies

edit

Tariffs

edit

Electricity prices are regulated by SIGET. They comprise generation, transmission, distribution, and supply components. [4] In 2005, the average residential tariff in El Salvador was US$0.139 per kWh, which is above the US$0.105 per kWh weighted average for LAC. In contrast, the average industrial tariff for El Salvador, US$0.103 per kWh was below the US$0.107 per kWh average for LAC[5].

Electricity prices vary considerably from one distribution company to another. Small (high cost) consumers have high prices and larger (lower cost) consumers have lower prices. This is an indication that tariffs in El Salvador reflect costs better than those in other countries. [4]

Subsidies

edit

For residential users with consumption levels below 100 kWh, 86% of the difference between the full tariff and the maximum prices established in November 1999 is subsidized. Those maximum prices are: [3]

  • US$ 0.0640 per kWh for monthly consumption between 1kWh and 50kWh
  • US$ 0.0671 per kWh for monthly consumption between 50kWh and 99kWh

In 2006, according to the available data, 809,536 users (i.e. 60.6% of the clients connected the distribution network) were subsidized. Together, these consumers accounted for 10.6% of the total energy demand at the distribution level. [3]

Investment and financing

edit

Expansion plan requirements include, in addition to generation additions, transmission investments (including 230kV lines that link with the SIEPAC interconnection) and distribution investments, including rural electrification. Investment requirements for the period 2005-2009 were estimated as follows: [4]

($US million) Total Public Private Public/ Private
Generation 298 8 84 206
Transmission 47 47
Distribution 84 84
Rural electrification 101 83 18
TOTAL 530 138 186 206

Source: World Bank 2006

Public/private partnerships constitute the major source of financing for generation. They include investments in geothermal facilities through La Geo and its strategic investor, which are likely to go ahead; other investments in this category include the Chaparral power plant ($143 million). It is also important to note that these estimates are just for investments required within El Salvador. They do not take into account financing required for the 300 MW of firm generation capacity assumed to be available from regional sources through the SIEPAC line. [4]

Rural electrification

edit

The budgeted investment in rural electrification during 2004-2009 amounts to around US$100 million, financed as summarized in the following table: [4]

($US million) Government Municipalities Distribution companies Total
Isolated systems 12 9.6 2.4 24
New lines 28.8 28.8 14.4 72
Substations 3.8 1.3 5
TOTAL 44.6 38.4 18.1 101

Source: World Bank 2006

Rural electrification projects are executed mainly through the Social Investment Fund for Local Development (FISDL), in operation since 1990. The FISDL has executed a large number of projects totaling over US$400 million, although it has faced obstacles to achieve its goals, mainly due to a lack of secure financing. [4]

One of the most ambitious projects for rural electrification will be carried out during the next 5 years in the North of the country through a co-investment project of the Government with the Millennium Challenge Account (MCA) in 94 municipalities. The goal of the project is to increase service coverage from the current 78% to 97% in 2012. Total investment required has been estimated at US$40 million. [2] This project will be implemented through the Electricity and Telephone National Investment Fund (FINET). According to the FINET Creating Law, resources for the construction and improvement of electrical infrastructure will be granted through the auctioning of subsidies. For the allocation of funds to implement this rural electrification sub-activity, electricity distribution companies, authorized by the Electricity and Telecommunications Superintendence (SIGET) will be able to participate. [15]

Summary of private participation in the electricity sector

edit

Until the mid 1990s, the power sector in Salvador operated through the government owned Comisión Hidroeléctrica del Río Lempa (CEL), which provided generation, transmission and distribution services. The electricity sector restructuring that led to the unbundling of electricity generation, transmission and distribution and the horizontal division of generation and distribution into several companies was carried out in the period 1996-2000.

In 2006, there were 11 generation companies in El Salvador, with 18 out of 22 generation plants in private hands and 97% of hydroelectric capacity owned by the public company CEL (Comisión Hidroeléctrica del Río Lempa. As for transmission, it is in the hands of one government-owned company, Etesal (Empresa Transmisora de El Salvador), while distribution is controlled by five privately-owned companies.

Activity Private participation (%)
Generation 65% of installed capacity
Transmission 0%
Distribution 100%


Electricity and the environment

edit

Responsibility for the environment

edit

The Ministry of Environment and Natural Resources (MARNA) is the institution in charge of the conservation, protection and sustainable use of the natural resources and the environment.

Greenhouse gas emissions

edit

OLADE (Latin American Energy Association) estimated that CO2 emissions from electricity production in 2003 were 1.57 million tons of CO2, which corresponds to 25% of total emissions from the energy sector [16].

CDM projects in electricity

edit

Currently (November 2007), there are three registered CDM projects in the electricity sector in El Salvador, with overall estimated emission reductions of 385,553 tCO2e per year. One of the projects is a landfill gas project, another one a bagasse cogeneration project and the third one a geothermal plant project. [17]

External assistance

edit

Notes

edit
  1. ^ a b c d e f g h CEPAL 2007
  2. ^ a b c d e f g h i j k l m n Gobierno de El Salvador 2007
  3. ^ a b c d e f SIGET 2007
  4. ^ a b c d e f g h i j k l m n World Bank 2006
  5. ^ a b c Benchmarking data of the electricity distribution sector in Latin America and Caribbean Region 1995-2005 Cite error: The named reference "Benchmarking" was defined multiple times with different content (see the help page).
  6. ^ Ministry of Economy
  7. ^ Etesal
  8. ^ Superintendencia de Competencia
  9. ^ La Prensa Gráfica
  10. ^ Ministry of Economy-SIFER
  11. ^ a b Energy Information Administration
  12. ^ En espera de discusión ley de gas natural. El Diario de Hoy 15 de Noviembre 2007
  13. ^ Diputados reciben la esperada ley de gas natural. La Prensa Gráfica 16 de Noviembre 2007
  14. ^ a b SIEPAC project
  15. ^ FOMILENIO
  16. ^ OLADE
  17. ^ UNFCCC

References

edit

See also

edit
edit

Generation companies

edit

Transmission company

edit

Distribution companies

edit


Category:Electricity sector by country|Guatemala]] Category:Energy in Guatemala]]