Tennessee State Route 153

State Route 153 (SR 153) is a state highway in Chattanooga, Tennessee. It runs from Interstate 75/U.S. Route 74 (I-75/US 74) a few miles east of the I-24 interchange, to US 27 just south of Soddy-Daisy. The route serves as a bypass around downtown Chattanooga for I-75 travelers heading towards US 27 north. It is also an important route for drivers from Soddy-Daisy, Hixson, and other parts of northwestern Hamilton County who are heading for I-75 and the eastern half of the county. It is also an important link to the Tennessee Valley Authority Chickamauga Dam, which the highway crosses on the Wilkes T. Thrasher Bridge. It also serves as the primary access to the Chattanooga Metropolitan Airport.

State Route 153 marker

State Route 153

Map
SR 153 highlighted in red
Route information
Maintained by TDOT
Length12.87 mi[1] (20.71 km)
Major junctions
South end I-75 / US 74 in Chattanooga
Major intersections
North end US 27 in Chattanooga
Location
CountryUnited States
StateTennessee
CountiesHamilton
Highway system
SR 152 SR 154

Route description edit

SR 153 begins in Chattanooga as a six-lane freeway at a stack interchange with I-75 in Chattanooga, just north of its interchange with I-24. SR 153 then goes west to have a diamond interchange with US 11/US 64/SR 2 (Lee Highway) before turning northwest. It then has a diamond interchange with Sheperd Road and then another with Shallowford Road a short distance later, both of which provide access to Chattanooga Metropolitan Airport. It continues northwest to a diamond interchange with Jersey Pike, then a partial cloverleaf interchange with SR 317 (Bonny Oaks Drive) a half mile later. It then has another partial cloverleaf with SR 17/SR 58. It then has a partial cloverleaf with SR 319 (Amnicola Highway), and the route narrows to four lanes. SR 153 then crosses the Tennessee River/Chickamauga Dam on the Wilkes T. Thrasher Bridge on top of the dam. SR 153 then widens to a six-lane divided highway, once again becomes an at-grade arterial route, and enters Hixson. It then has a partial diamond interchange with SR 319 (Dupont Parkway) again, this time becoming concurrent. They then pass and provide access to Northgate Mall, Chattanooga's second and oldest continuously operating mall. SR 319 (Hixson Pike) then separates once again at a partial cloverleaf interchange, and SR 153 continues northwest through a central retail district. SR 153 then turns north, leaves Hixson, and ends at US 27/SR 29 at a partial cloverleaf interchange, with the road continuing as Dayton Pike into Soddy Daisy.

History edit

Background and construction edit

The Chickamauga Dam was constructed by the Tennessee Valley Authority (TVA) from 1936 to 1940 in order to provide electricity, flood control, and improved navigation to the region. While the dam did not initially contain a bridge, it was designed to allow for one to be constructed. TVA would initially agree to construct a bridge only if it were tied into a more extensive system of highways. While the dam was under construction, the Tennessee Department of Highways (predecessor agency to TDOT) began studying the possibility of constructing a bridge across the dam to connect US 11 and US 27. [2] On January 18, 1940, Tennessee Congressman (and later Senator) Estes Kefauver proposed an amendment to a TVA appropriations bill that would have provided funding for a bridge across the dam, but the whole house rejected this.[3] From 1947 to 1949, Hamilton County Judge Wilkes T. Thrasher made several trips to Washington DC requesting federal funding and approval of the bridge. On July 31, 1947, Kefauver announced that the Public Roads Administration (predecessor to the Federal Highway Administration).[4] had approved the bridge. Construction on the bridge approaches began on November 21, 1949,[5] and work on the concrete bridge piers began one year later.[6] Completion of the bridge was initially slated for late 1951, but was repeatedly delayed by steel shortages. As a result, construction on the steel piers and beams began in August 1953.[7][8] Steel erection was completed on March 31, 1954, and the bridge was dedicated and opened to traffic on October 15, 1954, in a ceremony officially naming it for Thrasher.[9][10] The bridge was constructed with two traffic lanes and sidewalks, but was designed to be expanded to four lanes. It was officially christened the "Wilkes T. Thrasher Bridge" in a ceremony on July 1, 1955.[11]

