Open main menu

List of Caracas Metro stations

Map of the Caracas Metro, with current and future or under construction lines and stations (November 2016).

The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela. As of 2015, including Los Teques Metro, the Caracas Metro is made up of 47 stations.[1]

Below is a list of the Caracas Metro metro lines and the stations that they serve.

Line 1 (Red)Edit

Metro Caracas Line 1 Route
Caracas Metro  
 
Propatria terminus (West)
 
Pérez Bonalde
 
Plaza Sucre
 
Gato Negro
 
 
Agua Salud to Line 6
 
Caño Amarillo
 
 
Capitolio
 
to Line 2 (via El Silencio)
 
 
La Hoyada to BusCaracas
 
Parque Carabobo
 
Bellas Artes
 
Colegio de Ingenieros
 
 
 
Plaza Venezuela
 
to Line 3 and (via Zona Rental) Line 4
 
Sabana Grande
 
Chacaíto
 
Chacao
 
Altamira
 
 
Miranda
 
to Line 4
 
 
Los Dos Caminos to Line 6
 
Los Cortijos
 
La California
 
 
 
Petare
 
to Cabletren Bolivariano
 
and MetroCable Petare Sur
 
 
 
Palo Verde terminus (East)
to MetroCable Mariche
and MetroCable La Dolorita

From west to east:

Line 2 (Green)Edit

Metro Caracas Line 2 Route
Caracas Metro  
 
 
El Silencio terminus (North)
 
to Line 1 (via Capitolio)
 
 
Capuchinos to Line 4
 
Maternidad
 
Artigas
 
La Paz
 
La Yaguara
 
 
Carapita
 
to MetroCable Antímano
 
 
Antímano
 
Mamera
 
 
 
 
Caricuao
 
 
 
Zoológico terminus (East)
 
to Line 3
 
Ruiz Pineda
 
 
Las Adjuntas terminus (South)
to Los Teques Metro

Line 2 operates on much of the same route that Line 4 does. From north-east to south-west its stations are:

Line 3 (Blue)Edit

Metro Caracas Line 3 Route
Caracas Metro  
 
 
 
Plaza Venezuela terminus (North)
 
to Line 1 and (via Zona Rental) Line 4
 
Ciudad Universitaria
 
Los Símbolos
 
 
La Bandera to BusCaracas
 
El Valle
 
Los Jardines
 
Coche
 
Mercado
 
 
 
 
La Rinconada terminus (South)
to Line 2,
Los Teques Metro (via Panamericana)
and Cúa railway (via Caracas)

From north-east to south-west:

Next phase (project). Begins as a west ramification from El Valle station to north on San José station

  • El Valle
  • Prado de María
  • El Peaje
  • San Agustín
  • Fuerzas Armadas – Point of transfer to Line 1 and Line 4
  • Urdaneta
  • San José

Line 4 (Yellow)Edit

Metro Caracas Line 4 Route
Caracas Metro  
 
 
 
Zona Rental terminus (East)
 
to Line 1 and Line 3
 
(via Plaza Venezuela)
 
 
Parque Central
 
to MetroCable San Agustín
 
 
Nuevo Circo to BusCaracas
 
Teatros
 
 
Capuchinos terminus (West)
to Line 2

Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Line 4 was operates on much of the same route that Line 2 does.

From east to west:

Line 5 (Purple)Edit

This line is still under construction.

First phase – from west to east:

  • Bello Monte
  • Las Mercedes
  • Tamanaco – Future point of transfer to Line 5
  • Chuao
  • Bello Campo
  • Miranda/Hugo Chávez (formerly: Parque del Este II) – Point of transfer to Line 1

The following stations found in the City of Caracas are under construction, as part of the project known as the Guarenas / Guatire Metro:

  • Miranda/Hugo Chávez (formerly: Parque del Este II) – Point of transfer to Line 1
  • Montecristo
  • Boleíta
  • El Marqués
  • Warairarepano – Point of transfer to the Guarenas / Guatire (light rail) line

Line 6 (Orange)Edit

Most of this line is still in planning. It will connect Line 2 and Line 3.

Los Teques Metro (Cyan)Edit

  • Las Adjuntas – transfer station to Caracas Metro Line 2
  • Alí Primera (formerly: El Tambor)
  • Guiacaipuro
  • Independencia

The following stations are under construction:

  • Los Cerritos – projected completion date set for 2012[needs update]
  • Carrizal – projected completion date set for 2012[needs update]
  • Las Minas – projected completion date set for 2012[needs update]
  • San Antonio – projected completion date set for 2012[needs update]

Guarenas / Guatire (Teal)Edit

This is a light rail line. The following stations are under construction, as part of the project known as the Guarenas / Guatire Metro:

  • Warairarepano – Point of transfer to line Line 5
  • Caucaugüita – projected completion date set for 2012[needs update]
  • Belén – planned future station
  • Guarenas I – projected completion date set for 2012[needs update]
  • Guarenas II – projected completion date set for 2012[needs update]
  • Guatire I – projected completion date set for 2012[needs update]
  • Guatire II – projected completion date set for 2012[needs update]

ReferencesEdit

  1. ^ "Mapa de Líneas y Rutas Red Metro" [Map of Lines and Routes of the Metro Network] (in Spanish). C.A. Metro de Caracas. Archived from the original on 2014-07-16. Retrieved 2015-05-24.

External linksEdit