550 South Tryon (formerly the Duke Energy Center) is a 786-foot (240 m) tall,[1] 48-floor (54 floors including mechanical floors) skyscraper in Charlotte, North Carolina.

550 South Tryon
Map
Former namesDuke Energy Center
General information
StatusCompleted
TypeOffice building
Location550 South Tryon Street
Charlotte, NC
Coordinates35°13′26.48″N 80°50′53.28″W / 35.2240222°N 80.8481333°W / 35.2240222; -80.8481333
Construction startedFebruary 28, 2006
OpeningJanuary 2010; 14 years ago (January 2010)
Cost$880 million
OwnerWells Fargo
Height
Roof786 feet (240 m)[1]
Technical details
Floor count48 floors (54 in total with mechanical floors)
Floor area1,370,214 square feet (127,297.0 m2)[2]
Design and construction
Architect(s)tvsdesign
Structural engineerTRC Worldwide Engineering, Inc.
Main contractorBatson-Cook Company
subcontractors: Boda Plumbing, Inc.; J Davis Contracting Juba Aluminum Products Co., Inc.
Other information
Public transit accessLight rail interchange Brooklyn Village
Website
www.childressklein.com/550-s-tryon
References
[3][4]

When completed in 2010, it was the largest building in Charlotte (in square footage), second tallest building in Charlotte, 63rd tallest building in the United States, and the tallest in the world to use precast double tees.[5]

History

edit

Duke Power chief executive Bill Lee had put together the property in the 1990s, intending to build Duke's headquarters there, but the company dropped its plans and sold the land to Wachovia.[6]

Development Years

edit

Originally, the building was to be known as the Wachovia Corporate Center. It was to replace One Wachovia Center as the headquarters of Wachovia. Wachovia was to occupy 450,000 square feet (42,000 m2)[7] of the 1.5 million square feet (140,000 m2) tower. The first floor of the building was to contain the main lobby and elevators. The second floor was to have Wachovia's server room. The third floor would have been occupied by training areas during the day and classrooms at night. This area was to have been shared by Wachovia and Wake Forest University, which was to use it for its MBA courses. Floors four through seven were to contain the trading floor. It would have taken up 45,000 square feet (4,200 m2) and housed approximately 750 traders per floor.[8] Wachovia would also have used floors 36 through 48.

After Wells Fargo announced its purchase of Wachovia, Duke (by this time called Duke Energy) more than doubled the space it planned to use from 240,000 square feet (22,000 m2) to 500,000 square feet (46,000 m2) and the name changed to Duke Energy Center. In addition to the upper floors Wachovia would have used, Duke planned to use floors 15 through 22. Wells Fargo, which still owned the building,[9] planned to occupy five of its 14 floors late in 2010.[4][10] KPMG and Katten Muchin Rosenman moved into the building in February 2010, while Duke Energy moved later in 2010.[4]

Originally law firm Sonnenschein announced it would lease 35,000 square feet (3,300 m2) on the 34th and 35th floors and Deloitte leased 82,000 square feet (7,600 m2) of space.[11][12] After acquiring Wachovia, Wells Fargo still had reserved 400,000 square feet (37,000 m2) of space. However, in September 2009 the company stated they were open to leasing out 25% of that space. At that time they were committed to using 10 floors of the building.[13]

Prior to Wells Fargo purchasing Wachovia, Duke Energy was planning to occupy 240,000 square feet (22,000 m2) of space.[13] In February 2009, Duke announced it would occupy 500,000 square feet (46,000 m2) and become the building's primary tenant. The building was rebranded as Duke Energy Center. Duke announced plans to occupy floors 15 through 22 and 36-48.[14]

Originally, Wake Forest University had planned to locate the Charlotte campus of its Babcock Graduate School of Management in the tower, occupying approximately 25,000 square feet (2,300 m2). However, Wake Forest pulled out of the project after the purchase of Wachovia by Wells Fargo.[15]

Post-Completion

edit

In August 2010 Commercial real estate firm Cassidy Turley announced it had signed a lease to occupy 11,000 square feet (1,000 m2) on the 34th floor of the building. The firm will taking part of the 35,000 square feet (3,300 m2) formerly leased by law firm Sonnenschein Nath & Rosenthal in 2008. In 2009 the law firm closed its Charlotte office.[16]