While the bridge across the dam was under construction, the local and state governments began planning for a four-lane highway that would connect US 41 in East Ridge near the Georgia state line to US 27 in Red Bank, and serve as a bypass around downtown Chattanooga. In addition, this route was planned to serve the rapidly developing industrial areas along the Tennessee River, as well as the Volunteer Ordnance Works ammunition plant, the Chattanooga Metropolitan Airport (then Lovell Field), and the suburban neighborhoods along the route which had recently begun to develop. The route was also expected to relieve traffic on SR 317 (then SR 2A), which was expected to become congested once the bridge across the dam was completed.[12][13] On August 1, 1953, the Hamilton County government announced that they had chosen the route for the stretch between SR 317 and US 27 out of two proposed alignments.[14] This highway was officially incorporated into the state highway system as SR 153 in 1954.

Construction of the section between Hixson Pike and US 27 began on May 2, 1955,[15] and paving was completed on December 27, 1957. The section between SR 317 and south of the dam was let on November 16, 1956, and completed around July 1958. Due to higher-than-anticipated traffic volumes, a decision was made in September 1958 for the remainder of SR 153 to be controlled access.[16] The authorization of the Interstate Highway System in June 1956 resulted in the need to reevaluate the plans for SR 153 to extend to US 41,[17] and by January 1959, plans were changed for the route to begin at I-75 instead.[18] On August 31, 1962, a contract was awarded to construct the section between I-75 and SR 317;[19] this was completed around late 1964.

Later history edit

The intersection with Amnicola Highway was converted into a cloverleaf interchange in 1964-65. In March 1957, it was reported that a project to widen the Thrasher Bridge to four lanes had been included in the state's 5-year highway program and would take place in 1961.[17] This project did not occur until 1984. At the same time, the road was widened to four lanes between the dam and south of Hixson Pike. When the four-lane controlled-access alignment of US 27 that replaced the old Dayton Pike was constructed in the mid-to-late 1970s, the SR 153 designation was extended approximately 12 mile (0.80 km) north along this route to the new freeway. The stretch between north of Hixson Pike and near Grubb Road was widened to four lanes in the mid-to-late 1980s. In the mid-1990s, the sections between DuPont Parkway and Hixson Pike, and from Hixson Pike to north of Gadd, were widened to six lanes. The six-lane section was extended north to near Grubb Road in the mid-2000s.

Junction list edit

The entire route is in Chattanooga, Hamilton County.

mi[1]kmExitDestinationsNotes
0.00–
0.46
0.00–
0.74
0   I-75 / US 74 – Knoxville, Chattanooga, AtlantaI-75/US 74 exit 4; southern terminus; south end of freeway
0.981.581   US 11 / US 64 (Lee Highway/SR 2)
1.682.701AShepard Road    – Chattanooga Metropolitan Airport
2.504.022Shallowford Road
3.275.263Jersey PikeExit for the Tennessee Valley Railroad Museum on Cromwell Road
3.966.374  SR 317 (Bonny Oaks Drive)
4.647.475A 
 
SR 58 north – Harrison, Decatur
Also exit to Booker T. Washington and Harrison Bay State Parks
4.647.475B 
 
SR 17 south
5.578.966 
 
SR 319 north – Downtown Chattanooga
6.47–
7.11
10.41–
11.44
Wilkes T. Thrasher Bridge over the Tennessee River
7.2511.67Access Road; Lake Resort DriveInterchange
8.03–
8.12
12.92–
13.07
 
 
SR 319 south
Southern end of SR 319 concurrency; north end of freeway
8.9414.39 
 
SR 319 north (Hixson Pike) – Hixson, Middle Valley, Lakesite
Northern end of SR 319 concurrency; interchange
South Hixson PikeInterchange
12.3919.94Dayton Blvd – Red BankInterchange; no access for northbound SR 153
12.8720.71  
 
