Westhoughton railway station

Westhoughton railway station is one of the two stations which serve the town of Westhoughton, in the Metropolitan Borough of Bolton, Greater Manchester, north-western England. The station is 15+12 miles (24.9 km) north west of Manchester Piccadilly.

Westhoughton
National Rail
Westhoughton railway station in 2015
General information
LocationWesthoughton, Bolton
England
Grid referenceSD654067
Managed byNorthern Trains
Transit authorityTransport for Greater Manchester
Platforms2
Other information
Station codeWHG
ClassificationDfT category F1
History
Opened1848
Passengers
2018/19Decrease 0.176 million
2019/20Increase 0.199 million
2020/21Decrease 55,874
2021/22Increase 0.165 million
2022/23Increase 0.180 million
Location
Map
Notes
Passenger statistics from the Office of Rail and Road

History edit

It is the only station on a line connecting the Manchester-Preston Line at Bolton and the Manchester-Southport Line at Hindley near Wigan. It was opened in 1848, along with the line, by the Liverpool and Bury Railway, when the route between the two via Wigan and Bolton was completed. It subsequently became part of the Lancashire and Yorkshire Railway.

The station is in Church Street, about ten minutes walk from the town centre. Westhoughton is also served by Daisy Hill railway station, around 15 minutes on foot from the town centre, on the Manchester-Southport Line, via Atherton.

Unlike the town's other station at Daisy Hill, Westhoughton station has been unstaffed since 1974, when all the trackside and roadside buildings were demolished. This is despite the fact that Westhoughton enjoyed similar levels of patronage. From 2004 to 2012, passenger usage increased by 231%.[1] The station's passenger usage seems set to grow further, as there has been considerable housing development on brownfield land, which was the site of a mine, within a few hundred yards of the station, as the town continues to grow as a commuter suburb.[2]

In the late 1980s, Westhoughton very nearly had a new third station at Dobb Brow, and planning went as far as allowing the proposed station to appear on railway maps as "may open during the course of this timetable". At the last moment, however, plans were shelved. In 2000, these plans were revived, but did not come to fruition.[3]

In 2008, unspecified development was planned for the station as part of GMPTE's plans to impose a congestion charge on drivers entering Manchester city centre at peak times, and use the funds raised to upgrade public transport provision. The scheme was dropped after the proposal was substantially rejected in a referendum.[4]

Location and facilities edit

There are neither toilets nor refreshment facilities, nor a payphone since 2011. A card-only ticket machine and "remote travel information" are provided by information screens and automated announcements on each platform.

Until 2013, The Commercial pub stood next door to the station, when it was closed and put up for sale.

There are bus stops for services to many parts of the town, and to the town's other station, Daisy Hill.

Access to the Bolton platform is by a long steep multi-stepped ramp and to the Wigan platform via a steep unstepped ramp.[5] Access to both platforms has not been improved for those with prams, pushchairs or wheelchairs.

There is a large free car park with unsignposted access to the station.

The station is partly maintained by the Friends of Westhoughton Station, a voluntary group set up in 2012 with the aim of brightening up the station and providing floral displays.[6][7]

Services edit

 
A Northern Rail Class 150, with a service to Wigan Wallgate in 2015
 
A Northern rail Class 150, with a service to Bolton in 2015

For many years Westhoughton had an hourly service.[8] Since the 1980s services have dramatically improved:

Since the December 2022 timetable change, the service pattern has been altered significantly. All westbound trains run to and from Southport, at a frequency of 2 trains per hour. Eastbound, there is one train per hour that runs semi-fast to Manchester Oxford Road and one per hour that calls at all stations to Stalybridge via Manchester Victoria - this includes the daily parliamentary service to and from Clifton. All services run via Bolton and Salford Crescent. There are no longer regular trains to Wigan North Western on weekdays - passengers must change at Wigan Wallgate if travelling to these destinations, although there is one train to North Western later at night. On Sundays an hourly service runs from this station to Wigan North Western westbound and Stalybridge eastbound. The service to Southport operates via Walkden on a Sunday. On some weekends this service will be curtailed at Manchester Victoria due to ongoing works as part of the Transpennine Route Upgrade. All services are operated by Classes 150 and 156 diesel multiple units and Class 769 bi-mode units, although no 769s currently operate on Sundays.

