Draft:Hermoss-San Jose Transmission Line

  • Comment: Nothing has changed since the last declined and the concerns haven't been addressed. Please add more references. Jovanmilic97 (talk) 10:50, 20 December 2023 (UTC)
  • Comment: Neither source is independent, they are from affiliated construction companies. Mach61 (talk) 17:18, 19 December 2023 (UTC)

Hermosa-San Jose Transmission Line
Location
FoundedMay 27, 2023
CountryPhilippines
ProvinceHermosa, Bataan and San Jose del Monte, Bulacan
General directionheading West
FromHermosa Substation
Passes throughGuagua, Candaba Swamp, NLEX Candaba Viaduct, Pampanga and Pulilan
ToSan Jose Substation
Ownership information
OwnerNational Grid Corporation of the Philippines (NGCP)
OperatorNational Grid Corporation of the Philippines (NGCP)
Construction information
Cable layerTASCR/AS
ContractorsFirst Balfour, BAUER
Construction costP10.2 billion
Technical information
Total length82.41 km (51.21 mi)
No. of transmission towers96
AC voltage500 kV

Technical description edit

The line conductor is 4x410mm2 TACSR/AS conductor, quadruple bundle power line, and double circuit line. The line consists of 96 lattice towers.[1]

Notes edit

References edit

  1. ^ "Hermosa-San Jose Transmission line". First Balfour. May 27, 2023. Archived from the original on September 30, 2023. Retrieved December 19, 2023.