S7_BWH26-5-03A.JPG (640 × 480 pixels, file size: 70 KB, MIME type: image/jpeg)
Summary edit
This is a northerly view of Rhyd Ddu station in the final stages of construction on 26/5/03. Diesel loco Conway Castle hauls a PW train with a tamping machine in the background. In April 2006, the platform was doubled in length to the south and given two faces in preparation for the planned 2009 opening of the through route to Porthmadog. B.W.Hughes
Licensing edit
This work has been released into the public domain by the copyright holder. This applies worldwide. In case this is not legally possible: |
This file is a candidate to be copied to Wikimedia Commons.
Any user may perform this transfer; refer to Wikipedia:Moving files to Commons for details. If this file has problems with attribution, copyright, or is otherwise ineligible for Commons, then remove this tag and DO NOT transfer it; repeat violators may be blocked from editing. Other Instructions
| |||
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 09:40, 13 April 2006 | 640 × 480 (70 KB) | Barrie Hughes (talk | contribs) | Rhyd Ddu station in the final stages of construction on 26/5/03. Diesel loco Conway Castle hauls a PW train. B.W.Hughes |
You cannot overwrite this file.