West Virginia Route 108

West Virginia Route 108 is the designation given to a highway currently open that is intended to be a part of Interstate 73 (I-73) and I-74. The first section opened near Bluefield. The state started this route in 2007, but the West Virginia Department of Transportation (WVDOT) did not have the funding to connect it to other roadways.[1] This delayed opening to traffic until 2023.[2]

West Virginia Route 108 marker

West Virginia Route 108

King Coal Highway
Route information
Maintained by WVDOH
ExistedDecember 13, 2023–present
Major junctions
South end US 52 / US 460 near Bluefield
North end WV 123 near Bluefield
Location
CountryUnited States
StateWest Virginia
Highway system
WV 107 WV 112

Route description

edit

WV 108 is a four-lane divided freeway up until Christine West Bridge; lanes on each side are currently being constructed so that the freeway will extend to Airport Road. WV 108 currently goes from US 52 and US 460 to WV 123 (Airport Road).

History

edit

Future

edit

WV 108 is planned to run from WV 65 and Corridor G (US 119) near Belo, to I-77 at its US 52 interchange near Bluefield.[3] The Coalfields Expressway (US 121) and the Shawnee Expressway will connect to the King Coal Highway.

The West Virginia Division of Highways (WVDOH) announced an extension towards Littlesburg Road and are planning to start construction in mid-to-late 2024. The extension is 2.4 miles (3.9 km) long, and before WVDOH will have to make a bridge over Littlesburg Road they will stop construction, and continue it after the next extension. The extension will be built four lanes.[4] The extension from Littlesburg Road to Montcalm is in planning stages.[5]

WV 108 is currently a four-lane freeway up until the Christine West Bridge; after the bridge it turns into a two-lane highway. Construction is underway to turn it four lanes to WV 123 (Airport Road).

Exit list

edit

The entire route is in Bluefield, Mercer County.

mikmExitDestinationsNotes
   US 52 / US 460 – BluefieldOpened in December 2023
  WV 123 (Airport Road)Opened in December 2023; completed interchange starts construction in mid-to-late 2024
  WV 20 (Littlesburg Road)Construction to start in mid-to-late 2024
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

edit
  1. ^ "'Bridge to Nowhere': USA Today chronicles long-struggle for completion". Bluefield Daily Telegraph. March 10, 2017. Retrieved June 24, 2024.
  2. ^ "No Longer 'The Bridge to Nowhere': Ribbon Cutting Opens New Section of King Coal Highway". West Virginia Public Broadcasting. December 14, 2023. Retrieved June 24, 2024.
  3. ^ West Virginia Department of Transportation (n.d.). "Executive Summary.". King Coal Highway. n.p.: West Virginia Department of Transportation.
  4. ^ "People learn more about the next King Coal Highway segment". Bluefield Daily Telegraph. February 21, 2024. Retrieved June 24, 2024.
  5. ^ "Gov. Justice cuts ribbon to open 'Bridge to Nowhere' and major section of King Coal Highway near Bluefield". Office of the Governor. December 13, 2023. Retrieved June 25, 2024.