Vallco Shopping Mall (formerly called Cupertino Square and originally Vallco Fashion Park) is a mostly-demolished dead mall located in Cupertino, California, United States. Originally built as a single-story shopping mall in 1976 with a lower level added in 1988 and a third-level movie theater added in 2007, it was anchored for most of its existence by Macy's, Sears, and J.C. Penney. As of August 2022[update], the mall is owned by Sand Hill Property Co. and is almost entirely vacant, with Cupertino Ice Center (formerly the Ice Capades Chalet), Bowlmor Lanes, and Benihana as the only remaining tenants, all in the section to the east of Wolfe Road. The larger western portion of the main mall structure was demolished in August 2019 and the pedestrian overpass was demolished in March 2020; plans for the site include a mixed-use development consisting of office space, housing, and retail.[1][2]
Location | Cupertino, California, U.S. |
---|---|
Coordinates | 37°19′35″N 122°00′52″W / 37.3263°N 122.0144°W |
Address | 10123 N Wolfe Road |
Opening date | September 1, 1976 |
Developer | Vallco Fashion Park Venture (Phillip Lyon, Gordon & Co. and Vallco Park Ltd.) |
Owner | Sand Hill Property Co. |
No. of stores and services | 140 (1976) 190 (1988) |
No. of anchor tenants | 0 (originally 4) |
Total retail floor area |
|
No. of floors | 2 (formerly 3 with AMC Theatres) |
A plan by Sand Hill to rebuild Vallco as a mixed-use development with retail, housing, and office space topped by a green roof park was cancelled after Cupertino voters rejected Measure D on the November 2016 ballot.[3] After obtaining community input in the planning phase,[4] the project ran into significant push-back from citizens who wanted to freeze the site as retail-only, citing concerns about traffic and schools.[5]
In 2018, Sand Hill proposed a revised development plan under the auspices of SB 35, which has been approved by Cupertino, containing 2,402 apartments, 1.8 million square feet of office space, and 400,000 square feet of retail.[6] Of the apartments, half of them will be affordable with no government subsidies, which would quintuple Cupertino's affordable housing stock. [7]: 1 [8]: 1 [9]: 1 [10]
Major stores and activities
editVallco was formerly anchored by the following department stores:
- Macy's (originally Bullock's, then Emporium and later Emporium-Capwell) (closed March 15, 2015)
- Sears (closed October 4, 2015)
- J. C. Penney (closed April 8, 2016)
- I. Magnin (closed 1992,[11] later became Express and finally Dynasty Seafood Restaurant on its lower level)
AMC Theatres also left the mall on March 22, 2018. Currently, the primary attractions are Bowlmor Lanes and Cupertino Ice Center; Benihana also remains active at the mall in its original location. All of the current occupants have exterior entrances; the interior hallways of the mall have been closed to public access since late 2018.
Vallco also formerly hosted the Pacific Coast Farmers' Market in the parking lot behind J. C. Penney. The market's last day at Vallco was December 30, 2016, after which it relocated to nearby Creekside Park.[12]
History
editOrigins and expansion
editIn the early 1970s, the Cupertino city council held public hearings on the possible locations of a regional shopping center in the city. After it decided the city could only support one center, the Vallco group found itself competing with another group led by orchard owner Paul Mariani Jr. In 1973, the city council decided it wanted the regional shopping center on the edge of the city and gave the proper zoning to Vallco.[13]
Vallco Fashion Park held its grand opening at 6:00pm on September 1, 1976. In its first several years, the mall's main walkway was punctuated by several parks showcasing aspects of local history, ranging from apricots to Klystron tubes.[14] Vallco was one of the largest shopping centers in Silicon Valley and soon drew customers from all over the region.
