USS Doherty (DE-14) was an Evarts class destroyer escort constructed for the United States Navy during World War II. She was sent off into the Pacific Ocean to protect convoys and other ships from Japanese submarines and fighter aircraft. She performed escort and antisubmarine operations in dangerous battle areas and returned home safely at war's end.

USS Doherty (DE 14) 23 February 1943: off Mare Island
History
United States
NameUSS Doherty (DE-14)
NamesakeJohn Joseph Doherty
BuilderMare Island Navy Yard
Laid down28 February 1942
Launched29 August 1942 as HMS Berry (BDE-14)
Commissioned6 February 1943 as USS Doherty (DE-14)
Decommissioned14 December 1945
Stricken8 January 1946
FateSold for scrap on 26 December 1946
General characteristics
Class and typeEvarts class destroyer escort
Displacement1,140 (standard), 1,430 tons (full)
Length283 ft 6 in (86.41 m) (waterline), 289 ft 5 in (88.21 m) (overall))
Beam35 ft 2 in (10.72 m)
Draft11 ft 0 in (3.35 m) (max)
Propulsion
Speed19 kn (35 km/h)
Range4,150 nm
Complement15 officers, 183 enlisted
Armament3 × 3 in (76 mm) cal Mk 22 dual purpose guns (1×3), 4 × 1.1"/75 caliber gun (1×4), 9 × Oerlikon 20 mm Mk 4 AA cannons, 1 × Hedgehog Projector Mk 10 (144 rounds), 8 × Mk 6 depth charge projectors, 2 × Mk 9 depth charge tracks

Namesake edit

John Joseph Doherty was born on 26 February 1919 in Charlestown, Massachusetts. He enlisted in the United States Naval Reserve on 1 March 1940 and was appointed aviation cadet on 9 July 1940. Assigned to Bombing Squadron 6 on board USS Enterprise, Ensign Doherty was reported missing in action 1 February 1942 during the Marshall Islands Raid. He posthumously received a special letter of commendation from the Secretary of the Navy for his devotion to duty and disregard of his own safety in accomplishing his mission in addition to the Distinguished Flying Cross.

Construction and commissioning edit

The ship, originally intended for transfer to Great Britain, was launched on 29 August 1942 as Berry (BDE-14) by Mare Island Navy Yard; retained for use by the United States Navy; named Doherty on 6 January 1943; and commissioned on 6 February 1943.

World War II service history edit

After escorting a convoy to Cold Bay, Alaska from 23 April–11 May 1943, Doherty served on escort duty between the west coast and Pearl Harbor from 23 May – 15 September. She sailed from San Francisco, California on 15 September for duty in Alaskan waters where she escorted merchant ships and occasionally served as plane guard for United States Army Air Forces bomber strikes over the Kuriles. Doherty returned to San Francisco for overhaul on 28 September 1944, then sailed to San Diego, California, for training.

Leaving San Diego on 23 November, Doherty operated as a training vessel in submarine exercises at Pearl Harbor from 2 December 1944 – 5 February 1945. She arrived at Guam on 16 February on escort duty and for the rest of the war plied between Guam and Okinawa on escort, patrol and air-sea rescue missions.

Sailing from Guam on 12 October, Doherty arrived at San Pedro, California on 28 October, was decommissioned on 14 December 1945, and sold for scrap on 26 December 1946.

Awards edit

  American Campaign Medal
  Asiatic-Pacific Campaign Medal
  World War II Victory Medal

References edit

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

External links edit