Test case 1 edit

All parameters

Infobox tunnel
[[File:{{{image}}}|{{{image_size}}}|alt={{{alt}}}]]
{{{caption}}}
Overview
Official name{{{official_name}}}
Other name(s){{{other_name}}}
Line{{{line}}}
Location{{{location}}}
Coordinates{{{coordinates}}}
OS grid reference
Status{{{status}}}
System{{{system}}}
Waterway{{{waterway}}}
Route{{{route}}}
Start{{{start}}}
End{{{end}}}
No. of stations{{{stations}}}
Operation
Work begun{{{startwork}}}
Constructed{{{construction}}}
Closed{{{closed}}}
Rebuilt{{{rebuilt}}}
Owner{{{owner}}}
Operator{{{operator}}}
Traffic{{{traffic}}}
Character{{{character}}}
Toll{{{toll}}}
Vehicles per day{{{vpd}}}
Technical
Design engineer{{{engineer}}}
Length{{{length}}}
Line length{{{linelength}}}
Track length{{{tracklength}}}
No. of tracks{{{notrack}}}
No. of lanes{{{lanes}}}
Track gauge{{{gauge}}}
Electrified{{{el}}}
Operating speed{{{speed}}}
Highest elevation{{{hielevation}}}
Lowest elevation{{{lowelevation}}}
Tunnel clearance{{{height}}}
Width{{{width}}}
Water Depth{{{depth}}}
Towpath{{{towpath}}}
Boat-passable{{{passable}}}
Grade{{{grade}}}
Route map
{{{map}}}
{{{extra}}}
Infobox tunnel/sandbox
[[File:{{{image}}}|{{{image_size}}}|alt={{{alt}}}]]
{{{caption}}}
Overview
Official name{{{official_name}}}
Other name(s){{{other_name}}}
Line{{{line}}}
Location{{{location}}}
Coordinates{{{coordinates}}}
OS grid reference
Status{{{status}}}
System{{{system}}}
Waterway{{{waterway}}}
Route{{{route}}}
Start{{{start}}}
End{{{end}}}
No. of stations{{{stations}}}
Operation
Work begun{{{startwork}}}
Opened{{{open}}}
Closed{{{closed}}}
Rebuilt{{{rebuilt}}}
Reopened{{{reopen}}}
Owner{{{owner}}}
Operator{{{operator}}}
Traffic{{{traffic}}}
Character{{{character}}}
Toll{{{toll}}}
Vehicles per day{{{vpd}}}
Technical
Design engineer{{{engineer}}}
Construction{{{construction}}}
Length{{{length}}}
Line length{{{linelength}}}
Track length{{{tracklength}}}
No. of tracks{{{notrack}}}
Number of lanes{{{lanes}}}
Track gauge{{{gauge}}}
Electrified{{{el}}}
Operating speed{{{speed}}}
Highest elevation{{{hielevation}}}
Lowest elevation{{{lowelevation}}}
Tunnel clearance{{{height}}}
Width{{{width}}}
Water Depth{{{depth}}}
Towpath{{{towpath}}}
Boat-passable{{{passable}}}
Grade{{{grade}}}
Route map
{{{map}}}
{{{extra}}}

Test case 2 edit

Channel Tunnel (see Category:Railway tunnels)

Infobox tunnel
Map showing path of the Channel Tunnel
Map of the Channel Tunnel
Overview
Other name(s)Chunnel
LocationEnglish Channel (Strait of Dover)
CoordinatesFolkestone: 51°5′49.5″N 1°9′21″E / 51.097083°N 1.15583°E / 51.097083; 1.15583 (Folkestone Portal)
Coquelles: 50°55′22″N 1°46′50.16″E / 50.92278°N 1.7806000°E / 50.92278; 1.7806000 (Coquelles Portal)
StatusActive
StartFolkestone, Kent, United Kingdom
EndCoquelles, Pas-de-Calais, France
Operation
OwnerGetlink
OperatorGetlink
Eurostar
DB Cargo UK
CharacterThrough-rail passenger and freight. Vehicle shuttle.
Technical
Line length50.45 km (31.35 mi)
No. of tracks2 single track tunnels
1 service tunnel
Track gauge1,435 mm (4 ft 8+12 in) (standard gauge)
Electrified25 kV AC OHLE, 5.87 m
Operating speed160 kilometres per hour (99 mph)
Infobox tunnel/sandbox
Map showing path of the Channel Tunnel
Map of the Channel Tunnel
Overview
Other name(s)Chunnel
LocationEnglish Channel (Strait of Dover)
CoordinatesFolkestone: 51°5′49.5″N 1°9′21″E / 51.097083°N 1.15583°E / 51.097083; 1.15583 (Folkestone Portal)
Coquelles: 50°55′22″N 1°46′50.16″E / 50.92278°N 1.7806000°E / 50.92278; 1.7806000 (Coquelles Portal)
StatusActive
StartFolkestone, Kent, United Kingdom
EndCoquelles, Pas-de-Calais, France
Operation
Opened6 May 1994 (1994-05-06) (tunnel)
14 November 1994 (passenger service)
OwnerGetlink
OperatorGetlink
Eurostar
DB Cargo UK
CharacterThrough-rail passenger and freight. Vehicle shuttle.
Technical
Line length50.45 km (31.35 mi)
No. of tracks2 single track tunnels
1 service tunnel
Track gauge1,435 mm (4 ft 8+12 in) (standard gauge)
Electrified25 kV AC OHLE, 5.87 m
Operating speed160 kilometres per hour (99 mph)

