Wikipedia:Tambayan Philippines/Task force Transportation/to do

Please see the articles proposed to be created and those that need attention.

Planned articles

edit
  • 2015 PNR Metro South Commuter derailment — derailment that caused the indefinite suspension of PNR MSC services and led to the creation of bills on public transportation.
  • SMC MRT 7 Rotem EMU — rolling stock to be used on MRT Line 7 (Metro Manila)
  • Verify claims on the lead paragraph, particularly the following:
    • Numbering scheme, with emphasis on the sentence "The numbering scheme has since been confirmed to be EM1000 by the General Manager" as the reference cited is unsuitable.
    • First standard gauge trains of PNR
    • First electric traction trains of PNR. This could be contested since some existing PNR trains have electric traction motors.
  • Verify train formation numbering
  • Reduce jargons
  • Remove unverified information
  • Include updated information regarding the Lucena–San Pablo service

Templates

edit
  • Agreement must be made on the correct arrangement of stations at the Common Station for the rail map templates
  • Cleanup required

Modules

edit
  • Updating required for colors