List of MBTA Commuter Rail stations

MBTA Commuter Rail is the commuter rail system for the Greater Boston metropolitan area of Massachusetts. It is owned by the Massachusetts Bay Transportation Authority (MBTA) and operated under contract by Keolis. In 2022, it was the fifth-busiest commuter rail system in the United States with an average weekday ridership of 78,800.[1] The system's routes span 394 miles (630 km) and cover roughly the eastern third of Massachusetts plus central Rhode Island.[2][3] They stretch from Newburyport in the north to North Kingstown, Rhode Island, in the south, and reach as far west as Worcester and Fitchburg. The system is split into two parts, with lines north of Boston having a terminus at North Station and lines south of Boston having a terminus at South Station.

A geographic map of Massachusetts and Rhode Island, with purple lines showing the MBTA Commuter Rail system
A stylized map of the MBTA Commuter Rail system
Geographic and stylized maps of the MBTA Commuter Rail system

As of December 2023, there are 135 active stations on twelve lines, two of which have branches. 108 active stations are accessible; 26 are not. Six additional stations (Prides Crossing, Mishawum, Hastings, Silver Hill, Plimptonville, and Plymouth) are indefinitely closed due to service cuts during the COVID-19 pandemic. Two stations (Winchester Center and South Attleboro) are temporarily closed due to structural deterioration. Six additional stations are under construction as part of the South Coast Rail project; several other stations are planned.

The MBTA was formed in 1964 to subsidize suburban commuter rail service operated by the Boston and Maine Railroad, New York Central Railroad, and New York, New Haven and Hartford Railroad. Subsidies began in stages from 1965 to 1973; a number of stations closed in 1965–1967 before service to them was subsidized, of which 26 have not reopened. Contraction continued into the early 1980s; 42 additional stations closed between 1967 and 1981 have not reopened. Expansion of the system began in the late 1970s, including extensions of existing lines and the reopening of several lines discontinued before the MBTA era. Three additional low-ridership stations have closed since 1981, while several others have been relocated.

Key edit

Station Indicates the MBTA's official name for the station.
  Indicates whether the station is accessible. (See MBTA accessibility for further details.)
Line Indicates the lines that stop at the given station. A bold line designation indicates that the station is a terminus for that line.
Connections Denotes any links to MBTA subway and MBTA bus routes, to other bus systems, to Amtrak trains, or to the CapeFLYER at the station.
City/neighborhood Identifies the municipality (and for Boston, the neighborhood) in which the station is located.
Fare zone Identifies which of the eleven fare zones the station is in. The zones are 1A, 1, 2, 3, 4, 5, 6, 7, 8, 9, and 10, with Zone 1A being the closest to North Station and South Station, and Zone 10 being the farthest.
Daily boardings Average daily boardings (in both directions) from an April 2018 count.
Station info A link to the station's information page on the MBTA website.

Stations edit

Station   Line Connections City/neighborhood Fare zone[4] Daily boardings[5] Station info
South Station  
  MBTA bus (4, 7, 11)

  Amtrak: Acela, Lake Shore Limited, Northeast Regional
  Intercity buses at South Station Bus Terminal

Boston/Downtown 1A 28,416 Link
JFK/UMass  
  MBTA bus (8, 16, 41)
Boston/Dorchester 1A 362 Link
Quincy Center  
  MBTA bus (210, 211, 215, 216, 217, 220, 222, 225, 230, 236, 238, 245)
Quincy 1 773 Link
Weymouth Landing/East Braintree  
  MBTA bus (225, 226)
Weymouth 2 507 Link
East Weymouth   Weymouth 2 587 Link
West Hingham   Hingham 3 325 Link
Nantasket Junction   Hingham 4 218 Link
Cohasset   Cohasset 4 351 Link
North Scituate   Scituate 5 336 Link
Greenbush   Scituate 6 441 Link
Braintree  
  MBTA bus (226, 230, 236)
Braintree 2 204 Link
South Weymouth   Weymouth 3 581 Link
Abington   Abington 4 645 Link
Whitman   Whitman 5 362 Link
Hanson   Hanson 6 380 Link
Halifax   Halifax 7 276 Link
Kingston     GATRA (Freedom Link, Liberty Link, SAIL) Kingston 8 657 Link
Plymouth     GATRA (Freedom Link, Liberty Link) Plymouth 8 21 Link
Holbrook/​Randolph  
  MBTA bus (238, 240)
Randolph 3 473 Link
Montello  

