Ohio Southern Railroad (1881–1898)

The Ohio Southern Railroad operated between Ironton, Ohio, and Lima, Ohio, from 1893 and 1905. Beginning in 1878 as the narrow gauge Springfield, Jackson and Pomeroy Railroad, it ran from Jackson-Wellston, Jackson County to Springfield, Ohio.[1][page needed] The line was converted to a standard gauge by 1880 and renamed the Ohio Southern Railroad in 1881.[1][page needed] From Jeffersonville, branch lines were started towards Columbus to the northeast and Cincinnati to the southwest, but never completed.[1][page needed] By September 1893, the Ohio Southern had reached north to Lima with a bridge over the Great Miami River at Quincy.[2][page needed] At Lima, the freight could link to the Lima Northern Railway for points further north. In 1898, the Lima Northern became the Detroit and Lima Northern Railroad (D&LN). Ohio Southern depots continue to stand in St. Johns, Uniopolis, Jackson Center, Quincy, and Rosewood.[2][page needed]

Map
Map

History edit

Planned as a narrow gauge railroad from the southeastern Ohio mineral lands connecting to Springfield, Fort Wayne and on to Chicago, the Ohio Southern Railroad never left the state of Ohio until it was taken over by the Detroit, Toledo & Ironton (DTI), serving the automobile industry in Detroit, Michigan.[3][page needed] Originating as the Springfield, Jackson & Pomeroy Railroad on December 17, 1874, as a means to link the three towns incorporated in its name.[3][page needed] The Dayton & South Eastern (D&SE) had been incorporated earlier to provide the same linkages, by a circuitous route, avoiding the large hills on a more direct alignment. The townspeople of Springfield did not wish to be a branch line, so joining with the other towns missed by the D&SE the SJ&P was born.[3][page needed]

Both lines were intended to be an outlet for the coal deposits of Jackson and Wellston. Construction began on the SJ&P from Jackson on December 7, 1876. The necessary $800,000 in capital had taken two years to raise. A second construction effort began on March 26, 1877, from Springfield.[3][page needed] Until July of that year, the line operated as two routes. In June of the following year a branch line to Eureka was completed. Numerous coal mine spurs were constructed.[3][page needed]

In 1879, the Springfield, Jackson & Pomeroy was sold at a sheriff's sale to Oliver S. Kelly. Kelly with a group of ten formed the Springfield Southern Railroad Co on November 3, 1879. The plan to extend the line to Rockwood in Lawrence County was never realized, but the SSR did convert the line to standard gauge. On May 23, 1881, the Spring Southern became the Ohio Southern Railroad Company.[3][page needed] The company began to make some money at this time. The Ohio Southern was leased by the Indiana, Bloomington & Western Railroad (IB&W), which was building east from Indianapolis to Springfield, and the Chesapeake & Ohio (C&O) building westward from Springfield. The IB&W later became the Peoria & Eastern. IB&W control of the Ohio Southern ended in April 1892.[3][page needed]

In December 1892, the OS began extending its mainline north from Springfield to Lima, creating a longer single haul roadway. It was completed in December 1893. In 1894, a spur was established to Wellston, plus several to coal mines. On May 9, 1895, the Ohio Southern was forced into receivership due to the financial strain caused by the Lima extension. A group of bondholders purchased the property on October 15, 1898. The Ohio Southern ceased to operate as an independent railroad.[3][page needed]

Extension to Ironton edit

On February 11, 1848, a Special Act of the Ohio General Assembly authorized the incorporation of the Iron Railroad Company, and during 1849-50 a six-mile line was built from Ironton to the Vesuvius Tunnel Mines. It was extended in 1853 to Center Station. By 1858, though, the structure spanning Sterrns Creek north of Ironton was considered too weak to carry increased loads and a wrought iron truss, patented by W. H. Moseley and fabricated in Cincinnati, was erected over the stream. This wrought-iron bridge remained in service until 1924, when it was removed and placed on exhibition in the Henry Ford Museum in Dearborn, Michigan, some years later.[3][page needed]

Cincinnati, Columbus & Hocking Valley Railroad. edit

From November 28, 1883, until May 31, 1884, the Ohio Southern operated a small railroad, the Cincinnati, Columbus & Hocking Valley. The CC&HV extended from Jeffersonville with the Ohio Southern west to Claysville Junction on the Little Miami Railroad's Cincinnati-Xenia main line. Organized on December 9, 1875, as the Waynesville, Port William & Jeffersonville Railroad Co. The owners were among group of ten involved with the Springfield, Jackson & Pomoroy.[3][page needed] The CC&HV completed 15 miles from Jeffersonville to Port William by October 1877, and the following month was reorganized as the Columbus, Washington & Cincinnati Railroad Co. By 1887, the W&C was abandoned and tracks removed. In March 1884, the Ohio Southern purchased a portion of the roadbed for a Cincinnati-Columbus line. Built from Sedalia through Jeffersonville and on to Kingman, the line was never finished and it was abandoned in several stages from 1931 and 1941.[3][page needed]

The Detroit & Lima Northern (D&LN) was planning a line from Columbus to Fort Wayne, Indiana, the Columbus Northwestern Railway, (CNW) incorporated in August 1897. The CNW constructed a small portion of a line Columbus Junction (later named Salter's) to Peoria in August 1898.[3][page needed] The Detroit & Lima Northern finished a link from Columbus Junction to St. Mary's by November 1 of that year. Then the D&LN leased from the Ohio Southern the Lima to Columbus Junction link to the CNW. The bondholders who had purchased the Ohio Southern in 1989 refused to renew this lease. On December 1, 1900, the D&LN ended its financial affiliation with the Columbus Northwestern and ended service into Columbus over the Toledo and Ohio Central Railway. The Columbus Northwestern later was to become a portion of the T&OC system.[3][page needed]

Merger edit

In 1901, the Ohio Southern Railway merged with the Detroit and Lima Northern Railway and formed the Detroit Southern Railroad. This company was purchased at foreclosure on May 1, 1905, by Harry B. Hollins & Company of New York, which reincorporated it in the state of Michigan under the name of the Detroit, Toledo and Ironton Railway.[4]

Stations edit

The Ohio Southern operated a single mainline in Ohio from Lima to Ironton. Stations included (from north to south):[5]

Lima to Springfield edit

Springfield to Washington C.H. edit

Washington C.H. to Greenfield edit

Greenfield to Jackson edit

Jackson to Lisman edit

Along SR 93

  • Jackson
  • unidentified
  • unidentified
  • unidentified

Lisman to Ironton edit

Along SR 93

References edit

  1. ^ a b c Camp, Mark J. (2008). Images of America, Railroad Depots of Central Ohio. Chicago, Illinois: Arcadia Publishing.
  2. ^ a b Camp, Mark J. (2006). Images of America, Railroad Depots of West Central Ohio. Chicago, Illinois: Arcadia Publishing.
  3. ^ a b c d e f g h i j k l m Pletz, William C. (1979). The History of the Detroit, Toledo & Ironton Railroad. Vol. Part II. Ann Arbor Train and Trolley Watchers.
  4. ^ Landrum, J.E. (January 7, 1998). "A Brief History of the DT&I". The Detroit, Toledo and Ironton Railroad Historical Web Site. {{cite web}}: Missing or empty |url= (help)[full citation needed]
  5. ^ Map showing the Ohio Southern R.R. and its connections through the Cincinnati, Sandusky & Cleveland and Indiana, Bloomington & Western Railroads; Library of Congress; Washington, D.C.; 1902