Talk:Interstate 475 (Ohio)
Latest comment: 1 year ago by NintendoTTTEfan2005 in topic Is this highway a partial beltway?
This article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||||||||
|
History mentions the Turnpike
editNotice a terminus being moved from "turnpike". How was the terminus handled up to that time? I ask this because it says, for the present configuration, there is no connection to the turnpike, and you'd have to drive about 2 miles on non-expressway to connect between I-475 (Ohio) & Ohio Turnpike. — Preceding unsigned comment added by 128.63.16.20 (talk) 15:38, 4 October 2013 (UTC)
- The terminus was near Perrysburg, at the current I–75 interchange with US 20. I–75 was planned to follow a route closer to the current Ohio State Route 25 route. Detcin (talk) 17:01, 4 October 2013 (UTC)
Is this highway a partial beltway?
editThis is a question I was wondering since when you look at its design, it is about half of a full loop. So can it be classified as a partial beltway? NintendoTTTEfan2005 (talk) 21:35, 10 September 2023 (UTC)