  BAT (10/11)

Brockton 4 416 Link
Brockton  

  BAT (1, 2, 3, 4, 5, 6, 8, 9, 10/11, 12, 13, 14, BSU 28)

Brockton 4 546 Link
Campello     BAT (8, 12) Brockton 5 334 Link
Bridgewater   Bridgewater 6 600 Link
Middleborough/​Lakeville     GATRA (Downtown Middleborough Shuttle, Link 4) Lakeville 8 867 Link
Newmarket  
  MBTA bus (8, 10)
Boston/Dorchester 1A 75 Link
Uphams Corner  
  MBTA bus (15, 41)
Boston/Dorchester 1A 151 Link
Four Corners/Geneva  
  MBTA bus (19, 23)
Boston/Dorchester 1A 245 Link
Talbot Avenue  
  MBTA bus (22)
Boston/Dorchester 1A 213 Link
Morton Street  
  MBTA bus (21, 26)
Boston/Mattapan 1A 264 Link
Blue Hill Avenue  
  MBTA bus (28, 29, 30, 31)
Boston/Mattapan 1A Link
Fairmount  
  MBTA bus (24, 33)
Boston/Hyde Park 1A 543 Link
Readville  
  MBTA bus (32, 33)
Boston/Hyde Park 2 426 Link
Back Bay  
  MBTA bus (10, 39)

  Amtrak: Acela, Lake Shore Limited, Northeast Regional
  Intercity buses at Copley Square

Boston/Back Bay 1A 8,103 Link
Ruggles  
  MBTA bus (8, 15, 19, 22, 23, 28, 43, 44, 45, 47, CT2, CT3)
Boston/Roxbury Crossing 1A 2,640 Link
Forest Hills  
  MBTA bus (16, 21, 30, 31, 32, 34, 34E, 35, 36, 37, 38, 39, 40, 42, 50, 51)
Boston/Jamaica Plain 1A 142 Link
Hyde Park  
  MBTA bus (24, 32, 33, 50)
Boston/Hyde Park 1 526 Link
Route 128     Amtrak: Acela, Northeast Regional Westwood 2 1,721 Link
Canton Junction   Canton 3 1,115 Link
Canton Center   Canton 3 470 Link
Stoughton     BAT (14) Stoughton 4 917 Link
Sharon   Sharon 4 1,308 Link
Mansfield     Blue Apple Bus Mansfield 6 1,966 Link
Attleboro     GATRA (10, 12, 15, 16, 18) Attleboro 7 1,547 Link
South Attleboro     GATRA (11, 16)
  RIPTA (1, 35)
Attleboro 7 1,144 Link
Pawtucket/​Central Falls     RIPTA (R-Line, 1, 71, 72, 73, 75, 76, 78, 80, QX) Pawtucket, RI 8 Link
Providence     Amtrak: Acela, Northeast Regional

  RIPTA (R-Line, 3, 4, 50, 51, 54, 55, 56, 57, 58, 66, 72)

