German submarine U-31 (S181)

U-31 (S181) is a Type 212A submarine of the German Navy, and the lead ship of her class.

History
Germany
NameU-31
Builder
Launched20 March 2002
Commissioned19 October 2005
Statusin service.
Class and typeType 212A
General characteristics
Class and typeType 212
Typesubmarine
Displacement
  • 1,450 tonnes (1,430 long tons) surfaced
  • 1,830 tonnes (1,800 long tons) submerged
Length
  • 56 m (183.7 ft)
  • 57.2 m (187.66 ft) (2nd batch)
Beam7 m (22.96 ft)
Draft6 m (19.68 ft)
Installed power1 x MTU-396 16V (2,150 kW); 1 x Siemens Permasyn electric motor Type FR6439-3900KW (2,850 kW)
Propulsion
Speed20 knots (37 km/h) submerged, 12 knots surfaced[5]
Range
  • 8,000 nmi (14,800 km, or 9,196 miles) at 8 knots (15 km/h) surfaced
  • 3 weeks without snorkeling, 12 weeks overall
EnduranceSurface 14,800 km at 15 km/h, Subsurface 780 km at 15 km/h, 3,000 nmi at 4 kn,
Test depthover 700 m (2,296 ft)[3]
Complement5 officers, 22 men
Sensors and
processing systems
CSU 90 (DBQS-40FTC), Sonar: ISUS90-20, Radar: Kelvin Hughes Type 1007 I-band nav.,
Electronic warfare
& decoys
EADS FL 1800U suite
Armament6 x 533 mm torpedo tubes (in 2 forward pointing groups of 3) with 13[4] DM2A4, A184 Mod.3, Black Shark Torpedo, IDAS missiles and 24 external naval mines (optional)

U-31 was built by TKMS, with construction taking place at the shipyards of Thyssen Nordseewerke of Emden and Howaldtswerke at Kiel. Launched on 20 March 2002, U-31 was commissioned alongside her sister ship U-32 by German Minister of Defence Peter Struck in Eckernförde on 19 October 2005. U-31 is propelled by one diesel engine and an electric motor driven by nine fuel cells, making the submarine virtually undetectable.

Korvettenkapitän Bert Petzold is[when?] the submarine's commanding officer.[citation needed]

History edit

U-31 was built in two sections, the stern and propulsion by Nordseewerke, Emden and the bow at Howaldtswerke-Deutsche Werft, Kiel. The boats of the Type 212A class cost around 500 million euros to build. Equipped with fuel cell technology and stealth skin, they are almost undetectable, and are able to remain submerged for up to three weeks. The fuel cells are virtually emission free, with the exception of distilled water, resulting in less noise, heat and exhaust fumes.

U-31 and U-32 were commissioned in a joint ceremony at Eckernförde on 19 October 2005 by Defence Minister Peter Struck, in the presence of the Inspector of the Navy Vice- Admiral Wolfgang E. Nolting. They and their sister ships are stationed in Eckernförde and form part of the 1st Ubootgeschwader (1st Submarine Squadron) in Einsatzflottille 1.

References edit

  • Rössler, Eberhard (2004). Die neuen deutschen U-Boote (in German). Bonn: Bernard & Graefe Verlag. ISBN 3-7637-6258-2.
  • "Uboot Klasse 212 A" (in German). German Navy. 15 July 2010.
Specific
  1. ^ "MTU 16V 396 diesel engine". Archived from the original on 2006-12-06. Retrieved 2006-10-08.
  2. ^ Holger Naaf: Die Brennstoffzelle auf U 212 A (PDF, German). Bundesanstalt für Wasserbau, Wehrtechnische Dienststelle für Schiffe und Marinewaffen Eckernförde, 23. September 2008.
  3. ^ "Deutsche Marine TV-Interview" (in German). Retrieved 2007-04-17.
  4. ^ "Dette er ubåtsjefens våte drøm - nyheter". Dagbladet.no. 2010-11-18. Retrieved 2011-12-27.
  5. ^ "Uboote Klasse 212A". Retrieved 2013-08-19.

External links edit