Line 10 (Chongqing Rail Transit)

Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1]

Line 10
 10 
Sanyawan Station Line 10.jpg
Sanyawan Station platform
Overview
Native name重庆轨道交通10号线
TypeRapid transit
SystemChongqing Rail Transit
StatusOperational
LocaleChongqing, China
TerminiWangjiazhuang
Liyuchi
Stations19
Line number10
Operation
Opened28 December 2017; 2 years ago (2017-12-28)
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Technical
Line length34 km (21 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
Electrification1500 V DC Overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Lanhua Rd
Lanhua Road Depot
Left arrow (ACW) Loop line (CW) Right arrow
Nanhu
 Loop 
Wanshou Rd
Nanping
Bus interchange  3 
Nanbin Rd
Qixinggang
 1 
Auditorium
Zengjiayan
 2 
Liyuchi
 9 
Hongtudi
 6 
Longtousi Park
S Square of Chongqing
N Railway Station
Chongqing North Railway Station  Loop   3 
N Square of Chongqing
N Railway Station
Bus interchange  4 
Minxinjiayuan
Sanyawan
Shangwan Rd
 9 
Huanshan Park
Changhe
Zhujiawan Depot
Terminal 3 of
Jiangbei Airport
Jiangbei Airport
Terminal 2 of
Jiangbei Airport
Jiangbei Airport Bus interchange  3 
Yubei Square
Lushan
Central Park E
 9 
Central Park
Central Park W
 5 
Yuelai
 6I 
Wangjiazhuang Depot
Wangjiazhuang
 6I 

Opening timelineEdit

Segment Commencement Length Station(s) Name
Wangjiazhuang — Liyuchi 28 December 2017 33.7 km (20.94 mi) 18 Phase 1
S. Square of Chongqing N. Railway Station 28 December 2018 infill station 1

Stations (north to south)Edit

Phase IEdit

Station
Station name Connections Distance
km
Location
English Chinese
10/27 Wangjiazhuang 王家庄  6I  Yubei
10/26 Yuelai 悦来  6I  2.04 2.04
10/25 Central Park West 中央公园西  5  2.71 4.75
10/24 Central Park 中央公园 1.09 5.84
10/23 Central Park East 中央公园东  9  0.82 6.66
10/22 Lushan 鹿山 1.64 8.30
10/21 Yubei Square 渝北广场 2.05 10.35
10/20 Terminal 2 of Jiangbei Airport 江北机场T2航站楼  3    CKG 0.74 11.09
10/19 Terminal 3 of Jiangbei Airport 江北机场T3航站楼   CKG 2.22 13.31
10/18 Changhe 长河 5.31 18.62
10/17 Huanshan Park 环山公园 1.85 20.47
10/16 Shangwanlu 上湾路  9  1.67 22.14
10/15 Sanyawan 三亚湾 2.74 24.88
10/14 Minxinjiayuan 民心佳园 2.08 26.96
10/13 N Square of Chongqing N Railway Station 重庆北站北广场  4   YW    CUW 2.61 29.57
10/12 S Square of Chongqing N Railway Station 重庆北站南广场  3   Loop   YW    CUW 0.60 30.17
10/11 Longtousi Park 龙头寺公园 0.87 31.04
10/10 Hongtudi 红土地  6  1.63 32.67 Jiangbei
10/09 Liyuchi 鲤鱼池  9  1.09 33.76

Phase IIEdit

  • Under construction
Station
Station name Connections Distance
km
Location
English Chinese
10/08 Zengjiayan 曾家岩  2  Yuzhong
10/07 Auditorium 大礼堂
10/06 Qixinggang 七星岗  1 
10/05 Nanbinlu 南滨路 Nan'an
10/04 Nanping 南坪  3 
10/03 Wanshoulu 万寿路
10/02 Nanhu 南湖  Loop 
10/01 Lanhualu 兰花路

ReferencesEdit

  1. ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.