One of the early features of the mall was the ice skating rink attached to the shopping center. The Ice Capades Chalet, open for almost ten years, began to encounter trouble in 1986, when proposals to close it and replace it with movie theatres emerged (not to be confused with the more recent AMC Theatres, which was instead built on a new third level over the central portion of the mall). By June 3, 1988, the rink faced imminent closure, until the Cupertino City Council stepped in and kept the rink open when faced with vocal protest. At the time, the ice rink was one of two year-round skating rinks nearby – the other being the Ice Capades Chalet at San Mateo Fashion Island.
It was also the first place that sold San Jose Sharks merchandise, before the SAP Center (formerly called the San Jose Arena and the HP Pavilion) was built.
Beginning in 1986, increased competition from other regional malls such as Stanford Shopping Center and in particular Valley Fair (renovated into an indoor shopping mall that year) began to cause Vallco trouble. Foot traffic began to rapidly decline, and tenants began to move to these competing malls. In July 1988, an $20 million expansion for Vallco was announced, which added a lower level and 50 stores, increasing the total store count from 140 to 190.[15] Ultimately, this expansion was completed in August 1988, adding a total of 60 stores.[16]
On the weekend of August 11, 1990, Tilt Family Entertainment Center opened on the lower level (where the original food court used to be).[17]
Deterioration and renovation
editOccupancy began to decline in the 1990s, and the emptying of the mall continued until 2019. One reason for this decline was that the selection of mid-range stores didn't reflect the affluence of the surrounding populace.[citation needed]
Early 2000s
editAlan Wong, Emily Chen, and John Nguyen bought Vallco and began renovation of the mostly empty mall in 2005. By 2006, Vallco had the lowest occupancy rate of any mall in the area, at just 24 percent. One of the changes made to Vallco as part of these new renovations was to completely close the mall's lower level in 2005 with a handful of exceptions including Cupertino Ice Center, Tilt Family Entertainment Center (two years later Strike Bowling, then Bowlmor Lanes), and Dynasty Seafood Restaurant, leaving the focus on the second floor. From there, new tenants were pulled in over the next few years.
In 2006, Cupertino voters prevented re-zoning of part of the Vallco property for condominiums by overturning a re-zoning ordinance that was passed by the city council. The loss of the revenue that was expected from this sale contributed to the financial problems of the owners. The contractor for the movie theater, DPR, filed a mechanic's lien against the owners for approximately US$10 million in July 2007, which was settled the following September when Orbit Resources acquired the mall.
Vallco Fashion Park's name was changed to Cupertino Square in 2007.[18] Later that year, the owners sold three parcels of land to Evershine Property Management and sold a controlling stake of the mall to Orbit Resources,[19] which switched managing agents from Landmark Property Management to Jones Lang LaSalle.[20]
On May 4, 2007, a new 16-screen AMC movie theater opened in the center of the mall, coinciding with the theatrical release of Spider-Man 3. The grand opening of this highly anticipated film and the theater was heavily marketed towards the students of nearby Cupertino High School. During construction, on February 27, 2006, strong winds toppled a 30-ton crane onto the mall, puncturing a substantial hole in the roof and resulting in water damage to several stores.[21]
On July 20, 2007, a new bowling alley called Strike Bowling opened at the former location of Tilt Family Entertainment Center, and access to it from Cupertino Ice Center was closed off. In November 2010, the bowling alley was renamed Bowlmor Lanes.
Renovation of the mall that began in 2005 continued. By 2009, two new parking structures were added to the complex. Future plans at the time included new shops facing the street at the corner of Wolfe Road and Vallco Parkway, a seismic upgrade of the parking garage west of the theaters and the main mall structure, two new hotels, and a Hofbrau beer hall adjacent AMC Theatres. The bankruptcy filing in 2008 derailed these plans.