Providence, RI 8 2,091 Link
T. F. Green Airport     RIPTA (14) Warwick, RI 9 227 Link
Wickford Junction     RIPTA (14, 65x, 66) North Kingstown, RI 10 235 Link
Endicott Dedham 2 256 Link
Dedham Corporate Center   Dedham 2 763 Link
Islington Westwood 3 128 Link
Norwood Depot   Norwood 3 285 Link
Norwood Central   Norwood 3 1,041 Link
Windsor Gardens Norwood 4 257 Link
Plimptonville Walpole 4 12 Link
Walpole Walpole 4 744 Link
Foxboro   Foxborough 4 Link
Norfolk     GATRA (Medway T shuttle) Norfolk 5 875 Link
Franklin/Dean College Franklin 6 633 Link
Forge Park/495   Franklin 6 683 Link
Roslindale Village  
  MBTA bus (14, 30, 34, 34E, 35, 36, 37, 40, 50, 51)
Boston/Roslindale 1 479 Link
Bellevue  
  MBTA bus (35, 36, 37, 38)
Boston/West Roxbury 1 340 Link
Highland  
  MBTA bus (35, 36, 37)
Boston/West Roxbury 1 394 Link
West Roxbury  
  MBTA bus (35, 36, 37)
Boston/West Roxbury 1 444 Link
Hersey   Needham 2 525 Link
Needham Junction  
  MBTA bus (59)
Needham 2 366 Link
Needham Center  
  MBTA bus (59)
Needham 2 224 Link
Needham Heights  
  MBTA bus (59)
Needham 2 329 Link
Lansdowne  
  MBTA bus (8, 19, 60, 65)

At Kenmore:

  Green Line (B, C, D)
  MBTA bus (8, 19, 57, 60, 65)
Boston/Fenway-Kenmore 1A 1,195 Link
Boston Landing  
  MBTA bus (64)
Boston / Allston-Brighton 1A 600 Link
Newtonville
  MBTA bus (59, 553, 554, 556)
Newton 1 476 Link
West Newton
  MBTA bus (553, 554)
Newton 2 256 Link
Auburndale Newton 2 248 Link
Wellesley Farms Wellesley 3 298 Link
Wellesley Hills Wellesley 3 336 Link
Wellesley Square Wellesley 3 626 Link
Natick Center   MWRTA (10, 11, Natick Commuter Shuttle, MathWorks Express Shuttle) Natick 4 736 Link
West Natick     MWRTA (10, 11) Natick 4 944 Link
Framingham     Amtrak: Lake Shore Limited
  MWRTA (2, 3, 4, 5, 6, 7, 9)
  Greyhound
Framingham 5 1,130 Link
Ashland     MWRTA (5) Ashland 6 931 Link
Southborough     Marlborough Commuter Shuttle Southborough 6 525 Link
Westborough   Westborough 7 754 Link
Grafton     WRTA (B) Grafton 8 528 Link
Worcester     Amtrak: Lake Shore Limited

  WRTA (1, 2, 3, 4, 5, 6, 7, 11, 12, 14, 15, 16, 19, 23, 24, 26, 27, 29, 30, 31, 33, 42)
  PVTA (B79)
  Greyhound, Peter Pan

