Line 6 (Hangzhou Metro)

Line 6 (Chinese: 杭州地铁6号线) is a partially operational subway line of the Hangzhou Metro. The line runs from Shuangpu (in Xihu District) and West Guihua Road (in Fuyang District), merging at Xiangshan Campus, China Academy of Art station, stretching through the south bank of Qiantang River before turning northwest and ending at Goujulong. It connects Fuyang District with Binjiang District, Hangzhou Olympic Sports Expo Center, Qianjiang Century City and Hangzhou East Railway Station. The line is 58.75 km (36.51 mi) long.

Line 6
 6 
Train of Line 6 is departing from Olympic Sports Center station
Overview
StatusPartially operational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations36
Service
TypeRapid transit
SystemHangzhou Metro
Services2
Operator(s)Hangzhou Metro Corporation
Depot(s)Shuangpu Depot
Fengbei Stabling Yard
Songjiatang Depot
Rolling stock6 cars, type AH
History
Opened30 December 2020; 3 years ago (2020-12-30)
Technical
Line length58.5 km (36.4 mi) (Phase 1: 27.0 km, Phase 2: 8.3 km, Fuyang: 23.2 km)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed100 km/h (62 mph)
Route map

Future north extension
33
Goujulong
32
East Railway Station (East Square)
 19 
31
Yuanbaotang
30
Tanhua'an Road
29
Sanbao
 9 
28
Asian Games Village
Fengbei Stabling Yard
27
Fengbei
Left arrow Liangzhu – Chaoyang Right arrow
26
Qianjiang Century City
 2 
25
Expo Center
24
Olympic Sports Center
 7 
23
Xingmin
22
Jiangling Road
 1 
21
Jianghan Road
20
Changhe
 5 
19
Jianye Road
18
Chengye Road
17
Weiye Road
16
Zhejiang Chinese Medical University
 4 
Line 4 interconnection
15
Xipu Road
14
Zhipu Road
13
West Fenghua Road
Line 12 in the future
12
Xiangshan Campus, China Academy of Art
b3
Xiaming Street
b2
Kehai Road
b1
Shuangpu
Shuangpu Depot
11
Zhejiang Conservatory of Music
10
Zhongcun
district
Xihu
Fuyang
9
East Safari Park
8
Yinhu
7
Huxiaoxing
6
Shouxiang
Songjiatang Depot
5
Fuyang Coach Center
4
Gaoqiao
3
Yangbeihu
2
Gongwang Street
1
West Guihua Road
Line 6
Simplified Chinese杭州地铁六号线
Traditional Chinese杭州地鐵六號線
Line 6 drawn to scale.

Phase 1 and Fuyang Section was opened on 30 December 2020. Phase 2 opened on 6 November 2021.[1] The line's color is blue. In future planning, the stations from Shuangpu to Xiaming Street will merge to Line 12.

Opening timeline edit

Segment Commencement Length Station(s) Name
Shuangpu — Qianjiang Century City 30 December 2020; 3 years ago (2020-12-30) 26.95km 17 Phase 1
Xiangshan Campus, CAA — West Guihua Road 23.47km 11 Fuyang Section (former Fuyang Line)
Zhipu Road 29 April 2021; 2 years ago (2021-04-29) Infill station 1
Qianjiang Century City — Goujulong 6 November 2021; 2 years ago (2021-11-06)[1] 8.4 km[2] 5 Phase 2[1]
Asian Games Village and Fengbei 21 February 2023; 14 months ago (2023-02-21)[3] Infill station 2

Stations edit

Legend

  - Operational
  - Under construction

Service

Routes

Station name Connections Date opened Location Section
English Chinese
Goujulong 枸桔弄 6 November 2021[1] Shangcheng Phase 2
East Railway Station (East Square) 火车东站(东广场)   HGH
 1   4   19  (East Railway Station)
Yuanbaotang 元宝塘
Tanhua'an Road 昙花庵路
Sanbao 三堡  9 
Asian Games Village 亚运村 21 February 2023 Xiaoshan
Fengbei 丰北 Phase 1
Qianjiang Century City 钱江世纪城  2  30 December 2020
Expo Center 博览中心
Olympic Sports Center 奥体中心  7  Xiaoshan/

Binjiang

Xingmin 星民 Binjiang
Jiangling Road 江陵路  1 
Jianghan Road 江汉路
Changhe 长河  5 
Jianye Road 建业路
Chengye Road 诚业路
Weiye Road 伟业路
Zhejiang Chinese Medical University 中医药大学  4 
Xipu Road 西浦路
Zhijiang Cultural Center[note 1] 之江文化中心 29 April 2021 Xihu
West Fenghua Road 枫桦西路 30 December 2020
Xiangshan Campus, China Academy of Art 美院象山
| Zhejiang Conservatory of Music 音乐学院 Fuyang Section
| Zhongcun 中村
| East Safari Park 野生动物园东 Fuyang
| Yinhu 银湖
| Huxiaoxing 虎啸杏
| Shouxiang 受降
| Fuyang Coach Center 富阳客运中心
| Gaoqiao 高桥
| Yangbeihu 阳陂湖
| Gongwang Street 公望街
| West Guihua Road 桂花西路
Xiaming Street 霞鸣街 30 December 2020 Xihu Phase 1
Kehai Road 科海路
Shuangpu 双浦
  1. ^ Was Zhipu Road until 1 February 2024

See also edit

References edit

  1. ^ a b c d "来了!6号线二期明天开通,"证件照"抢先看". 2021-11-05. Archived from the original on 2021-11-05.
  2. ^ "火车东站将迎来四地铁时代!地铁6号线二期开通在即,暂时无法与1、4号线站内换乘". 2021-10-22.
  3. ^ "杭州地铁文三路站、丰北站、亚运村站明日开通!出行信息提前掌握-杭州新闻中心-杭州网". hznews.hangzhou.com.cn. Retrieved 2023-02-20.