The Victor J. Daniel Electric Generating Plant is a major 2-gigawatt, four-unit fossil fuel power plant, generating about 1 GWe from two coal-fired subcritical drum-type units and 1 GWe from its two newer, gas-fired combined-cycle units. Plant Daniel is located in Jackson County, near Escatawpa, Mississippi.[2] Named for Victor J. Daniel Jr., Mississippi Power's fourth president, the plant was designated by Southern Company Services, Inc. Jointly owned by Mississippi Power and Florida Power & Light (FPL), it is the largest generator of electric power in the state of Mississippi.[3]

Victor J. Daniel Electric Generating Plant
Map
CountryUnited States
LocationJackson County, near Escatawpa, Mississippi
Coordinates30°31′48″N 88°33′22″W / 30.53000°N 88.55611°W / 30.53000; -88.55611
StatusOperational
Commission dateUnit 1 (coal): Sept. 1977
Unit 2 (coal): June, 1981
Units 3, 4 (gas): Apr/May, 2001[1]
Owner(s)Mississippi Power,
Florida Power & Light
Thermal power station
Primary fuelBituminous coal, natural gas
Turbine technologySteam turbine
Cooling sourceArtificial lake
Combined cycle?Units 3, 4
Power generation
Nameplate capacity2.09 GWe
(1.07 GWe from coal)

History edit

Construction of Daniel 1 and 2, two coal-fired sub-critical drum type units began in April 1973. Twenty-six years later in May 1999, plant capacity was doubled with the addition of two gas-fired combined cycle units, designated Daniel 3 and 4.

The first 500 MW coal-fired, steam electric generating unit, Daniel 1, began commercial operation on Sept. 6, 1977. The second 500 MW coal-fired, steam electric generating unit, Daniel 2, began commercial operation on June 1, 1981.[1]

Daniel 3 and 4 began commercial operation between April and May 2001.[1]

Ownership edit

Mississippi Power and FPL jointly own and share operating costs of the Daniel 1 and 2 units.[2] FPL's share was originally owned by Gulf Power Company; a former sister company of Mississippi Power through Southern Company, Gulf Power was acquired by FPL's parent NextEra Energy in 2019, with the Gulf Power name retired and replaced with FPL's in 2022.

Daniel 3 and 4 are gas-fired combined cycle units. Each unit produces 500 MW of electricity, bringing the plant's total capacity to more than 2000 MW. Daniel 3 and 4 are solely operated and maintained by Mississippi Power.

Carbon sequestration demonstration edit

The facility is the site of a United States Department of Energy-sponsored carbon dioxide sequestration demonstration project intended to demonstrate CO2 storage in a deep saline aquifer, the Lower Tuscaloosa Formation. The project began in 2008, and more than 3,000 short tons (2,700 t) of CO2 were injected in October of that year.[4]

References edit

  1. ^ a b c "Existing Electric Generating Units in the United States, 2008" (Excel). Energy Information Administration, U.S. Department of Energy. 2008. Retrieved 2009-08-22.
  2. ^ a b "Generating Plants - About Us - Mississippi Power". www.mississippipower.com. Archived from the original on 2007-05-16.
  3. ^ Ten Largest Plants by Generation Capacity, 2008, U.S. Energy Information Administration
  4. ^ D.E. Riestenberg, G.J. Koperna, Jr., V.A. Kuuskraa, R. Esposito, K. Harrison, R. Berry, J. Sparks, and R. Rhudy (2009) CO2 Sequestration Permitting at the SECARB Mississippi Test Site, SPE Americas E&P Environmental and Safety Conference, 23–25 March 2009, San Antonio, Texas

External links edit