In September 2008, the two owners of the complex filed for bankruptcy to prevent the primary financier, Gramercy Capital, from foreclosing on their property. According to Gramercy, the assets of the company fell well below the debt owed, though the consortium disputed this.[22]
In September 2009, Vietnamese food processing company Son Son Co. purchased Cupertino Square for US$64 million in an all-cash transaction. The new owners restored the name Vallco Shopping Mall.[23]
Current ownership
editIn October 2014, Sand Hill Property Co. purchased the Macy's, J. C. Penney, and Sears sites for approximately US$200 million.[24] In November 2014, Sand Hill completed purchase of the entire mall for a total of US$320 million, the first time the entire mall including the anchor stores had been under the same ownership.[25][26][4]
In January 2015, J. C. Penney and Macy's announced plans to close their Vallco locations;[27][28] Sears also announced that its store would close in October 2015.[4] These left Vallco without any anchor tenants.
In August 2015, Sand Hill announced a plan to demolish the mall and replace it with The Hills at Vallco, a retail, office, and residential development based on a street grid. It was to be covered with the world's largest green roof, to be occupied by a city park. Rafael Viñoly Architects and OLIN Landscape Architects were selected as chief designers of the project.[4]
In November 2016, voters rejected two ballot initiatives related to Vallco:[29] Measure C, which would have attempted to freeze Vallco as a retail center without offices or housing, in addition to imposing additional restrictions on development options throughout the city, and Measure D, which would have approved the proposed Hills at Vallco project, bypassing standard city approval processes.[3][30][31] In the wake of the votes, Sand Hill announced it would stop investing in the mall. Managing Director Reed Moulds said the company "will not sell the land nor make investments into the current failed asset. In order for us to invest in Vallco we have to be certain it will be a worthwhile investment and not just the Band-Aid approaches that have failed Vallco for decades. Until Cupertino is ready for that approach, we have no choice but to stop".[3] In a follow-up statement, Moulds said that current tenants' leases would be honored so long as they remained at the mall; AMC Theatres, Bowlmor Lanes, Ice Center Cupertino, and Benihana all indicated their intention to stay. However, all vacant areas of the mall would be closed for security reasons, and remaining tenants without lease terms were to be evicted.[32]
In May 2017, Sand Hill began implementing the closure of vacant areas, with seven new interior walls erected and a fenced-off section in front of the former Macy's.[33] On March 7, 2018, Sand Hill and AMC Theatres announced that the movie theater would close on March 22, 2018 – making the 16-screen megaplex's lifespan less than 11 years.[34]
In March 2018, Sand Hill proposed a revised mixed-use development plan with an increase from 800 to 2,402 residential units, and still including a rooftop park. The company submitted an application under SB 35, a 2017 California law that seeks to mitigate the state's housing crisis by eliminating the requirement for local approval of certain kinds of developments that include housing.[35] This proposal has been approved by the city. [8]: 1 Advisory plans being developed by members of the community through a charrette would include 2,400 residential units and more retail space than Sand Hill's plan.[36]
On December 1, 2018, Dynasty Seafood Restaurant closed.[37] Bay Club closed its doors in July 2019, leaving the entirety of the mall west of Wolfe Road (as well as the bridge over the road) vacant; all the remaining tenants occupy the smaller eastern portion of the mall.
Demolition
editOn October 11, 2018, Sand Hill initiated demolition of one parking garage of the mall, followed by demolition of the mall itself in six to nine months' time.[38] In August 2019 (ten months after the start of demolition), Sand Hill demolished the other parking garage under the scope of the original permit (adjacent to the site of the first parking garage), and after receiving a new permit, began demolition of the majority of the mall west of Wolfe Road on August 12. On March 27, 2020, Sand Hill announced that demolition of the bridge over Wolfe Road would commence on March 30. Wolfe Road under the bridge was closed, with traffic detoured onto the mall's Perimeter Road. Due to reduced traffic caused by the COVID-19 pandemic, the demolition had minimal impact on local businesses.[39] The demolition of the bridge was completed on April 8.
Permitting progress
editOn September 16, 2021, AB1174 was signed into law, which gives projects (like Vallco) using the special approval of SB35 more time to start construction to compensate for delays caused by lawsuits.[40][41]
A new version of the project to redevelop the property was submitted in 2023 and finally approved in early 2024. It intends to have more housing, along with some office and retail, and could start construction later in 2024.