On weekends, trains were replaced by buses until the end of 2018 due to ongoing electrification work on the Preston - Bolton - Salford Crescent route (which ran significantly behind schedule).

Regular through services to Liverpool via Wallgate and Kirkby once operated via Bolton/Westhoughton, which originally formed part of the Liverpool and Bury Railway and also the L&Y main line between Liverpool Exchange and Manchester, prior to the opening of the direct route through Swinton. However, since the western end of the route was electrified in 1978, Kirkby trains have either terminated at Wigan or been re-routed via Atherton.

Trains continuing to Bolton pass by, but cannot stop at, Lostock (Junction) station, as there are no platforms for the Wigan line. Passengers wishing to travel from Westhoughton to Preston and Blackpool must either change at Wigan Wallgate, usually crossing the road to Wigan North Western, a 100 yards walk, or via Bolton. Connections to London Euston can be made at Wigan, which is recommended as there is always only one change.

Between May and December 2015, the service pattern was altered temporarily due to the work being carried out to widen Farnworth Tunnel as part of the plans to electrify the Manchester to Preston Line. With only limited capacity south of Bolton, Manchester services were reduced to an hourly frequency, and curtailed at Bolton on Monday to Fridays, whilst weekend services were replaced by buses as Bolton station was also undergoing upgrade work for electrification. A peak hour bus shuttle to and from Daisy Hill was introduced to connect with those trains that had been diverted via Walkden, whilst westbound trains ran to Kirkby once again rather than Southport.[9] This timetable ended in December 2015, when the line through Farnworth Tunnel was reopened.

Upgrade and electrification edit

An upgrade and electrification to the railway line through the station was first announced in December 2013.[10] It was officially announced as definitely going ahead on 1 September 2021.[11] As of January 2022 electrification and associated work is in progress. This includes bridge renewals and modifications as well as platform lengthening and station modification.[12][13] The Bolton to Wigan electrification including Westhoughton station upgrade is scheduled for completion in 2024.[14] Scaffolds have been installed on the bridge over the station on Church Street in preparation for these works. The platforms at Westhoughton, Hindley and Ince will also be extended to fit 6-car trains, they can currently only fit 4 despite announcements at other stations saying that passengers for Westhoughton must board the front 3 coaches (of a 4-car train) to disembark.

References edit

  1. ^ "ORR Station Usage Statistics". Office of Rail and Road. Archived from the original on 4 July 2012. Retrieved 7 July 2008.
  2. ^ "Westhoughton". swanonline.co.uk. Archived from the original on 3 October 2006.
  3. ^ "BEN OPINION: Top priority on the trains". The Bolton News. Retrieved 20 June 2015.
  4. ^ "Voters reject congestion charge". BBC News. 12 December 2008. Retrieved 29 August 2013.
  5. ^ "Westhoughton Station Plan". National Rail. Retrieved 20 June 2015.
  6. ^ "Who we are". Friends of Westhoughton Station. Retrieved 20 June 2015.
  7. ^ "New-look for Westhoughton railway station". MyWesthoughton. Retrieved 20 June 2015.
  8. ^ BR Timetable 1973, table 95
  9. ^ "Timetable 14 - Manchester to Southport, 2 May - 4 October 2015" (PDF). Northern Rail. Retrieved 20 June 2015.
  10. ^ "Road and rail projects to boost local and regional transport". GOV.UK. Retrieved 25 January 2022.
  11. ^ News, Mirage (1 September 2021). "Green light given for Wigan to Bolton electrification | Mirage News". www.miragenews.com. Retrieved 1 September 2021. {{cite web}}: |last= has generic name (help)
  12. ^ ""Absolutely horrendous" rail works keep residents up all night". The Bolton News. Retrieved 25 January 2022.
  13. ^ "Powering ahead: bridge upgrade for Wigan to Bolton electrification". Network Rail Media Centre. Retrieved 20 January 2022.
  14. ^ "Green light given for Wigan to Bolton electrification". GOV.UK. Retrieved 1 September 2021.

External links edit

Preceding station   National Rail Following station
Northern Trains
Northern Trains
Southport - Manchester Oxford Road
(Monday - Saturday only)
  Historical railways  
Hindley
Line and station open
  Lancashire and Yorkshire Railway
Liverpool and Bury Railway
  Chew Moor
Line open, station closed

53°33′21″N 2°31′24″W / 53.5558°N 2.5233°W / 53.5558; -2.5233