Interstate 687 (I-687) was a proposed auxiliary Interstate Highway in the Capital District region of New York in the United States. The highway would have connected I-90 in to I-87 and Albany International Airport in Colonie. I-687 faced opposition from those living in the path of the highway, and ultimately all that was built of the highway was its interchange with I-90 in Albany, which now connects to a surface road, Corporate Woods Boulevard. The project was canceled in 1973, and I-687 was removed from the Interstate Highway System four years later. A small portion of what would have been I-687 is now used as a connector between the Adirondack Northway and Albany International Airport; it, however, does not have a route designation and was completed as its own separate project in November 2019.[4]

Interstate 687 marker

Interstate 687

Albany Airport Connector
Map
Proposed I-687 corridor highlighted in red
Route information
Auxiliary route of I-87
Length9.10 mi[1] (14.65 km)
HistoryProposed in 1950s;[2] canceled in 1973[3]
NHSEntire route
Major junctions
West end I-90 / New York Thruway in Colonie
Major intersections
East end I-90 in Albany
Location
CountryUnited States
StateNew York
CountiesAlbany
Highway system
I-684 I-690

Route description edit

 
Onramps onto I-90 at exit 5A in Colonie. This would have been the eastern terminus of I-687.

I-687 was to begin between exits 24 and 25 on the New York State Thruway. It would continue north to a diamond intersection with New York State Route 5 (NY 5; Central Avenue). It would then proceed north and east to an exit with NY 155, and farther to an interchange with I-88, via a connector running on the west side of the airport. I-687 would then have an entrance to Albany International Airport, the main reason for its existence. Continuing east, I-687 would then have a cloverleaf interchange with I-87 (Adirondack Northway). Continuing east, I-687 would enter an interchange with a proposed northward extension of NY 85 (Crosstown Arterial), serving as the northern terminus of NY 85. The highway would then curve southeast into a diamond interchange with Osborne Road. After one final interchange with Everett Road, I-687 would end at exit 5A on I-90, now not associated with the thruway. This would also include an entrance and exit to North Manning Boulevard, for direct access to downtown Albany.[5][2] The highway would have been 9.10 miles (14.65 km) long.[1]

History edit

The initial plans for the Capital District's portion of the Interstate Highway System were drawn up in the late 1950s. One of the highways proposed at this time was I-687, also known as the "Northway Connection". When the Adirondack Northway (I-87) was completed through Colonie in 1960, a gap was left in I-87's exit numbering system for an interchange with I-687. The exits with NY 5 (Central Avenue) and Albany Shaker Road were designated as exits 2 and 4, respectively, leaving exit 3 for I-687. No such gap was left on the toll-free section of I-90, where the I-687 exit was numbered exit 5A.[2]

The construction of I-687 would have forced hundreds of households from their homes, most of which are located off of Albany Shaker Road (NY 155 east of I-87). By way of comparison, today's Crossing Park in Colonie would have been directly in the path of the highway. As such, the project faced opposition from residents of the town of Colonie.[5] The construction of the road was started despite the controversy surrounding it, and the interchange with I-90 was completed c. 1972.[6] Construction was halted soon afterward, however, as state and federal funds were diverted away from the project.[2] I-687 and the proposed northward extension of the Crosstown Arterial (NY 85) were both canceled by the state of New York in late September 1973, at which time the New York State Department of Transportation (NYSDOT) requested that I-687 be removed from the Interstate Highway System.[3] The request was granted in 1977.[2]

I-90 exit 5A, the only part of the project that was ever constructed, was left as an interchange to nowhere for roughly a decade. The North Manning Boulevard connection was never built.[7] In the early 1980s, the large, freeway-standard trumpet interchange was linked up with Corporate Woods Boulevard, a local, two-lane street leading to an office park located just north of I-90 on Albany Shaker Road.[8][9] NYSDOT reconfigured the exit 4 and 5 ramps, which helped relieve traffic congestion in this area. On July 9, 2019, it was announced that the new airport connector will become exit 3. Exit 3 gives access to Albany International Airport, exit 4 gives access to Wolf Road, and the exit 5 ramp southbound was realigned to meet directly with I-87, instead of through the conjoined frontage road. Exit 4 will be relocated and will become an access exit to Albany Shaker Road and Albany International Airport.

