Template:Infobox power transmission line/testcases


The test
{{Infobox power transmission line |AC_voltage= |DC_voltage=±500 kV |cable_installer= |cable_layer= |cable_manufacturer= |capacity=2,000&nbsp;MW |caption= |construction= |contractors= |coordinates= |country=[[Israel]]<br/>[[Cyprus]]<br/>[[Greece]] |current_type=[[HVDC]] |decom= |direction= |est= |expected=[[Cyprus]]-[[Israel]] 2019<br>[[Crete]]-[[Athica]] 2020<br>[[Cyprus]]-[[Crete]] 2022 |finish=[[Attica]],[[Greece]] |key_people=hhhhhh |lat= |length=1520 |length_mi= |long= |map= |name=EuroAsia Interconnector |operator= |owner=EuroAsia Interconnector Ltd. <br> (CEO: [[Nasos Ktorides]]) |par= |partners=ooo |photo= |poles_no=2 |province= |start=[[Hadera]],[[Israel]] |state= |substation_installer= |substation_manufacturer= |through=[[Kofinou]],[[Cyprus]]<br />[[Korakia]],[[Greece]] |type=[[Submarine power cable]] |website=http://www.euroasia-interconnector.com/}}

{{Infobox power transmission line}}

EuroAsia Interconnector
Location
CountryIsrael
Cyprus
Greece
FromHadera,Israel
Passes throughKofinou,Cyprus
Korakia,Greece
ToAttica,Greece
Ownership information
OwnerEuroAsia Interconnector Ltd.
(CEO: Nasos Ktorides)
Key peoplehhhhhh
Partnersooo
Construction information
ExpectedCyprus-Israel 2019
Crete-Athica 2020
Cyprus-Crete 2022
Technical information
TypeSubmarine power cable
Type of currentHVDC
Total length1,520 km (940 mi)
Power rating2,000 MW
DC voltage±500 kV
No. of poles2
Websitehttp://www.euroasia-interconnector.com/

{{Infobox power transmission line/sandbox}}

EuroAsia Interconnector
Location
CountryIsrael
Cyprus
Greece
FromHadera,Israel
Passes throughKofinou,Cyprus
Korakia,Greece
ToAttica,Greece
Ownership information
OwnerEuroAsia Interconnector Ltd.
(CEO: Nasos Ktorides)
Key Peoplehhhhhh
Partnersooo
Construction information
ExpectedCyprus-Israel 2019
Crete-Athica 2020
Cyprus-Crete 2022
Technical information
TypeSubmarine power cable
Type of currentHVDC
Total length1,520 km (940 mi)
Power rating2,000 MW
DC voltage±500 kV
No. of poles2