Zofingen–Wettingen railway line

The Zofingen–Wettingen railway line is a standard-gauge line in Switzerland. It was opened on 6 September 1877 between Zofingen and Baden Oberstadt together with the Aarau–Suhr railway by the Swiss National Railway (Schweizerische Nationalbahn; SNB). The opening of the adjacent Baden Oberstadt–Wettingen section together with the Wettingen–Effretikon railway, which represented its continuation to the east, was delayed until 15 October 1877 due to construction delays at the Limmat bridge. The SNB went bankrupt in 1878, after which the line was acquired by the Swiss Northeastern Railway (Schweizerische Nordostbahn; NOB) from the bankrupt estate. The NOB became part of the Swiss Federal Railways with the nationalisation of the company in 1902.

Zofingen–Wettingen railway line
Overview
OwnerSwiss Federal Railways
Line number
  • 514 Zofingen–Lenzburg
  • 650.1 Lenzburg–Mägenwil
Termini
Technical
Line length41.5 km (25.8 mi)
Number of tracks2: Lenzburg–Gruemet junction
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC overhead catenary
Route map

km
0.0
Zofingen
2.3
Küngoldingen
4.9
Walterswil-Striegel
6.6
Safenwil
Kölliken hazardous
waste landfill
9.3
Kölliken Oberdorf
10.9
Kölliken
13.9
Oberentfelden
16.7
67.5
Suhr
Migros distribution centre
63.3
Hunzenschwil
59.8
Lenzburg
57.9
Gexi junction
55.6
Othmarsingen
53.8
Mägenwil
Brugg-Mellingen road (66 m)
Mellingen bridge (193 m)
over the Reuss
50.7
Gruemet junction
to Killwangen-Spreitenbach
Baden-Mellingen bridge (74 m)
50.1
Mellingen
47.4
Dättwil
44.2
Baden Oberstadt
42.7
Wettingen
Source: Swiss railway atlas[1]

History edit

The line was built by the SNB with one track and was intended to compete with the Baden–Aarau railway of the NOB. The SNB wanted the line from Lake Constance (Bodensee) to western Switzerland to be as short as possible and it therefore passed economically significant places, but it was planned to connect Zothingen to Solothurn, which was already connected to Olten by the Gäu Railway (Gäubahn) of the network of the Swiss Central Railway (Schweizerische Centralbahn; SCB).

The lack of traffic due to competition from existing rail companies and the economic crisis triggered by the Panic of 1873 (or Gründerkrach, German for "foundation crash", referring to the foundation of the German Empire in 1871) caused the SNB to declare bankruptcy after only four months of continuous operation, after which the NOB acquired its network from the bankrupt estate on 1 October 1880. The Zofingen–Suhr section was sold to the SCB.

As part of the electrification of the former Aargau Southern Railway, the Lenzburg–Gexi section was wired on 5 May 1927, followed by the Gexi–Othmarsingen section on 28 May 1932 and the Zofingen–Suhr–(Aarau) section on 6 July 1946. Special barriers had to be installed at the two intersections with the Wynental and Suhrental Railway (WSB), since that railway was electrified at 750 volts DC. The Suhr–Lenzburg and Othmarsingen–Wettingen sections were electrified on 17 December 1946, completing the electrification of the whole Zofingen–Wettingen line.

Route edit

The line runs from Zofingen via Striegel to Suhr and thus bypasses the area around Olten in the canton of Solothurn. The Solothurn village of Walterswil is served by the station of Walterswil-Striegel which lies just into the canton of Aargau. A line to Aarau branched off in Suhr, which was closed in 2004, so that its route could be used for a relocated metre-gauge line of the WSB. From Suhr, the line continues to Lenzburg and then, along with the Rupperswil–Immensee railway line, runs on an embankment over the Aabach and the former route of the Seetal Railway (Seetalbahn) to Wildegg, continuing via Othmarsingen, Mellingen and Baden Oberstadt to Wettingen.

The Reuss Bridge, which was built by the SNB near Mellingen was the first large-scale construction by Bell Maschinenfabrik. The original, single-track steel truss bridge was replaced by a composite bridge in 1973 because the line from Lenzburg to the new junction at Gruemet needed to be upgraded to a double-track main line as part of the project to build the Heitersberg Tunnel, which opened in 1975. The new line branches off towards the Heitersberg Tunnel from the line towards Wettingen in Gruemet, to the east of the Reuss bridge at Mellingen.

Operations edit

Passenger traffic from Lenzburg to Wettingen over the national railway line was discontinued in 2007. The Gruemet–Wettingen line is only used regularly by freight traffic to serve the Mellingen tank farm and the sidings in Baden Oberstadt. If the Heitersberg Tunnel is closed due to maintenance work or single-track operation is necessary, it is still used as a backup route (mostly running from west to east).

The Lenzburg–Zofingen section is served every half an hour until 8 pm, then every hour, by line S28 of the Aargau S-Bahn and is commonly referred to as the Nazeli (from Nationalbahn).[2][3]

The whole line has been approved for D4 freight traffic (22.5 t axle load, 8.0 t/m linear load) since 5 July 2009.[4]

References edit

Footnotes edit

  1. ^ Eisenbahnatlas Schweiz [Swiss railway atlas]. Schweers + Wall. 2012. pp. 10–11. ISBN 978-3-89494-130-7.
  2. ^ "514: Zofingen–Suhr–Lenzburg" (PDF) (in German). Official Swiss Railway Timetable. Retrieved 10 February 2019.
  3. ^ "In 30 Minuten "beim Kaffee in Bern"". Zofinger Tagblatt. 12 December 2004. Archived from the original on 16 January 2013. Retrieved 10 February 2019.
  4. ^ According to the map of FDV AB, section 5.1 chapter 4.2.4, as of 1 July 2017 ("Ausführungsbestimmungen zu den Fahrdienstvorschriften" (PDF) (in German). FDV AB Infrastruktur. 10 December 2017. pp. 54–109. Archived (PDF) from the original on 10 January 2019. Retrieved 10 February 2019.)

Sources edit

  • Wägli, Hans G. (1998). Schienennetz Schweiz (in German). Zürich: AS Verlag. ISBN 3-905111-21-7.