In August 2012 Babson Capital Management announced they have signed a lease for 34,000 square feet (3,200 m2) in the building on the 33rd and 34th floors. The move gave the company a 50% space increase from its former space in Charlotte Plaza. The extra space was to support the company's 49% in the last 63 years.[17]

In November 2012 Wells Fargo started utilizing 300,000 square feet (28,000 m2) for several trading floors. The new space could hold 1,500 employees spread across two trading floors. It became the bank's largest hub for the bank's investment banking and capital markets division.[18]

Wells Fargo has announced it would exit its lease at One Wells Fargo Center at the end of 2021. Currently it is the largest tenant with 500,000 square feet (46,000 m2). The company has been consolidating its Charlotte footprint with leasing the entire 300 South Brevard building,[19] expanding their employee space in the building following Duke's departure,[20] and relocating additional employees in Three Wells Fargo Center.

550 South Tryon

edit

Duke Energy's departure left several large blocks of continuous space available, including 224,776 square feet (20,882.4 m2) on floors 7 to 14, 148,469 square feet (13,793.2 m2) on 15 to 21, 59,132 square feet (5,493.5 m2) on 30 to 32 and 47,403 square feet (4,403.9 m2) on the top floors, 40 to 42.[19] As of December 31, 2021, Duke had exited its lease of the building. All Duke employees left the building before the holidays. The Duke Energy Center signs and plaques were removed and the building was temporarily renamed 550 South Tryon.[5] After Wells Fargo moves into space previous occupied by Duke Energy the company will occupy 95% of the building. The bank will be renovating 21 floors of the building and the food court.[21]

Construction

edit
 
The Duke Energy Center under construction in summer 2009
 
Photo taken from Bank of America Stadium (Nov. 2008)

The project was announced in the spring of 2004, and official renderings were not released until December 6, 2006. In the original petition to the Charlotte-Mecklenburg Planning Commission, the building was going to be built on a 1.29-acre (5,200 m2) parcel next to 400 South Tryon, with a height of 510 feet (160 m) and 34 floors. The site preparation began with the demolition of a Firestone Tire dealership in February 2006, and on February 28, 2006, the excavation and blasting of a 100-foot (30 m)-deep hole for the below-grade parking garage began. Over 600,000 pounds (270,000 kg) of explosives were used during its excavation and it took just over 60,000 dump truck loads to remove all of the excavated material from the site, some of which was used in the construction of a third runway at Charlotte-Douglas International Airport.[22]

The building was constructed by Batson-Cook Construction, with ready mix products from Concrete Supply Co. and structural engineering firm TRC International Ltd, of Sarasota, Florida. The building core is constructed with poured-in-place concrete while the floor structures utilize precast double tees, a structural method typically seen in parking decks. These double tees span between the poured-in-place core and perimeter systems. The concrete used for the building is 18,000 pounds per square inch (120,000 kPa).[8]

The building received a certificate of occupancy on December 23, 2009, with the lobby and parking garage opening on January 2, 2010.[4]

Features

edit
 
View of Duke Energy Center in October 2010, showing aperture near the top

It is the tallest building in the Levine Center for the Arts (formerly the Wells Fargo Cultural Campus) and the largest building in Charlotte, which will have a 250,000-square-foot (23,000 m2) footprint. The complex will also include a 46-floor condominium tower (future), the Harvey B. Gantt Center for African-American Arts + Culture, the Mint Museum Uptown, the Knight Theater, the Bechtler Museum of Modern Art, and a History Museum.[23] The building has achieved LEED Platinum status by including water-saving plumbing devices, a water storage system that will treat rainwater to be used for cooling tower make-up water, and a green roof. Rock that was blasted for the parking structure is being recycled by hauling it to a local quarry, where it will be crushed for gravel.