Worcester 8 1,298 Link
North Station     Amtrak: Downeaster
  MBTA bus (4)
  EZRide
Boston/Downtown 1A 18,427 Link
Porter  
  MBTA bus (77, 83, 96)
Cambridge 1A 1,468 Link
Belmont Center
  MBTA bus (74, 75)
Belmont 1 159 Link
Waverley
  MBTA bus (73, 554)
Belmont 1 115 Link
Waltham  
  MBTA bus (61, 70, 553, 554, 556, 558)
  128 Business Council: W1
Waltham 2 521 Link
Brandeis/Roberts   Waltham 2 369 Link
Kendal Green Weston 3 114 Link
Hastings Weston 3 18 Link
Silver Hill Weston 3 11 Link
Lincoln Lincoln 4 288 Link
Concord Concord 5 367 Link
West Concord   Concord 5 359 Link
South Acton     Maynard Commuter Shuttle, Cross Acton Transit Acton 6 991 Link
Littleton/Route 495     MART: Harvard Commuter Shuttle Littleton 7 490 Link
Ayer Ayer 8 276 Link
Shirley Shirley 8 155 Link
North Leominster     MART (Intercity/MWCC, 1, 3, 9) Leominster 8 239 Link
Fitchburg     MART (Clinton Worcester Commuter, Intercity/MWCC, Townsend Commuter Shuttle, Wachusett Commuter Shuttle, 1, 2, 3, 4, 5, 6, 7, 11) Fitchburg 8 287 Link
Wachusett     MART (Wachusett Commuter Shuttle, 11)
  Wachusett Mountain shuttle (winter)
Fitchburg 8 132 Link
West Medford
  MBTA bus (94, 95)
Medford 1A 628 Link
Wedgemere   Winchester 1 310 Link
Winchester Center Winchester 1 456 Link
Mishawum Woburn 2 32 Link
Anderson/​Woburn     Amtrak: Downeaster
  Logan Express
Woburn 2 1,296 Link
Wilmington     LRTA (12) Wilmington 3 584 Link
North Billerica     LRTA (3/4, 13) North Billerica 5 922 Link
Lowell     LRTA (1/8, 2, 3/4, 5, 6/9, 7, 10, 11, 12, 13, 14, 15, 16, 17, 18, 20)
  MVRTA (24)
Lowell 6 1,522 Link
Malden Center  
  MBTA bus (97, 99, 101, 104, 105, 106, 108, 131, 132, 137, 411, 430)
Malden 1A 147 Link
Oak Grove  
  MBTA bus (131, 132, 137)
Malden 1A Link
Wyoming Hill
  MBTA bus (131, 132, 137)
Melrose 1 138 Link
Melrose/Cedar Park Melrose 1 99 Link
Melrose Highlands   Melrose 1 306 Link
Greenwood Wakefield 2 92 Link
Wakefield Wakefield 2 483 Link
Reading   Reading 2 855 Link
North Wilmington Wilmington 3 58 Link
Ballardvale   Andover 4 200 Link
Andover     MVRTA (2, 21) Andover 5 409 Link
Lawrence     MVRTA (3, 9) Lawrence 6 482 Link
Bradford   Bradford 7 170 Link
Haverhill     Amtrak: Downeaster
  MVRTA (1, 13, 14, 15, 16, 17, 18)
Haverhill 7 290 Link
Chelsea  
  MBTA bus (112, 114)
Chelsea 1A Link
River Works Lynn 1A 27 Link
Lynn  
  MBTA bus (426, 426W, 429, 435, 436, 439, 441, 442, 455, 456)
Lynn 1A 549 Link
Swampscott   Swampscott 3 891 Link
Salem  
  MBTA bus (435, 450, 450W, 451, 455, 456)
Salem 3 2,326 Link
Beverly     CATA (City of Beverly shuttle, Beverly Commuter) Beverly 4 1,382 Link
North Beverly   Beverly 5 202 Link
Hamilton/Wenham   Hamilton 5 262 Link
Ipswich     CATA (Ipswich/Essex Explorer (summer)) Ipswich 6 407 Link
Rowley   Rowley 7 113 Link
Newburyport     MVRTA (19, 20) Newburyport 8 463 Link
Montserrat     CATA (City of Beverly Shuttle) Beverly 4 254 Link
Prides Crossing Beverly 5 15 Link
Beverly Farms   Beverly 5 107 Link
Manchester   Manchester-by-the-Sea 6 198 Link
West Gloucester     CATA (West Gloucester) Gloucester 7 37 Link
Gloucester     CATA (Beverly Commuter, Lanesville, Saturday Mall, Gloucester Crossing/Business Express, Stage Fort Park Shuttle (summer)) Gloucester 7 296 Link
Rockport     CATA (Beverly Commuter, Lanesville, Rockport Shuttle (summer only)) Rockport 8 165 Link

Future stations edit

Under construction edit

 
Middleborough station near completion, 2023

Six stations are under construction as part of the South Coast Rail project.

Station Line City Planned opening Refs
Middleborough Middleborough mid-2024 [6]
East Taunton East Taunton mid-2024 [6]
Church Street New Bedford mid-2024 [6]
New Bedford New Bedford mid-2024 [6]
Freetown Freetown mid-2024 [6]
Fall River Fall River mid-2024 [6]

Planned edit

 
The planned site of Battleship Cove station

Five additional stations are planned, but not funded, as part of the second phase of the South Coast Rail project. West Station is planned as part of the redevelopment of the former Beacon Park Yard, while South Salem is municipally planned.

