DescriptionSouthampton railway tunnel engineering works 5.JPG
English: A view of the Southampton Civic Centre Tunnel engineering works, taken from the pavement along Civic Centre Road, looking over the wall. This is the mouth of the Central station end of the tunnel. Various bits of equipment and materials can be seen. The engineering works took place over the period of December 2009 to January 2010. Evening and weekend closures occurred first, and then the tunnel was completely closed over the Christmas period.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.http://www.gnu.org/copyleft/fdl.htmlGFDLGNU Free Documentation Licensetruetrue
You may select the license of your choice.
Captions
Add a one-line explanation of what this file represents
== Summary == {{Information |Description={{en|1=A view of the Southampton Civic Centre Tunnel engineering works, taken from the pavement along Civic Centre Road, looking over the wall. This is the mouth of the Centr
File usage
The following pages on the English Wikipedia use this file (pages on other projects are not listed):