File:NASA Completes & Moves Upper Part of Artemis II Core Stage (MAF 20211229 CS2 FwdJoinMove03).jpg
Size of this preview: 800 × 534 pixels. Other resolutions: 320 × 213 pixels | 640 × 427 pixels | 1,024 × 683 pixels | 1,280 × 854 pixels | 2,560 × 1,707 pixels | 4,336 × 2,892 pixels.
Original file (4,336 × 2,892 pixels, file size: 7.25 MB, MIME type: image/jpeg)
This is a file from the Wikimedia Commons. Information from its description page there is shown below. Commons is a freely licensed media file repository. You can help. |
Summary
DescriptionNASA Completes & Moves Upper Part of Artemis II Core Stage (MAF 20211229 CS2 FwdJoinMove03).jpg |
English: NASA has completed assembly of the upper, or forward, part of the core stage for the Space Launch System (SLS) rocket that will send the Artemis II crew on their lunar mission. Boeing, the lead core stage contractor, completed joining the forward part of the rocket, and then lifted it out of the assembly structure at NASA’s Michoud Assembly Facility in New Orleans. To construct this part of the core stage, the team first stacked three major parts of the stage—the forward skirt, the liquid oxygen tank, and the intertank. The forward skirt sits atop the rocket’s core stage, and it and the intertank are outfitted with the rocket’s flight computers and avionics systems that control SLS during launch and ascent. The liquid oxygen tank holds 196,000 gallons of liquid oxygen cooled to minus 297 degrees Fahrenheit. The entire upper part of the stage is around 66-feet tall. The fully-assembled, 212-foot-tall rocket stage consists of five hardware elements. As the team lifted it out of the assembly area, they completed a breakover maneuver, to put the forward assembly in a horizontal position. Then, they moved it to final assembly where the Artemis II liquid hydrogen tank is also undergoing outfitting. Here, teams will connect the liquid hydrogen tank to the upper part of the rocket and complete assembly of four of the five core stage parts. The last piece to be added will be the engine section, which is currently in a separate assembly area being outfitted with propulsion systems that connect to the engines. Image credit: NASA/Michael DeMocker |
||
Date | Taken on 29 December 2021 | ||
Source |
|
||
Author | NASA Michoud Assembly Facility / Michael DeMocker |
Licensing
Public domainPublic domainfalsefalse |
This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.) | ||
Warnings:
|
Items portrayed in this file
depicts
29 December 2021
0.002 second
35 millimetre
400
image/jpeg
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 15:01, 23 April 2023 | 4,336 × 2,892 (7.25 MB) | OptimusPrimeBot | #Spacemedia - Upload of http://images-assets.nasa.gov/image/MAF_20211229_CS2_FwdJoinMove03/MAF_20211229_CS2_FwdJoinMove03~orig.jpg via Commons:Spacemedia |
File usage
The following pages on the English Wikipedia use this file (pages on other projects are not listed):
Metadata
This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.
If the file has been modified from its original state, some details may not fully reflect the modified file.
Camera manufacturer | Canon |
---|---|
Camera model | Canon EOS R5 |
Author | Michael DeMocker |
Copyright holder |
|
Exposure time | 1/500 sec (0.002) |
F-number | f/5 |
ISO speed rating | 400 |
Date and time of data generation | 08:54, 29 December 2021 |
Lens focal length | 35 mm |
City shown | New Orleans |
Short title | NASA Completes & Moves Upper Part of Artemis II Core Stage |
Image title | NASA has completed assembly of the upper, or forward, part of the core stage for the Space Launch System (SLS) rocket that will send the Artemis II crew on their lunar mission. Boeing, the lead core stage contractor, completed joining the forward part of the rocket, and then lifted it out of the assembly structure at NASA’s Michoud Assembly Facility in New Orleans. To construct this part of the core stage, the team first stacked three major parts of the stage—the forward skirt, the liquid oxygen tank, and the intertank. The forward skirt sits atop the rocket’s core stage, and it and the intertank are outfitted with the rocket’s flight computers and avionics systems that control SLS during launch and ascent. The liquid oxygen tank holds 196,000 gallons of liquid oxygen cooled to minus 297 degrees Fahrenheit. The entire upper part of the stage is around 66-feet tall. The fully-assembled, 212-foot-tall rocket stage consists of five hardware elements. As the team lifted it out of the assembly area, they completed a breakover maneuver, to put the forward assembly in a horizontal position. Then, they moved it to final assembly where the Artemis II liquid hydrogen tank is also undergoing outfitting. Here, teams will connect the liquid hydrogen tank to the upper part of the rocket and complete assembly of four of the five core stage parts. The last piece to be added will be the engine section, which is currently in a separate assembly area being outfitted with propulsion systems that connect to the engines. Image credit: NASA/Michael DeMocker |
Width | 8,192 px |
Height | 5,464 px |
Bits per component |
|
Pixel composition | RGB |
Orientation | Normal |
Number of components | 3 |
Horizontal resolution | 300 dpi |
Vertical resolution | 300 dpi |
Software used | Adobe Photoshop 23.1 (Macintosh) |
File change date and time | 12:25, 5 January 2022 |
White point chromaticity |
|
Chromaticities of primarities |
|
Color space transformation matrix coefficients |
|
Y and C positioning | Co-sited |
Exposure Program | Aperture priority |
Exif version | 2.31 |
Date and time of digitizing | 08:54, 29 December 2021 |
Meaning of each component |
|
Shutter speed | 9 |
APEX aperture | 4.625 |
Exposure bias | 0.33333333333333 |
Maximum land aperture | 3 APEX (f/2.83) |
Metering mode | Pattern |
Flash | Flash did not fire |
DateTime subseconds | 76 |
DateTimeOriginal subseconds | 76 |
DateTimeDigitized subseconds | 76 |
Supported Flashpix version | 1 |
Color space | Uncalibrated |
Focal plane X resolution | 5,773.0796335447 |
Focal plane Y resolution | 5,769.7993664203 |
Focal plane resolution unit | inches |
Custom image processing | Normal process |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Scene capture type | Standard |
GPS tag version | 0.0.3.2 |
IIM version | 3 |
Province or state shown | LA |
Country shown | USA |
Keywords |
|
Sublocation of city shown | NASA Michoud Assembly Facility |
Serial number of camera | 052021003327 |
Lens used | RF15-35mm F2.8 L IS USM |
Date metadata was last modified | 06:25, 5 January 2022 |
Rating (out of 5) | 0 |
Unique ID of original document | D9E84FA202CDFD6DDE3D19B24F9328FF |
Copyright status | Copyrighted |