Current form edit

While the idea for I-687 is basically dead as of the end of 2019 with only an interchange to nowhere at exit 5A on I-90 built, a new exit 3 flyover ramp from I-87 (Adirondack Northway) to NY 155 (Albany Shaker Road) called the Albany Airport Connector is currently in use where I-687 would have been built, providing an easier connection between I-87 and the airport. The connector was completed in November 2019.[10]

Exit list edit

Current edit

The entire route is in Colonie, Albany County. All exits are unnumbered.

mikmDestinationsNotes
0.000.00   NY 155 (Albany Shaker Road) – Albany International Airport, ColonieAt-grade intersection
0.400.64  I-87 – New York City, MontrealExit 3 on I-87 (Adirondack Northway);[11] construction started December 2018; completed November 2019
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Original proposal edit

The original proposal would have had the ten following exits. The entire route is in Albany County.

LocationmikmExitDestinationsNotes
Colonie0.00.0   
 
 
I-90 / New York Thruway to I-88 west – Boston, Buffalo
Western terminus; proposed exit 25 on the Thruway
1.602.571  NY 5 (Central Avenue) – Colonie, Schenectady
2.54.02  NY 155 (New Karner Road) – Colonie
4.36.93   I-88 / NY 7 – Troy, Binghamton, Bennington, VTConnector to proposed extension of I-88 along NY 7
4.87.74   NY 155 (Albany Shaker Road) – Albany International Airport, ColonieProposed expanded entrance to the airport
5.79.25  I-87 (Adirondack Northway) – New York City, MontrealWould be signed as exits 5A (south) and 5B (north); proposed exit 3 on I-87
5.89.36  Wolf Road to NY 155ColonieWestbound exit and eastbound entrance
6.610.67  NY 85 (Crosstown Arterial) – Slingerlands, New Scotland, New SalemConnection to proposed extension of NY 85
7.512.18Osborne Road – Colonie
8.313.49Everett Road – Colonie
Albany9.114.610North Manning Boulevard – Downtown AlbanyWould have been part of I-90 interchange
  I-90 – Boston, BuffaloProposed exit 5A on I-90
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also edit

References edit

  1. ^ a b Faber, Harold (September 30, 1973). "85% of Interstate Roads in State Complete at a Cost of $2.5-Billion". The New York Times. p. 26.
  2. ^ a b c d e "History". Adirondack Northway Exit 3 Project. New York State Department of Transportation. Archived from the original on September 29, 2012. Retrieved June 11, 2010.
  3. ^ a b "State Bids U.S. Delete Interstate 687 Approval". Schenectady Gazette. October 15, 1973. p. 26. Archived from the original on March 5, 2022. Retrieved August 27, 2010 – via Google News Archive.
  4. ^ "Governor Cuomo Announces 50 Million Albany Airport Connector Project" (Press release). New York Governor's Press Office. December 3, 2018. Archived from the original on December 4, 2018. Retrieved December 3, 2018.
  5. ^ a b Jordan, Christopher (2006). "Interstate 687". Capital Highways. Archived from the original on December 17, 2010. Retrieved June 11, 2010.
  6. ^ "NY State Highway Bridge Data – Albany County" (PDF). New York State Department of Transportation. May 31, 2010. p. 2. Archived (PDF) from the original on September 20, 2012. Retrieved June 11, 2010.
  7. ^ Albany Quadrangle – New York (Map). 1:24,000. 7.5 Minute Series (Topographic). United States Geological Survey. 1980. Archived from the original on January 9, 2014. Retrieved June 11, 2010.
  8. ^ I Love New York Tourism Map (Map). Cartography by Rand McNally and Company. State of New York. 1981.
  9. ^ New York (Map). Rand McNally and Company. 1985. ISBN 0-528-91040-X.
  10. ^ "Governor Cuomo Announces $50 Million Albany Airport Connector Project Awarded". Albany, New York. State of New York. December 3, 2018. Archived from the original on December 4, 2018. Retrieved December 3, 2018.
  11. ^ "New Exit 3 at Albany International Airport". YouTube. Archived from the original on December 15, 2021.