The Line 1 of Seville Metro connects the capital, Seville, with Mairena del Aljarafe, San Juan de Aznalfarache and Montequinto (Dos Hermanas).

Ciudad Expo - Olivar de Quintos
Overview
LocaleSeville
Stations22
Service
TypeRapid transit
SystemSeville Metro
History
Opened2 April 2010
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Ciudad Expo Bus interchange Parking
Cavaleri
San Juan Alto Parking
A-8058
San Juan Bajo Bus interchange Parking
SE-30
Blas Infrante
Parque de los Principes Bus interchange
Plaza de Cuba
Puerta Jerez MetroCentro (Seville)
Prado de San Sebastian Bus interchange MetroCentro (Seville)
San Bernardo Bus interchange MetroCentro (Seville)
Nervión
Gran Plaza Bus interchange
1º de Mayo
Amate
La Plata
Cocheras
Maintenance Yard
SE-30
Guadaíra (planned)
Pablo de Olavide Bus interchange
A-376
Condequinto Parking
Montequinto
Europa
Olivar de Quintos Parking

Description edit

Line 1 begins in Ciudad Expo (Mairena del Aljarafe), passing beneath the neighborhood, and arrives at the underground station of Calaveri. The line proceeds above ground to the higher portion of the neighborhood of San Juan de Aznalfarache. It continues its underground path through San Juan until arriving at the lower portion of the neighborhood. Next, the line passes above the highway SE-30 by way of a viaduct, and continues on ground level until the station of Blas Infante, located in Seville. From here the line passes underground through los Remedios (line 4, connection expected), Prado de San Sebastián (line 3, expected), San Bernardo (suburban trains connection), Nervión, 1º de Mayo (line 4, expected), Parque Amate, and Cocheras. After this segment, the line once again passes above ground and crosses above the highway SE-30 by way of viaduct before arriving at the station of Guadaira (still located in Seville, capital) which will be an interchange station with a suburban trains. The line extends above the surface towards the station of Pablo de Olavide and advances on the viaduct over the highway of Utrera before finally ending in the neighborhood of Montequinto, which has four stations. The last of these stations is an interchange station between the metro and tram networks. The line will not have a direct transfer with the line 2.

General characteristics edit

  • Method of construction: Tunnel boring machine, cut and cover, and viaduct.
  • Average depth: 16 metres (52 ft).
  • Cost: Around €650 million.
  • Municipalities served: Four.
  • Districts spanned: Four.
  • Population served: 227.974 approximately
  • Annual users: 14.000.000 approximately
  • Daily users: 39.000 approximately

Operation edit

Schedules edit

The closing time corresponds to the departure of the last train beginning from any of the starting stations in order to proceed serving the people waiting in other stations along the line.

NORMAL SCHEDULE
Weekdays Opening Closing
From Monday to Thursday
6:30 h
23:00 h
Fridays and weekdays preceding non-working days
6:30 h
2:00 h
Saturdays
7:30 h
2:00 h
Sundays and non-working days
7:30 h
23:00 h
*Applicable since 2009

Segmentation edit

In line 1 of the metro of Seville, the various rates are established according to the number of segment transfers that the user requires in order to travel from the original station to the final one. For this reason, the line is subdivided zones with different rates, which generally correspond with the borders of the municipalities of Seville and the rest of the metropolitan area through which the line runs. The stations of Blas Infante and Pablo de Olavide serve as the two nexuses between the three zones, and as such, any user moving from a zone to one of these two points does not pay the segment transfer fee.

 
Distribution of segments

Stations edit

Line   
  Ciudad Expo
  Cavaleri
  San Juan Alto
  San Juan Bajo
  Blas Infante
 *   P. Príncipes
  Plaza de Cuba
  Puerta Jerez
 *   Prado S. Sebastián
    San Bernardo
  Nervión
  Gran Plaza
 *     1º de Mayo
  Amate
  La Plata
  Cocheras
 *   Guadaíra*
  Pablo de Olavide
  Condequinto
  Montequinto
  Europa
  Olivar de Quintos
* In planning phase.
Out-of-system transfer; in planning phase.