Station Line City Refs
Battleship Cove Fall River [7]
Easton Village North Easton [7]
North Easton North Easton/Stoughton [7]
Raynham Place Raynham [7]
South Salem Salem [8]
Taunton Taunton [7]
West Station Boston [9]

Former stations edit

Stations closed without MBTA subsidy edit

 
Remains of the platform of Salem Street station
 
An early-20th-century postcard of Medway station
 
Durham station, closed by the B&M in 1967, has been served by Amtrak since 2001.

The MBTA was formed in August 1964 to subsidize suburban commuter rail services. Subsidies for Boston and Maine Railroad (B&M) lines north of Boston began in 1965; subsidies for New York Central Railroad and New Haven Railroad lines west and south of Boston began later.[10] If a railroad was given ICC permission to discontinue a service, the MBTA would subsidize operation within its funding district (within about 15–25 miles [24–40 km] of Boston), while municipalities outside the district could contract with the MBTA to fund continued service.

A number of out-of-district stations (and several in-district stations) were closed in January 1965; most reopened that June, or over the next decades. However, several minor stations were never reopened. In June 1967, the B&M discontinued never-subsidized Boston–Dover and Boston–Concord round trips - the last remains of B&M interstate service.[10] Several out-of-district stations were also closed in April 1966 when the MBTA began subsidizing several New Haven Railroad lines.[10]

This listing includes only stations closed when MBTA or local subsidies began, or on services that were never subsidized. Stations that later reopened are not listed.

Station Line City Date closed[10]
Blackstone Blackstone Line Blackstone April 24, 1966
Medway West Medway Branch Medway April 24, 1966
West Medway West Medway Branch Medway April 24, 1966
Ordway Central Mass Branch Hudson January 18, 1965
Gleasondale Central Mass Branch Hudson January 18, 1965
Hudson Central Mass Branch Hudson January 18, 1965
Riverview Fitchburg Line Waltham January 18, 1965
Walnut Hill Lowell Line Woburn January 18, 1965
Silver Lake Lowell Line Wilmington January 18, 1965
East Billerica Lowell Line Billerica January 18, 1965
North Chelmsford Boston–Concord Chelmsford June 30, 1967
Wakefield Junction Reading Line Wakefield January 18, 1965
Salem Street Boston–Dover Wilmington June 30, 1967
Atkinson Boston–Dover Atkinson, NH June 30, 1967
Plaistow Boston–Dover Plaistow, NH June 30, 1967
Newton Junction Boston–Dover Newton, NH June 30, 1967
Powwow River Boston–Dover East Kingston, NH June 30, 1967
East Kingston Boston–Dover East Kingston, NH June 30, 1967
Exeter Boston–Dover Exeter, NH June 30, 1967
Newfields Boston–Dover Newfields, NH June 30, 1967
Newmarket Boston–Dover Newmarket, NH June 30, 1967
Durham Boston–Dover Durham, NH June 30, 1967
Dover Boston–Dover Dover, NH June 30, 1967
Hampton Portsmouth Line Hampton, NH January 4, 1965
North Hampton Portsmouth Line North Hampton, NH January 4, 1965
Portsmouth Portsmouth Line Portsmouth, NH January 4, 1965

Stations dropped after the start of MBTA subsidies edit

 
The abandoned outbound platform of Lechmere Warehouse station, the most recent station to permanently close
 
The Minuteman Bikeway now passes through the former trainshed of Lexington Depot
 
The short-lived Tufts University station

The following stations had MBTA-subsidized service at one point, but are no longer served by the MBTA. Most were closed between 1967 and 1981, as four limited-service lines and a number of low-ridership stations were dropped. Three additional low-ridership stations were dropped in the 1980s and 1990s.[10]