Test case 3 edit

Holland Tunnel (see Category:Road tunnels)

Infobox tunnel
Photo of Holland Tunnel, Manhattan entrance
Manhattan entrance to tunnel, 1985
Overview
Official nameClifford Milburn Holland Tunnel
LocationConnecting Jersey City, New Jersey to Lower Manhattan in New York City, USA
Route I-78 and Route 139 (which ends at NJ/NY State Line)
CrossesHudson River
Operation
OperatorPort Authority of New York and New Jersey
Traffic93,356 (2010)
Toll(eastbound only) As of 2 December 2012; Cars $13 for cash, $10.25 for Peak (E-ZPass), $8.25 for off-peak (E-ZPass)
Technical
Length8,558 feet (2,608.5 m) (westbound)
8,371 feet (2,551.5 m) (eastbound)
No. of lanes4
Tunnel clearance12.5 feet (3.8 m)
Route map
Route map of the Lincoln Tunnel
Route map of the Lincoln Tunnel
Holland Tunnel
Interior view of Holland Tunnel, 2006
LocationJersey City, NJ and New York, NY
Built1920
ArchitectClifford Holland
NRHP reference No.93001619
Significant dates
Added to NRHPNovember 4, 1993
Designated NHLNovember 4, 1993
Infobox tunnel/sandbox
Photo of Holland Tunnel, Manhattan entrance
Manhattan entrance to tunnel, 1985
Overview
Official nameClifford Milburn Holland Tunnel
LocationConnecting Jersey City, New Jersey to Lower Manhattan in New York City, USA
Route I-78 and Route 139 (which ends at NJ/NY State Line)
Operation
OpenedNovember 13, 1927 (1927-11-13)
OperatorPort Authority of New York and New Jersey
Traffic93,356 (2010)
Toll(eastbound only) As of 2 December 2012; Cars $13 for cash, $10.25 for Peak (E-ZPass), $8.25 for off-peak (E-ZPass)
Technical
Length8,558 feet (2,608.5 m) (westbound)
8,371 feet (2,551.5 m) (eastbound)
Number of lanes4
Tunnel clearance12.5 feet (3.8 m)
Route map
Route map of the Lincoln Tunnel
Route map of the Lincoln Tunnel
Holland Tunnel
Interior view of Holland Tunnel, 2006
LocationJersey City, NJ and New York, NY
Built1920
ArchitectClifford Holland
NRHP reference No.93001619
Significant dates
Added to NRHPNovember 4, 1993
Designated NHLNovember 4, 1993

Test case 4 edit

Alva B. Adams Tunnel (see Category:Water tunnels)

Infobox tunnel
Photo of Grand Lake (west) end of Alva B. Adams Tunnel
Grand Lake west end Alva B. Adams Tunnel
Overview
LocationUnder Rocky Mountain National Park Colorado
CoordinatesGrand Lake: 40°14′50″N 105°48′36″W / 40.247302°N 105.810013°W / 40.247302; -105.810013 (Alva B. Adams Portal)
Mary's Lake exit: 40°20′47″N 105°32′07″W / 40.346381°N 105.535269°W / 40.346381; -105.535269 (Mary's Lake exit)
StatusActive
SystemColorado- Big Thompson Project
StartGrand Lake (Colorado)
EndMary's Lake Colorado
Operation
OwnerNorthern Colorado Water Conservancy District (NCWCD)
Characterwater tunnel
Technical
Length13.1 miles (21.1 km) long
Tunnel clearance9.75 feet (2.97 m) diameter
Infobox tunnel/sandbox
Photo of Grand Lake (west) end of Alva B. Adams Tunnel
Grand Lake west end Alva B. Adams Tunnel
Overview
LocationUnder Rocky Mountain National Park Colorado
CoordinatesGrand Lake: 40°14′50″N 105°48′36″W / 40.247302°N 105.810013°W / 40.247302; -105.810013 (Alva B. Adams Portal)
Mary's Lake exit: 40°20′47″N 105°32′07″W / 40.346381°N 105.535269°W / 40.346381; -105.535269 (Mary's Lake exit)
StatusActive
SystemColorado- Big Thompson Project
StartGrand Lake (Colorado)
EndMary's Lake Colorado
Operation
Opened1947 (1947)
OwnerNorthern Colorado Water Conservancy District (NCWCD)
Characterwater tunnel
Technical
Length13.1 miles (21.1 km) long
Tunnel clearance9.75 feet (2.97 m) diameter