The facade of the structure is illuminated by hundreds of programmable color-changing LED and metal halide luminaires with design work by Gabler-Youngston Architectural Lighting Design. The facade lighting system provides various shows and effects. Due to the tower's high visibility over the east corner of Bank of America Stadium, the LED lights are used during key moments of sporting events played there. For example, if the Carolina Panthers are playing, the tower lights up blue for Panthers touchdowns. During the ACC Championship Game, whenever a team scores a touchdown, it lights up in that team's color.

See also

edit

References

edit
  1. ^ a b "Duke Energy Center". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
  2. ^ Sharipo, Amy (22 October 2022). "Charlotte's largest office buildings". Charlotte Business Journal. Retrieved 24 December 2022.
  3. ^ "Wachovia Corporate Center". skyscraperpage.com. Retrieved 2008-05-27.
  4. ^ a b c d Rothacker, Rick (2010-01-02). "Roof with a view". The Charlotte Observer. Retrieved 2010-01-16.[permanent dead link]
  5. ^ a b Downey, John (2022-01-11). "Duke Energy exits former HQ as it awaits completion of new uptown tower". Charlotte Business Journal. Retrieved 2022-01-12.
  6. ^ Downey, John (2009-03-02). "Duke Energy moving HQ to Wachovia site". Charlotte Business Journal. Retrieved 2014-03-19.
  7. ^ "Wachovia tower to become Duke Energy Center | WCNC.com | Local News for Charlotte, North Carolina | Top Stories". WCNC.com. 2009-02-26. Archived from the original on 2013-02-09. Retrieved 2009-03-05.
  8. ^ a b "Wachovia Corporate Center". Batson-Cook Construction. Archived from the original on October 6, 2008. Retrieved 2008-05-27.
  9. ^ Downey, John (2009-02-26). "Duke moves HQs to Wachovia tower". Charlotte Business Journal. Retrieved 2014-03-19.
  10. ^ "Wells Fargo Completes Wachovia Purchase". Wells Fargo. 2008-12-31. Retrieved 2009-01-01.
  11. ^ "Wachovia Corporate Center". Charlotte Business Journal. 2008-02-06. Retrieved 2008-05-27.
  12. ^ "Deloitte inks lease for Wachovia Corporate Center". Charlotte Business Journal. 2008-06-17. Retrieved 2003-07-08.
  13. ^ a b Stabley, Susan (28 September 2009). "Wachovia a year later: Duke Energy steps in to fill a void". Charlotte Business Journal. Retrieved 11 October 2022.
  14. ^ Downey, John (27 February 2009). "Duke moves HQs to Wachovia tower". Charlotte Business Journal. Retrieved 11 October 2022.
  15. ^ "Wake Forest nixes plans for uptown tower". Charlotte Business Journal. 2009-05-22. Retrieved 2009-05-22.
  16. ^ Boye, Will (9 August 2010). "Cassidy Turley moves up by taking tower sublease". Charlotte Business Journal. Retrieved 11 October 2022.
  17. ^ O'Daniel, Adam (24 August 2012). "Babson Capital expanding in its move to Duke Energy Center". Charlotte Business Journal. Retrieved 11 October 2022.
  18. ^ O'Daniel, Adam (30 November 2012). "Wells Fargo to open trading floors". Charlotte Business Journal. Retrieved 11 October 2022.
  19. ^ a b Fahey, Ashley (15 July 2020). "RENDERINGS: Uptown tower to undergo overhaul as Wells Fargo set to leave big vacancy". Charlotte Business Journal. Retrieved 5 June 2021.
  20. ^ Fahey, Ashley (2021-05-17). "Duke Energy to exit current HQ building in uptown after company's new tower delivers". Charlotte Business Journal. Retrieved 2021-05-17.
  21. ^ Graham, Symone (31 January 2023). "Wells Fargo to fill former Duke Energy building and invest in University-area campus". Charlotte Business Journal. Retrieved 13 February 2023.
  22. ^ "Wachovia Corporate Center". Emporis. Archived from the original on October 25, 2004. Retrieved 2008-05-27.{{cite web}}: CS1 maint: unfit URL (link)
  23. ^ "Wachovia Corporate Center". putzmeister.com. Archived from the original on 2011-10-03. Retrieved 2008-05-27.
edit