Future Science City North station

Future Science City North station (Chinese: 未来科学城北站; pinyin: Wèilái Kēxuéchéng Běi Zhàn) is the northern terminus of Line 17 of Beijing Subway which opened on 30 December 2023.[1][2] It is also called Weilɑikexuechengbei Zhɑn.

Weilɑikexuechengbei
(Future Science City North)

未来科学城北
Beijing Subway
Beijing Subway station
Platform billboard
General information
LocationBeijing Future Science City
Tugou Village (土沟村), Xiaotangshan Town, Changping District, Beijing
People's Republic of China
Coordinates40°07′44″N 116°27′45″E / 40.12878°N 116.46248°E / 40.12878; 116.46248
Managed byBeijing MTR
Line(s)
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
History
OpenedDecember 30, 2023; 3 months ago (2023-12-30)
Services
Preceding station Beijing Subway Following station
Terminus Line 17 North section Future Science City
Location
Weilɑikexuechengbei (Future Science City North) is located in Beijing
Weilɑikexuechengbei (Future Science City North)
Weilɑikexuechengbei
(Future Science City North)
Location in Beijing

Location edit

The station is located in the Beijing Future Science City, in the Tugou Village, Xiaotangshan, Changping, Beijing.[3]

History edit

The construction of the station started in 2016.[4] The station was called Weilai Kejicheng Beiqu (Chinese: 未来科技城北区; pinyin: Wèilái Kējìchéng Běiqū; lit. 'North Area of Future Science and Technology City') at the time.

In 2021, the station was officially renamed as Future Science City North.[5]

The structure of the station was completed no later than 2022.[6]

Station layout edit

Future Science City North station is an underground station, orientated northeast–southwest, with a total length of 320.1 metres, a total width of the main structure of 23.7 metres, a total floor area of 22,962 square metres, and a platform length of 186 metres, with a platform width of 14 metres.[7]

The station has three underground floors and one island platform. There is property above the station developed by China Resources Land.[8]

There are 3 exits, lettered B, C and D, with Exit B leading to Yingcai North 1st Street, C to Weilaikexuecheng Road and D to Puqing Temple Road. Exit C is accessible.

References edit

  1. ^ "地铁17号线北段等三条地铁线(段)开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 2023-12-29. Retrieved 2023-12-29. 2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
  2. ^ "北京地铁17号线北段计划今年底开通试运营_中新社_北京分社". www.bj.chinanews.com.cn (in Simplified Chinese). Retrieved 2023-12-18.
  3. ^ "地名公告" (in Simplified Chinese). 2023-07-01. Archived from the original on 2023-07-01. Retrieved 2023-12-19.
  4. ^ "北京地铁17号线两站率先开工 一车站将建最长站台". news.lqsbcl.net (in Simplified Chinese). Retrieved 2023-12-19.
  5. ^ "轨道交通17号线、19号线一期、昌平线南延一期工程沿线车站命名预案" (PDF) (in Simplified Chinese).
  6. ^ 北京企业信息技术有限公司. "未来科学城科创服务平台". saas-wlc-vue. Retrieved 2023-12-19.
  7. ^ 北京地铁17号线01标项目经理部 (Feb 2016). "北京地铁17号线01标施工测量方案". 北京地铁17号线01标施工测量方案 (in Simplified Chinese). 中铁十六局集团有限公司. Archived from the original on 19 August 2021. Retrieved 19 Dec 2023.{{cite journal}}: CS1 maint: numeric names: authors list (link)
  8. ^ "华润·未来城市 智慧生活未来已来_黄金楼市·地产"再出发"_新京报电子报". epaper.bjnews.com.cn. Retrieved 2023-12-19.