Chūō Shinkansen
Route map of Chūō Shinkansen, the red part is the Miyazaki test track which is 18.4KM length and was opened in 1997
Overview
StatusPermitted by government
OwnerJR Central
Termini
  • Tokyo
  • Nagoya
Stations6
Service
TypeMaglev
Operator(s)JR Central
Rolling stockL0 Series Shinkansen
Technical
Line length286KM(Tokyo-Nagoya)
Operating speed505KM/H