Line 9 (Chengdu Metro)

Chengdu Metro Line 9 (simplified Chinese: 成都地铁9号线; traditional Chinese: 成都地鐵9號線) is located in Chengdu, Sichuan and forms an extension to the existing Chengdu Metro system. The line officially opened on 18 December 2020.[3]

Line 9
9
Line 9 platform at Huaxing station
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations13
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Yuanhua Depot (元华停车场)
Wuqing Depot (武青车辆段)
Rolling stock8-car Type A (Driverless)
History
Opened18 December 2020; 3 years ago (2020-12-18)
Technical
Line length22.18 km (13.8 mi)[1] (current)
43.9 km (in 2024)
Number of tracks2
CharacterUnderground and elevated
Electrificationoverhead lines, 1,500 V DC
Operating speed140km/h [2]

Line 9 Phase I runs from Financial City East to Huangtianba and is envisioned to be the second loop line in Chengdu (after Line 7) in the future. Line 9's color is bright orange.[4]

It is the first ever fully automated ATO GoA 4 metro line in Chengdu.[5]

Line 9 uses high capacity Type A 8-car trains.[6] The 13 stations were designed by London-based Sepanta in collaboration with Chinese architect Jiang & Associates Design.[7]

Progress edit

  • On July 11, 2016, the NDRC approved the third phase of expansion for the Chengdu Metro consisting of Line 6 phase 2 and 3, Line 8, Line 9, Line 10 Phase 2, Line 17 Phase 1 and Line 18.[8]
  • 2016-12-29, Sichuan and the Sichuan Development and Reform Commission approved and officially agreed to construct Line 1 Phase 1.[9] The first 4 stations started construction on the same day.[10]
  • 2017-11-10, Line 9's first tunnel machine started work at Yuanhua Depot connection.[11]
  • 2018-3-17, Line 9's first section (Yuanhua Depot connection) finished tunnel work
  • 2018-11-29, Line 9 started track-laying.
  • 2019-01-22, first train is finished at CRRC Changchun Railway Vehicles.[12]
  • On July 18, 2019, the Wuqing Power Centre project is completed.[13]
  • 2019-07-30, Line 9 finished all tunnel work.
  • 2020-01-14, as the last section of track is installed between Sanyuan and Jincheng Avenue Stations, completing track installation of Line 9 Phase I.[14]
  • 2020-06-10, Chengdu Metro started 3-month trial operation for Line 9 and Line 17.[15]

Stations edit

Station

Station name Transfer Distance
km
Location
English Chinese
09 01 Financial City East 金融城东 6 -- 0.000 Jinjiang
09 02 Xindao 心岛 1.257 1.257 Wuhou
09 03 Incubation Park 孵化园 1 18 0.645 1.902
09 04 Jincheng Avenue 锦城大道 5 1.557 3.459
09 05 Sanyuan 三元 8 2.532 5.991
09 06 Taiping Temple 太平寺 1.794 7.785
09 07 Huaxing 华兴 10 1.442 9.227
09 08 Cuqiao 簇桥 1.616 10.843
09 09 Wuqing South Road 武青南路 3 1.702 12.545
09 10 Jitouqiao 机投桥 17 2.766 15.311
09 11 Peifeng 培风  13  1.671 16.982
09 12 Chengdu West Railway Station 成都西站 4  CMW

   T2 

2.640 19.622 Qingyang
09 13 Huangtianba 黄田坝 1.826 21.448

References edit

  1. ^ "成都地铁五线齐发!成都跻身中国城市轨道交通"第四城"". 18 December 2020.
  2. ^ 四川新闻网. "成都地铁9号线今年开工 时速140公里37分钟跑全程". 网易新闻. Archived from the original on 2017-03-05. Retrieved 2017-03-19.
  3. ^ "China's Chengdu Metro opens five new lines in city". Railway Technology. 22 December 2020. Retrieved 23 December 2020.
  4. ^ "测评!成都地铁的色号,总有一款你会喜欢!". 成都地铁 Chengdu Metro. 2020-07-22.
  5. ^ "成都地铁9号线将实现自动驾驶" (in Chinese). 腾讯大成网. 2017-09-28. Archived from the original on 2020-07-26. Retrieved 2017-09-28.
  6. ^ 尹沁彤. "不怕挤 地铁9号线、17号线多两节车厢". 成都商报.[permanent dead link]
  7. ^ "Sepanta completes 13 Chinese metro stations". Building Design. 23 December 2020. Retrieved 23 December 2020.
  8. ^ 关于成都市城市轨道交通第三期建设规划(2016~2020年)的批复(发改基础〔2016〕1493号). www.ndrc.gov.cn. Archived from the original on 22 June 2019. Retrieved 2018-08-19.
  9. ^ "成都轨道交通8号线一期工程、9号线一期工程、10号线二期工程可研报告获批" (in Chinese). 成都市发展和改革委员会. 2016-12-30. Archived from the original on 2017-08-08. Retrieved 2016-12-30.
  10. ^ "成都地铁8号线一期9号线一期10号线二期正式开工" (in Chinese). 网易. 2016-12-31. Archived from the original on 2017-08-08. Retrieved 2016-12-31.
  11. ^ "成都地铁首条无人驾驶线路 9号线一期正线开始掘洞" (in Chinese). 四川在线. 2017-11-10. Retrieved 2017-11-10.
  12. ^ "厉害!成都首条无人驾驶地铁要来了!全自动无人驾驶列车亮相!". Sohu.
  13. ^ 中铁八局. "zh:成都地铁9号线一期机电系统2标武青主变电所电气安装工程顺利通过验收".[permanent dead link]
  14. ^ "成都地铁9号线一期工程长轨通" (in Chinese). 中国中铁. 2020-01-24. Retrieved 2020-07-26.
  15. ^ "即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".