File:Audenshaw Metrolink Stop, David Dixon, geograph, 3692324.jpg

Original file(800 × 601 pixels, file size: 446 KB, MIME type: image/jpeg)

Description
English: Audenshaw Metrolink Stop:

Phase 3b of the Metrolink East Manchester Extension opened between Droylsden and Ashton–Under-Lyne on Wednesday, 9 October 2013. The new extension added a further 2.1 miles and 4 new stops to the route.

Here, Bombardier M5000 tram number 3001 is at the outward (Ashton) bound platform of the Audenshaw stop which is off–road, just to the east of Lumb Lane and south of Droylsden Road in the gyratory road layout. It has an island platform with ramps down to track level pedestrian crossings at both ends.
Date
Source geograph.org.uk
Author David Dixon
Permission
(Reusing this file)
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: David Dixon
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
Attribution
(required by the license)
InfoField
David Dixon / Audenshaw Metrolink Stop / 
David Dixon / Audenshaw Metrolink Stop
Camera location53° 28′ 42″ N, 2° 07′ 50″ W  Heading=270° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 28′ 42″ N, 2° 07′ 53″ W  Heading=270° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

9 October 2013

53°28'42.02"N, 2°7'49.80"W

heading: 270 degree

53°28'42.02"N, 2°7'53.04"W

heading: 270 degree

image/jpeg

194b6fd396e636a5cc43bf4ca925d5dd59a91e9f

457,212 byte

601 pixel

800 pixel

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:01, 3 January 2017Thumbnail for version as of 18:01, 3 January 2017800 × 601 (446 KB)G-13114{{Information |description={{en|1= Audenshaw Metrolink Stop: Phase 3b of the Metrolink East Manchester Extension opened between Droylsden and Ashton–Under-Lyne on Wednesday, 9 October 2013. The new extension added a further 2.1 miles and 4 new stops...
The following pages on the English Wikipedia use this file (pages on other projects are not listed):

Metadata