Main Road, Cox's Bazar

The Main Road is a 5 km (3.1 mi) regional highway located in the district of Cox's Bazar, Chittagong Division, Bangladesh.

R180 shield}}
R180
Main Road
Route information
Maintained by Bangladesh Road Transport Authority
Length5 km (3.1 mi)
Major junctions
East endCentral Bus Terminal, Cox's Bazar District
West endZero Point, Cox's Bazar
Location
CountryBangladesh
Major citiesCox's Bazar
Highway system
N110 Z1132

Background edit

The length of the main road is 5 km. It extends from the central bus terminal to Hashemiya Madrasa.[1] This road was previously under the Bangladesh Road Transport Authority. Later it was handed over to the Cox's Bazar Development Authority (CDA) which is now responsible for its maintenance.[2]

Expansion edit

In 2019, a project proposed by CDA to convert the road to four lanes was finalised by the Executive Committee of the National Economic Council. The budget for the widening of the road was fixed at around ৳294.15 crore.[3] On 18 October 2020, the renovation and widening of the highway began.[1] The deadline for the project was set at 2023, but the authorities wanted to complete it by 2022.[4]

Route edit

  1. Link Road
  2. BGB Camp
  3. 16 ECB Ground
  4. Rumalia
  5. Zero point

References edit

  1. ^ a b "কক্সবাজার শহরের প্রধান সড়কের উন্নয়ন কাজ শুরু". Dbcnews.tv (in Bengali). 18 October 2020. Retrieved 24 August 2023.
  2. ^ Barua, Sunil (9 January 2020). "কক্সবাজারে রাস্তাঘাটের বেহাল দশা, প্রভাব পড়ছে পর্যটনে". Banglanews24.com (in Bengali). Retrieved 24 August 2023.
  3. ^ Alamgir, Sayeed (21 July 2019). "চার লেনে উন্নীত হচ্ছে কক্সবাজারের প্রধান সড়ক". The Daily Ittefaq (in Bengali). Retrieved 24 August 2023.
  4. ^ Rahman, Sakibur (12 October 2021). "পাঁচ মিনিটের রাস্তা যেতে লাগে ৪০ মিনিট". Newsbangla24.com (in Bengali). Retrieved 24 August 2023.