Parung Panjang railway station

Parung Panjang Station (PRP) is a railway station that is located in Parung Panjang, Bogor Regency, Indonesia. During the colonial era, this station was important due to the location that is midway between Merak Station and Jakarta Kota Station. Before, the station was the last station that has been upgraded to receive an electrified train. But now, the last station changed to Rangkasbitung Station. The station is located in front of Parung Panjang Market. The road in front of the station is a road from Curug, many commuter from Curug uses this station to go to Jakarta.

R12
Parung Panjang Station

Stasiun Parung Panjang
Parung Panjang Station platform, 2024
General information
LocationParung Panjang, Bogor Regency
West Java
Indonesia
Coordinates6°20′39″S 106°34′07″E / 6.3441538°S 106.5686595°E / -6.3441538; 106.5686595
Owned byKereta Api Indonesia
Operated byKAI Commuter
Line(s)
Platforms2 island platforms
1 side platform
Tracks4
Construction
Parking Available
Accessible Available
Other information
Station codePRP • 0207 • PARUNG[1]
ClassificationLarge class type B[1]
History
Opened1 October 1899 (1899-10-01)[2]
Electrified2009
Services
Preceding station Following station
Cicayur
towards Tanah Abang
Rangkasbitung Line Cilejit
Location
Parungpanjang Station is located in Bogor Regency
Parungpanjang Station
Parungpanjang Station
Location in Bogor Regency

Before functioning as a station that only served KRL Commuterline trips, this station had also served KRL and local train trips to Rangkasbitung Station and to Merak Station, and had also served express train trips such as the Krakatau Express train. On 1 April 2017, this local train service was finally removed and replaced by KRL Commuterline with the Tanah Abang–Rangkasbitung route, following the Krakatau Express train which was also removed on 17 July 2017. Parung Panjang Station is also a train station that uses new buildings on the Merak–Tanah Abang railway besides Maja, Kebayoran and Palmerah Stations.

History edit

To make the mobility of passengers from Batavia to Rangkasbitung to the Banten area smoother, in the 1890s, the Staatsspoorwegen company built a railroad line and its stations (including Parung Panjang Station) that connected the Duri Station to the Rangkasbitung area, passing through the Tanah Abang area. This project was completed in 1899, and immediately served by various regular trains serving the route.[3][4]

In the early 1990s, it was heard that a plan or master plan for the construction of the Jakarta Outer Ring Railway line was made by the Ministry of Transportation of the Republic of Indonesia from and to Parung Panjang Station, with the aim that freight trains would not enter the Special Capital Region of Jakarta area. This route plan connects Parung Panjang Station to Cikarang Station and also to Sungai Lagoa Station. However, due to the 1997 Asian financial crisis, the design of this route was halted in the middle of the project, so that the railway line that has been built only starts from Citayam Station to Nambo Station.[5] In the late 1990s, Parung Panjang Station was using old canopy taken from Angke Station. The use of this canopy did not last long, until it was finally dismantled during the revitalization of the station in 2015.[6]

In order to improve commuter rail services, the railway line between Serpong Station to Parung Panjang Station was also electrified in 2009, followed by Parung Panjang Station to Maja Station on 17 April 2013.[7]

Initially, the station had a total of 4 lines, with line 2 being a straight line. Line 3 which leads to Cicayur is also a straight track after double track line on the Serpong-Parung Panjang segment was operated on 17 April 2013, followed by line 3 which leads to Cilejit also becomes a straight track after a double track on the Parung Panjang–Maja segment operated on 17 December 2015.

A storage warehouse was built in the area near Parung Panjang Station, this warehouse is used as a place to store railway materials that are no longer used, such as train signals. In addition to the warehouses, new lines were also built on the emplacement of Parung Panjang Station which were used for loading and unloading and storage or stabling of the ballast train series, and these new lines were also used for the stabling of the KRL series.

To increase the occupancy of KRL Green Line passengers, in 2014-2016, the Ministry of Transportation of the Republic of Indonesia began to massively renovate Parung Panjang, Maja and Kebayoran Stations into 2 levels with modern and magnificent architecture and very complete facilities. On 11 May 2016, the construction of the three stations was completed and inaugurated by the Director General of Railways, Hermanto Dwiatmoko together with the Regent of Lebak, Iti Octavia Jayabaya, at Maja Station.[8]

Station layout edit

R12  
G Main building
P

Platform floor

Side platform
Line 1 (Cilejit)   Rangkasbitung Line to Rangkasbitung/Tigaraksa
Island platform
Line 2 (Cilejit)   Rangkasbitung Line to Rangkasbitung/Tigaraksa
Line 3   Rangkasbitung Line to Tanah Abang (Cicayur)
Island platform
Line 4   Rangkasbitung Line to Tanah Abang (Cicayur)

Services edit

The following is a list of train services at the Parung Panjang Station.

Supporting transportation edit

Type Route Destination
Angkot F83 (Bogor Regency) Parung Panjang–Griya[9]
A03 (Tangerang Regency) Parung Panjang–Bitung
KSS (South Tangerang City) Serpong Station–Gunung Sindur

Gallery edit

References edit

  1. ^ a b Buku Informasi Direktorat Jenderal Perkeretaapian 2014 (PDF) (in Indonesian). Archived from the original (PDF) on 1 January 2020.
  2. ^ Staatsspoorwegen (1921–1932). Verslag der Staatsspoor-en-Tramwegen in Nederlandsch-Indië 1921-1932 (in Dutch). Batavia: Burgerlijke Openbare Werken.
  3. ^ "Haltestempels Nederlands Indië: SS-WL". Studiegroep Zuid-West Pacific. Retrieved 15 March 2023.
  4. ^ Oegema, J.J.G. (1982). De Stoomtractie op Java en Sumatra. Antwerpen: Kluwer Technische Boeken B.V.
  5. ^ W, Kevin (4 April 2015). "Sejarah dan Drama di Balik Pengoperasian KRL Jalur Nambo". KAORI Nusantara (in Indonesian). Retrieved 15 March 2023.
  6. ^ Ballegoijen, Michiel van. Spoorwegstations Op Java.
  7. ^ "Jalur Ganda KRL Serpong-Parungpanjang Beroperasi". liputan6.com (in Indonesian). 16 September 2009. Retrieved 15 March 2023.
  8. ^ Sari, Nursita (11 May 2016). Ali, Fidel (ed.). "Menengok "Wajah Baru" Stasiun Parung Panjang". KOMPAS.com (in Indonesian). Retrieved 15 March 2023.
  9. ^ "Rute Angkot di Bogor". e-transportasi.com. Retrieved 15 March 2023.

External links edit

  Media related to Parung Panjang Station at Wikimedia Commons

Preceding station   Kereta Api Indonesia   Following station
Cilejit
towards Merak
  Merak–Tanah Abang   Cicayur
towards Tanah Abang

6°20′39″S 106°34′07″E / 6.3441538°S 106.5686595°E / -6.3441538; 106.5686595