Talk:1999 Hungarian Grand Prix/to do

Latest comment: 16 years ago by Bobby Doorknobs

This article is a Formula One race report. For editing guidelines on style and structure, please take a look at the Example race report.
Please list your sources when you have completed a task.

Report

  • Start writing a report by adding race highlights or a summary.
  • Expand the report with sections for pre-race, practice, qualifying and post-race.
  • Write a good lead section.
  • Add photographs to the article.

Results

  • Add race results. Added. BillCook 06:05, 1 November 2004 (UTC)Reply
  • Verify the race results and add a reference. Verified using The Official Formula 1 Website. Bobby Doorknobs 18:19, 30 July 2007 (UTC)Reply
  • Double-check the race results against other sources to eliminate errors (1). Double-checked using Forix. Readro 21:10, 31 July 2007 (UTC)Reply
  • Double-check the race results against other sources to eliminate errors (2). Double-checked using Autosport. Readro 21:12, 31 July 2007 (UTC) → removed from references: no longer needed. Bobby Doorknobs 20:13, 3 August 2007 (UTC)Reply
  • Double-check the race results against other sources to eliminate errors (3). Double-checked using ChicaneF1.com. Bobby Doorknobs 00:42, 3 August 2007 (UTC)Reply
  • Add qualifying results. Added using (source). (signature)
  • Double-check the qualifying results against other sources to eliminate errors (1). Double-checked using (source). (signature)
  • Double-check the qualifying results against other sources to eliminate errors (2). Double-checked using (source). (signature)

Race details

  • Add a race info box. Added using Forix. Readro 21:23, 31 July 2007 (UTC)Reply
  • Double-check the race infobox against other sources to eliminate errors (1). Double-checked using ChicaneF1.com. Bobby Doorknobs 00:42, 3 August 2007 (UTC)Reply
  • Double-check the race infobox against other sources to eliminate errors (2). Double-checked using (source). (signature)

Please edit this to-do list to add new suggestions or strike out completed tasks. Last updated: August 2007