The Avenue P station is a local station on the IND Culver Line of the New York City Subway. It is served by the F train at all times and the <F> train during rush hours in the peak direction.
Avenue P | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
New York City Subway station (rapid transit) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station statistics | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Address | Avenue P & McDonald Avenue Brooklyn, New York | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Borough | Brooklyn | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Midwood, Gravesend, Bensonhurst | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 40°36′31.46″N 73°58′22.85″W / 40.6087389°N 73.9730139°W | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Division | B (IND, formerly BMT)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | IND Culver Line BMT Culver Line (formerly) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | F (all times) <F> (two rush hour trains, peak direction) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 side platforms | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 3 (2 in regular service) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | March 16, 1919[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Traffic | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2023 | 538,576[3] 14.9% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rank | 377 out of 423[3] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
History
editThis station opened at 3:00 a.m. on March 16, 1919, as part of the opening of the first section of the BMT Culver Line. The initial section began at the Ninth Avenue station and ended at the Kings Highway station.[2][4] The line was operated as a branch of the Fifth Avenue Elevated line, with a free transfer at Ninth Avenue to the West End Line into the Fourth Avenue Subway. The opening of the line resulted in reduced travel times between Manhattan and Kings Highway. Construction on the line began in 1915, and cost a total of $3.3 million.[5][6][7][8] Trains from this station began using the Fourth Avenue Subway to the Nassau Street Loop in Lower Manhattan when that line opened on May 30, 1931.[9] The Fifth Avenue Elevated was closed on May 31, 1940, and elevated service ceased stopping here.[10][11] On October 30, 1954,[10][12] the connection between the IND South Brooklyn Line at Church Avenue and the BMT Culver Line at Ditmas Avenue opened. With the connection completed, all service at the stations on the former BMT Culver Line south of Ditmas Avenue, including this one, were from then on served by IND trains.[13]
From June 1968[14] to 1987, express service on the elevated portion of the line from Church Avenue to Kings Highway operated in the peak direction (to Manhattan AM; to Brooklyn PM), with some F trains running local and some running express. During this time period, this station was used as a local station.[15][16] Express service ended in 1987, largely due to budget constraints and complaints from passengers at local stations. Express service on the elevated Culver Line was ended due to necessary structural work, but never restored.[15][16][17]
From June 7, 2016, to May 1, 2017, the southbound platform at this station was closed for renovations.[18] The Manhattan-bound platform was closed for a longer period of time, from May 22, 2017 until July 30, 2018.[19][20]
Station layout
editPlatform level | Side platform | |
Northbound local | ← toward Jamaica–179th Street (Avenue N) | |
Peak-direction express | No regular service | |
Southbound local | toward Coney Island–Stillwell Avenue (Kings Highway) → | |
Side platform | ||
Mezzanine | Fare control, station agent, MetroCard and OMNY machines | |
Ground | Street level | Entrance/exit |
This elevated station has two side platforms and three tracks with the center track not normally used.
Exits
editThe station has a full-time mezzanine at Avenue P and McDonald Avenue. It has six staircases: two to the northeast and southwest corners of that intersection, and two to each platform.[21] There is a station facility constructed inside the mezzanine on the Manhattan-bound side, giving evidence that there was a third staircase that was removed at the southeast corner of McDonald Avenue and Avenue P.
References
edit- ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- ^ a b Legislative Documents. J.B. Lyon Company. January 1, 1920.
- ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ Eisenstadt, Peter R.; Moss, Laura-Eve (January 1, 2005). The Encyclopedia of New York State. Syracuse University Press. ISBN 9780815608080.
- ^ "B.R.T. Will Open Culver Line Elevated Road as Far as Kings Highway on Sunday Next" (PDF). The New York Times. March 9, 1919. p. 23. Retrieved October 9, 2016.
- ^ "Culver Line Open Today" (PDF). The New York Times. March 16, 1919. p. 8. Retrieved October 9, 2016.
- ^ Kracke, Frederick J.H. (March 16, 1919). "New Rapid Transit Link in Operation". The New York Times. p. 106. Retrieved July 30, 2020.
- ^ "Culver Elevated Opens". The New York Times. March 17, 1919. p. 21. Retrieved July 30, 2020.
- ^ "Nassau St. Service Outlined by B. M. T." The New York Times. May 21, 1931. p. 29. Retrieved July 30, 2020.
- ^ a b Chiasson, George (May 2010). "A History of the F (and V) Train Service". New York Division Bulletin. 53 (5). Electric Railroaders' Association: 1, 4.
- ^ "Last Train is Run on Fulton St. 'El'". The New York Times. June 1, 1940. p. 11. Retrieved July 30, 2020.
- ^ NYCTA - Pass for Culver Line Ceremonies - 1954, April 14, 2015, retrieved July 30, 2020
- ^ "Adequate Transit Promised for City". The New York Times. October 29, 1954. p. 25. Retrieved July 30, 2020.
- ^ "'F' Line Rush-Hour Service Will Be Added in Brooklyn" (PDF). The New York Times. June 8, 1969. Retrieved August 26, 2016.
- ^ a b Review of F Line Operations, Ridership, and Infrastructure (PDF). nysenate.gov (Report). MTA New York City Transit Authority. October 7, 2009. Archived from the original (PDF) on May 31, 2010. Retrieved July 28, 2015.
- ^ a b Feasibility and Analysis of F Express Service in Brooklyn (PDF). Metropolitan Transportation Authority (Report). May 2016. Archived (PDF) from the original on May 27, 2016. Retrieved June 24, 2016.
- ^ Geberer, Raanan (March 6, 2013). "Light at End of Tunnel: F Train Express may return". Brooklyn Daily Eagle. Archived from the original on March 27, 2020. Retrieved July 28, 2015.
- ^ "Coney Island-bound F subway trains will not stop at Avenue I, Bay Pkwy, Avenue N, Avenue P, Avenue U, and Avenue X until early 2017". web.mta.info. Metropolitan Transportation Authority. 2016. Archived from the original on May 27, 2016. Retrieved October 9, 2016.
- ^ "New York City Subway Map" (PDF). mta.info. Metropolitan Transportation Authority. May 1, 2017. Archived from the original (PDF) on May 10, 2017. Retrieved May 2, 2017.
- ^ "$140 Million Culver F subway Line Station Renewal Project Begins Next Phase". web.mta.info. Metropolitan Transportation Authority. May 18, 2017. Retrieved May 18, 2017.
- ^ "MTA Neighborhood Maps: Midwood" (PDF). mta.info. Metropolitan Transportation Authority. 2015. Retrieved August 2, 2015.
External links
edit- nycsubway.org – BMT Culver Line: Avenue P
- Station Reporter — F Train
- The Subway Nut — Avenue P Pictures Archived January 5, 2018, at the Wayback Machine
- Avenue P entrance from Google Maps Street View
- Platforms from Google Maps Street View