References
edit- ^ "Vallco Town Center SB 35 Project". City of Cupertino. Retrieved 2 October 2020.
- ^ "Old Vallco Mall in Cupertino Demolished to Build Housing". 2018-10-11.
- ^ a b c "Cupertino voters reject dueling Vallco initiatives, final closure of mall planned". Silicon Valley Business Journal. November 9, 2016.
- ^ a b c d Wilson, Matt (August 26, 2015). "Cupertino: Largest green roof in the world proposed for new Vallco Mall project in Cupertino". San Jose Mercury News.
- ^ "Cupertino building initiatives spark zoning feuds". First Tuesday Journal. May 31, 2016.
- ^ "Vallco Town Center SB 35 Project". City of Cupertino. Retrieved 2 October 2020.
- ^ Lee, Wendy (March 27, 2018). "A mile from Apple HQ, housing proposal for dying Cupertino mall sparks fight". San Francisco Chronicle. Archived from the original on 2018-03-30. Retrieved 2019-04-11.
- ^ a b Li, Roland (November 25, 2018). "A dying mall near Apple's headquarters is turning into a fight over Silicon Valley's soul". San Francisco Chronicle. Archived from the original on 2018-11-27. Retrieved 2019-04-11.
- ^ Kendall, Marisa (March 27, 2018). "Developer tries to fast-track housing at Vallco Mall under new state law - Plan includes 2,402 housing units". San Jose Mercury News. Archived from the original on 2018-04-05. Retrieved 2019-04-11.
- ^ Vo, Thy (May 9, 2019). "Cupertino dumps alternative plan for Vallco mall's redevelopment - The city council's action doesn't stop the project from moving forward under SB 35". San Jose Mercury News. Archived from the original on 2019-05-09. Retrieved 2019-05-09.
- ^ "I. Magnin - Vallco", Flickr
- ^ Myllenbeck, Kristi (January 12, 2017). "Cupertino: Vallco farmers' market to relocate to Creekside Park". San Jose Mercury News. Retrieved May 19, 2017.
- ^ Fuller, David W. "Vallco Park: From Orchards to Industry". In Sharman Schultz, Linda (ed.). Cupertino Chronicle (2002 Edition) (2002 ed.). Cupertino Historical Society. pp. 155–165.
- ^ "Cupertino.org: History", Cupertino.org
- ^ "Paving the Way: Vallco Plans $20 Million Expansion", San Jose Mercury News, 1987-07-02
- ^ "Vallco Strikes Back: Cupertino Mall Opens Big Addition", San Jose Mercury News, 1988-08-26
- ^ "For the Vid in All of Us: Video Games, Bumper Cars, Pinball — The Tilt Arcade is Something Like a Kid's Idea of Heaven", San Jose Mercury News, 1990-08-14
- ^ Kraatz, Cody (2007-02-14), "Vallco gets new name to go with its new look, shop", Cupertino Courier
- ^ Lu, Crystal (2007-10-03), "Cupertino Square and 3 parcels are bought by local investors", Cupertino Courier
- ^ Jones Lang LaSalle press release, Jones Lang LaSalle Named Leasing and Managing Agent for Cupertino Square, (2007-10-09)
- ^ Rubenstein, Steve; Estrella, Cicero A. (February 27, 2006). "Storm leaves 80,000 blacked out in Bay Area".
- ^ Simonson, Sharon (2008-09-04). "Cupertino Square owners file for bankruptcy". San Jose Business Journal. San Jose News. Retrieved 2008-09-21.
- ^ Conrad, Katherine (2009-10-16). "Cupertino Square deal brings new owners, returns to old name". San Jose Business Journal. Retrieved 2009-10-19.
