The picture of the track under construction in Jamuna Bridge#History of construction seems to show 4 rows (2 pairs) of bolts on either side of the track which implies 4-rail.
The picture of the track under construction in Jamuna Bridge#History of construction seems to show 4 rows (2 pairs) of bolts on either side of the track which implies 4-rail.