Station Line City Date closed[10][11]
Mount Hope Boston/Roslindale November 3, 1979
East Foxboro Foxborough November 1977
East Dedham Dedham April 21, 1967
Stone Haven Dedham April 21, 1967
Dedham Dedham April 21, 1967
Charles River Dover April 21, 1967
Dover Dover April 21, 1967
Farm Street Medfield April 21, 1967
Medfield Medfield April 21, 1967
Clicquot Millis April 21, 1967
Millis Millis April 21, 1967
Riverside Newton October 28, 1977
Waltham North Waltham November 26, 1971
Waltham Highlands Waltham November 26, 1971
Weston Weston November 26, 1971
Cherry Brook Weston November 26, 1971
Tower Hill Wayland November 26, 1971
Wayland Wayland November 26, 1971
East Sudbury Sudbury November 26, 1971
South Sudbury Sudbury November 26, 1971
Clematis Brook Waltham June 1978
Beaver Brook Waltham June 1978
West Acton Acton March 1, 1975
Littleton Littleton March 1, 1975
Gardner Gardner December 31, 1986
Lake Street Arlington January 10, 1977
Arlington Arlington January 10, 1977
East Lexington Lexington January 10, 1977
Pierce's Bridge Lexington January 10, 1977
Munroe Lexington January 10, 1977
Lexington Lexington January 10, 1977
North Lexington Lexington January 10, 1977
Bedford Bedford January 10, 1977
Tufts University Medford October 1979
Cross Street Woburn January 30, 1981
Woburn Woburn January 30, 1981
Winchester Highlands Winchester June 1978
Lechmere Warehouse Woburn 1996
Nashua Nashua, NH March 1, 1981
Merrimack Merrimack, NH March 1, 1981
Manchester Manchester, NH March 1, 1981
Concord Concord, NH March 1, 1981
Shawsheen Andover April 27, 1980
North Andover North Andover November 1974
Harbor Gloucester January 7, 1985

Relocated stations edit

 
Remains of the former Salem station, disused since 1987, with the repurposed station building at right

Most stations reconstructed (or closed and reopened) during the MBTA era have been rebuilt on or adjacent to the site of the old station. However, several stations have been substantially relocated.

Station Line City Date closed[10] Notes
Pawtucket-Central Falls Pawtucket, RI February 20, 1981 Pawtucket/Central Falls station opened 0.5 miles (0.80 km) southwest in 2023.
Providence Providence, RI February 20, 1981 Amtrak service moved to Providence station (on a new alignment 0.25 miles (0.40 km) north) in 1986; MBTA service to Providence resumed in 1988 using the new station.
Lawrence Lawrence December 6, 2005 Moved 0.4 miles (0.6 km) east
Salem Salem August 10, 1987 Moved 0.5 miles (0.8 km) north
Newburyport Newburyport April 2, 1976 MBTA service resumed in 1998 using a station 1.0 mile (1.6 km) south.
Chelsea Chelsea November 15, 2021 Moved 0.4 miles (0.64 km) west

References edit

  1. ^ "Transit Ridership Report: Fourth Quarter 2022" (PDF). American Public Transportation Association. March 1, 2023. p. 5.
  2. ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  3. ^ "Commuter Rail Safety and Resiliency Program". Massachusetts Bay Transportation Authority. Archived from the original on November 2, 2022.
  4. ^ "Commuter Rail Fare Zones" (PDF). Massachusetts Bay Transportation Authority. March 23, 2021.
  5. ^ Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  6. ^ a b c d e f Medeiros, Dan (September 29, 2023). "South Coast Rail passenger service is being delayed. Here's why, explained in 60 seconds". The Herald News. Archived from the original on September 30, 2023.
  7. ^ a b c d e "South Coast Rail Full Build (Stoughton Electric)". Massachusetts Department of Transportation.
  8. ^ Copeland, Dave (March 19, 2020). "City Officials Plan South Salem MBTA Commuter Rail Stop". Salem Patch. Retrieved June 7, 2021.
  9. ^ Vaccaro, Adam (December 2, 2017). "Transit station delayed for big Mass. Pike project". Boston Globe.
  10. ^ a b c d e f g Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  11. ^ Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. ISBN 9780685412947.