About Me
This user believes that articles are useless without images .
Hi. Im new in case you couldn't tell. Lets see what useless info I can add.
To Do List
edit
My Gallery
edit
Cooridnate test Folkestone: 51°5′49.5″N 1°9′21″E / 51.097083°N 1.15583°E / 51.097083; 1.15583 (Folkestone Portal ) Coquelles: 50°55′22″N 1°46′50.16″E / 50.92278°N 1.7806000°E / 50.92278; 1.7806000 (Coquelles Portal )
33°26'52.50"N 112° 4'23.00"W Office
33°26'50.50"N 112° 4'23.00"W Hotel
33°26'52.00"N 112° 4'28.00"W Retail
33°26'51.50"N 112° 4'25.75"W Overall
Grand opening Nov 4, 2010
1.8 million sf total
$900 million
const 2007-2010
Kimpton Hotels & Restaurant Group
tower topped out July 16 2009
hotel ref[1]
const begins ref[2]
grand opening ref[3]
CityScape Office Tower - Phase Ia The office tower at Cityscape in Downtown Phoenix
Type Office Building Address 1 East Washington StreetPhoenix, Arizona 85004 Construction started October 2008 Completed April 2010 Owner Red Development Structural system Reinforced cast-in-place concrete columns and floor with a glass facade Floor count 27 Floor area 620,000 Lifts/elevators 16 Architecture firm Callison Main contractor Hunt Construction
CityScape Retail Shops - Phase Ib Type Retail Shopping Center Address 50 West Jefferson Street and 11 West Washington StreetPhoenix, Arizona 85004 Owner Red Development Structural system Steel Floor count 2 Floor area 200,000 Main contractor Hunt Construction
Hotel Palomar - Phase II Type Boutique Hotel Address 2 East Jefferson StreetPhoenix, Arizona 85004 Cost $34.3 million Owner Red Development Structural system Reinforced cast-in-place concrete columns and floor with a glass facade Floor count 34 Main contractor Hunt Construction
Temp References
edit