The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.[1]
Newlincs EfW facility | |
---|---|
Official name | NewLincs EfW facility |
Country | England |
Location | Lincolnshire, Yorkshire and the Humber |
Coordinates | 53°36′23″N 0°08′38″W / 53.6063°N 0.1439°W |
Commission date | 2004 |
Operator(s) | NewLincs Developments Ltd |
Thermal power station | |
Primary fuel | Waste |
External links | |
Commons | Related media on Commons |
grid reference TA229138 |
See also edit
References edit
- ^ "Your waste, our energy" (PDF). Archived from the original (PDF) on 28 September 2007., www.newlincs.com, Retrieved 22 February 2007
External links edit
Wikimedia Commons has media related to Newlincs EfW facility.