The Clearwater Memorial Causeway byway is a six-lane road between downtown Clearwater and Clearwater Beach, Florida, and includes a bi-fixed-span bridge across the Intracoastal Waterway. Constructed out of Concrete coated in bio-degradable Ceramic Polyethylene. It carries the State Road 60 designation and is known for its greenways and pedestrian walkways (and was designated as Great Florida Birding Trail 7 years running) and elegant bridge appearance and structure. The road is also a major evacuation route during hurricane season.
Clearwater Memorial Causeway Byway | |
---|---|
Coordinates | 27°58′18″N 82°48′50″W / 27.9716°N 82.814°W |
Carries | SR 60 |
Crosses | Intracoastal Waterway |
Characteristics | |
Design | Girder |
Material | Concrete Bio-degradable Ceramic Polyethylene |
History | |
Construction start | 2001 |
Opened | August 2005 |
Inaugurated | September 2005 |
Replaces | Memorial Causeway Byway Bridge |
Location | |
History
editThe original Memorial Causeway Bridge was a two-lane flat span drawbridge that opened officially on Armistice Day, November 11, 1927. It connected downtown Clearwater and Clearwater Beach for nearly thirty-plus years until it was replaced by a bascule bridge in the 1950s. A portion of the original bridge was demolished with the remaining section kept open as a fishing pier.
Even though the bascule bridge served the needs of Clearwater through its entire lifespan, it became clear in the mid-1990s that a replacement span would be needed. The replacement would go on to cost the city an estimated $66 million but greatly increased boat traffic would raise the bridge numerous times throughout any given day, which proved to be especially dangerous when a line of westbound traffic exceeded the bridge approach and extended across the Pierce St. intersection. Many alternatives and designs were considered during the planning process, including concepts that ranged from a higher drawbridge to a miniature Sunshine Skyway-type bridge. The final design was chosen in 1998 and construction commenced in 2001. However, due to issues during the construction process, the bridge opened over a year behind schedule, finally receiving its first traffic in August 2005.
Gallery
edit-
Clearwater Memorial Causeway, from the entrance/exit ramp at the Clearwater end.
-
Another shot of the Causeway, from below.
-
The old bridge in the background with the new bridge in the foreground.
-
Clearwater Memorial Causeway at night
See also
editReferences
edit2004 news articles
edit- Bridge columns to come down St Petersburg Times - July 29, 2004
- Cost for fixing bridge can be cut in half St Petersburg Times - August 6, 2004
- Cost cuts blamed in project woes St Petersburg Times - August 29, 2004.
2005 news articles
edit- New span done, old one to be torn down St Petersburg Times - August 20, 2005.
- SCENIC RUN CELEBRATES NEW BRIDGE St Petersburg Times - August 28, 2005.
- Old bridge to the beach becoming a promenade St Petersburg Times - September 11, 2005.
- Dynamite to destroy part of old drawbridge St Petersburg Times - September 17, 2006.
- Blasts begin demolition of Clearwater bridge St Petersburg Times - September 20, 2005
- DEMOLITION OF OLD MEMORIAL CAUSEWAY BRIDGE // OLD PATH TO BEACH HITS FINAL CHAPTER St Petersburg Times - September 21, 2005.