- ^ "Developer buys anchor stores at Cupertino's Vallco mall; J.C. Penney and Sears to close", Silicon Valley Business Journal, 2014-10-28
- ^ "EXCLUSIVE: Sand Hill Property Completes Purchase of Entire Vallco Mall for Total of $320MM", The Registry, 2014-11-12
- ^ "Vallco finally under single ownership — Pau's Sand Hill lands last piece of mall puzzle", Silicon Valley Business Journal, 2014-11-12
- ^ Strauss, Gary (2015-01-08). "J.C. Penney, Macy's to shut stores, lay off scores". USA Today.
- ^ Macy's, Inc. (2015-01-08). "Press release: Macy's, Inc. Evolves with Changing Customer Landscape, Invests for Continued Sales Growth".
- ^ "Cupertino Election Results". Cupertino.org. Retrieved 10 November 2016.
- ^ "Vallco project officially on the November Election Ballot". San Jose Mercury News. July 15, 2016.
- ^ "Cupertino Measures C and D". Cupertino City Clerk. Retrieved November 10, 2016.
- ^ Myllenbeck, Kristi (December 24, 2016). "Cupertino: Vallco theater, ice rink, bowling alley to remain open". San Jose Mercury News. Retrieved January 9, 2016.
- ^ "Vallco's last holdouts stuck in limbo as walls begin to rise inside Cupertino's dying mall". Silicon Valley Business Journal. May 18, 2017. Retrieved May 19, 2017.
- ^ Weber, Brendan (March 7, 2018). "AMC Cupertino Square 16 Movie Theater Slated to Close". NBC Bay Area. Retrieved March 28, 2018.
- ^ Marisa Kendall (March 30, 2018). "Developer tries to fast-track housing". Sunnyvale Sun. Bay Area News Group. pp. 1, 5.
- ^ Khalida Sarwari (April 27, 2018). "Community draws up alternative plans for Vallco mall". Sunnyvale Sun. Bay Area News Group. p. 10.
- ^ "Dynasty Chinese Seafood Restaurant". November 29, 2018. Retrieved December 9, 2018.
- ^ "Future of Vallco Mall site in Cupertino causes concern for some residents". October 11, 2018. Retrieved October 11, 2018.
- ^ "Construction at Vallco". Revitallize Vallco. March 27, 2020. Retrieved March 28, 2020.
- ^ Kendall, Marisa (2021-09-16). "Gov. Newsom abolishes most single-family zoning in California". San Jose Mercury News.
Finally, Newsom green-lighted AB 1174 — a bill that specifically targets the Vallco housing, office and retail project underway in Cupertino. The city was forced to grant Vallco special approval under a new law that fast-tracks certain residential developments. That approval is good for three years, and Cupertino officials recently said Vallco's is set to expire this month. AB 1174 clarifies that projects delayed by litigation — as Vallco was — get more time. "Closing this loophole will protect thousands of new housing units statewide against the whims of local opposition," Jim Wunderman, president and CEO of the Bay Area Council, wrote in a news release. "Too often, the legal system is abused to block housing that we so desperately need. AB 1174 fulfills the intent of past housing reform legislation to speed more housing construction in California."
- ^ "Gov. Newsom Signs Council-Sponsored Bill to Close Major Housing Reform Loophole". Bay Area Council. 2021-09-16.
AB 1174 fixes a loophole in SB 35 (Weiner), which was passed in 2017 and allows for fast-track approval of housing developments that meet various state and local requirements. SB 35 included a provision that unless construction begins within three years the project must return to square one for approval. But the three-year time limit in SB 35 didn't account for delays caused by frivolous lawsuits filed against projects by housing opponents, among other. Allowing such delays and the huge costs that come with them can often be a death knell for new housing projects. ... AB 1174 will have an immediate impact in Cupertino, where a project to transform the old Vallco Mall into a massive residential and commercial development won approval under SB 35 but was challenged in a lawsuit that would have prevented it from meeting the three-year deadline set to expire on Sept. 21.