Wikipedia:Tambayan Philippines/Task force Transportation/to do
Please see the articles proposed to be created and those that need attention.
Planned articles
edit- 2015 PNR Metro South Commuter derailment — derailment that caused the indefinite suspension of PNR MSC services and led to the creation of bills on public transportation.
- SMC MRT 7 Rotem EMU — rolling stock to be used on MRT Line 7 (Metro Manila)
- Verify claims on the lead paragraph, particularly the following:
- Numbering scheme, with emphasis on the sentence "The numbering scheme has since been confirmed to be EM1000 by the General Manager" as the reference cited is unsuitable.
- First standard gauge trains of PNR
- First electric traction trains of PNR. This could be contested since some existing PNR trains have electric traction motors.
- Verify train formation numbering
- Reduce jargons
- Remove unverified information
- Include updated information regarding the Lucena–San Pablo service
Templates
edit- Agreement must be made on the correct arrangement of stations at the Common Station for the rail map templates
- Cleanup required
Modules
edit- Updating required for colors