US 27 (SR 29) to SR 111 – Chattanooga, Dayton
Northern terminus; roadway continues north as Dayton Pike to Soddy-Daisy
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References edit

KML is not from Wikidata
  1. ^ a b Bureau of Transportation Statistics (June 13, 2022). "National Highway Planning Network" (Map). National Transportation Atlas Database. Washington, D.C.: United States Department of Transportation. Retrieved April 29, 2023.
  2. ^ "Dam Design To Allow Bridge Construction". The Chattanooga Times. May 29, 1937. p. 3. Retrieved November 17, 2023 – via Newspapers.com.
  3. ^ "TVA Funds Bill Survives Attacks, Passes House; Road Over Dam Vetoed". Chattanooga Daily Times. Associated Press. January 19, 1940. pp. 1, 2. Retrieved November 17, 2023 – via Newspapers.com.
  4. ^ "Newspapers.com by Ancestry Clippings Bridge Spanning Dam Given Approval In Washington; State Action Needed". Chattanooga Daily Times. August 1, 1947. pp. 1, 2. Retrieved November 18, 2023 – via Newspapers.com.
  5. ^ "Ramp Work Begins For Bridge At Dam". Chattanooga Daily Times. November 22, 1949. p. 3. Retrieved November 17, 2023 – via Newspapers.com.
  6. ^ "Piers For Bridge On Dam Started". Chattanooga Daily Times. November 17, 2023. p. 58. Retrieved November 17, 2023 – via Newspapers.com.
  7. ^ "More Steel Is Due For Bridge On Dam". Chattanooga Daily Times. August 10, 1953. p. 3. Retrieved November 17, 2023 – via Newspapers.com.
  8. ^ "Construction Work Started On Bridge Over Chickamauga Dam (Photo)". Chattanooga Daily Times. August 16, 1953. p. 17. Retrieved November 17, 2023 – via Newspapers.com.
  9. ^ Schneider, Fred (October 15, 1954). "Span At Dam Opens Today". Chattanooga Daily Times. pp. 1, 13. Retrieved November 17, 2023 – via Newspapers.com.
  10. ^ Schneider, Fred (October 16, 1954). "Ribbon Is Cut Opening Span For Vehicles". Chattanooga Daily Times. pp. 1, 11. Retrieved November 17, 2023 – via Newspapers.com.
  11. ^ "Tribute Paid To Thrasher". Chattanooga Daily Times. July 2, 1955. pp. 1, 3. Retrieved November 17, 2023 – via Newspapers.com.
  12. ^ Trewhitt, Henry (January 27, 1952). "Highway Bypass May Bring Battle". Chattanooga Daily Times. pp. 14, 20. Retrieved November 17, 2023 – via Newspapers.com.
  13. ^ Trewhitt, Henry (June 18, 1953). "Road Link To Dayton Pike, Bonny Oaks Drive Assured". Chattanooga Daily Times. pp. 1, 10. Retrieved November 17, 2023 – via Newspapers.com.
  14. ^ "Route Picked Out For Dam Highway". Chattanooga Daily Times. August 2, 1953. p. 3. Retrieved November 17, 2023 – via Newspapers.com.
  15. ^ Schneider, Fred (August 1, 1955). "Progress Noted On Dam Highway". Chattanooga Daily Times. p. 3. Retrieved November 17, 2023 – via Newspapers.com.
  16. ^ "Route 153 Is Set For Expressway". Chattanooga Daily Times. September 21, 1958. p. 3. Retrieved November 18, 2023 – via Newspapers.com.
  17. ^ a b Young, Harry (March 15, 1957). "State Plans To Add 2 Lanes To Bridge On Dam By '61". Chattanooga Daily Times. pp. 1, 11 . Retrieved November 17, 2023 – via Newspapers.com.
  18. ^ Young, Harry (January 16, 1959). "Plan Is Revised For Access Road". Chattanooga Daily Times. pp. 3, 11. Retrieved November 18, 2023 – via Newspapers.com.
  19. ^ "Bids Are Opened On Road Project". Chattanooga Daily Times. September 1, 1962. p. 3. Retrieved November 18, 2023 – via Newspapers.com.