Abidjan-Ouagadougou railway

(Redirected from Abidjan-Niger Railway)

The Abidjan-Niger Railway is a 1,260-kilometre (780-mile) single-track metre gauge line in francophone West Africa that links Abidjan, the economic capital of Ivory Coast to Ouagadougou, the capital of Burkina Faso.[1] The railway, like others on the continent, was constructed by the colonial power to encourage economic development in the region, although detractors would claim that it was to exploit the region solely for their own advantage.

Abidjan-Ouagadougou Railway
A Sitarail train
Ouagadougou Station in 2013

Although the railway was once the predominant transporter of passengers in the region, by 2000 it was facing strong competition from road transport. Now, the railway's main role is servicing international freight traffic (petroleum products, containers, fertilizers, grain, clinker, cement, cotton etc) to and from Burkina Faso and the north of Côte d'Ivoire.

As of 2024, there is no passenger traffic anymore.

Communities served edit

A passenger train still runs three times a week, on Tuesdays, Thursdays and Saturdays. The journey has been reported to take from 36 to 48 hours.[2][3] The passenger train serves the following stations:

Côte d'Ivoire edit

Burkina Faso edit

Construction edit

Numerous proposals for establishing railways in the colony of Côte d'Ivoire were made in the 19th century by the French army officers Jean-Baptiste Marchand and Charles Houdaille.[12] In 1889, the colonial authorities undertook a geographic and ethnographic survey, called la mission Houdaille, to establish whether it would be feasible for a railway to penetrate the interior.[13] This led to Abidjan being chosen as the starting point for a line heading north to the “Baoulé country” in 1903.[14]

Building began in 1904[15] under the direction of Captain Crosson-Duplessis. The railway reached its first stations, Abgoville and Dimbokro, in 1907 and 1908 respectively. In 1909, the Abé people revolted against the colony's practice of conscripting forced labour, a common practice throughout French West Africa at that time.[16] The railway reached Bouaké in 1912, 315 kilometers north of Abidjan but construction was then suspended because of the First World War.[17]

Work resumed in 1920, with the new project to extend the line into the new colony of Upper Volta (present Burkina Faso). Katiola was reached in 1924, Ferkessedougou in 1929 and Bobo-Dioulasso in 1934. Work was then halted in the north to resume work on the southern section from Abidjan to Agboville, but was suspended again by the Second World War. The line finally reached Ouagadougou in 1954.

An extension to Kaya was completed in 1985,[18] with the aim of eventually reaching the manganese deposits in Tambao in the extreme north.[17][19]

To a certain extent, the new railway helped to develop the region, with towns along the line becoming new administrative and economic centres. In the early twentieth century, the road network was very limited even in the south, so all local produce - for example kola, palm oil, leather, maize and cotton - was channeled through the railway stations. However, local hubs such as Abgoville and Dimbokro declined in 1950s as road networks improved.

Recent history edit

State ownership edit

Following independence in 1960, the Abidjan-Ouagadougou railway was managed and operated by the Régie des chemins de fer Abidjan-Niger (RAN), a public enterprise jointly owned by Côte d'Ivoire and Upper Volta. RAN, which was financially viable until the mid 1970s, prioritised public transport, with 2.6 million passengers in 1967, 4 million in 1978 and 3.8 million in 1979. This policy allowed local people to engage in commercial activities over a far wider area for the first time.

However, from the mid 1970s, operational and financial performance declined because of inadequate funding, bad management and increasing road competition. By the 1980s, RAN was facing critical financial difficulties, and in 1989 it split into two separate state-owned companies, the Société Ivoirienne des Chemins de Fer (SICF) and the Société des Chemins de Fer du Burkina (SCFB). This separation only exacerbated the inefficiencies and led to an even greater shift to road transport.

Privatization edit

Faced with this crisis, and under pressure from the IMF and the World Bank, the two governments handed over the management of the entire line to the "Sitarail" consortium, an Ivorian private operator.[20] Originally, the state-owned corporations, newly renamed the Société Ivoirienne de Patrimoine Ferroviaire (SIPF) and the Société de Gestion du Patrimoine Ferroviaire du Burkina (SOPAFERB) administered railway infrastructure while the state still owned the real estate. They also owned all rolling stock which they leased to Sitarail. These companies were eventually liquidated and Sitarail commenced its first year of operation in 1995. Sitirail rehired only 1815 staff out of a total workforce of 3470.

Sitarail is technically and financially responsible for (a) the operation of freight and passenger services; (b) the maintenance (and in part the renewal) of rail infrastructure (track, structures, buildings, signaling, and telecommunications equipment); and (c) the current management of the real estate. Sitarail placed a new emphasis on the transportation of merchandise, which increased in value from 22 to 27 million CFA francs between 2006 and 2009. Of the 66 original railway stations, only 8 were retained.

Traffic supervision is currently managed by the Bollore Group.[19][21][22]

Current and future plans edit

Because of extensive track degradation and outdated rolling stock, the Ivorian and Burkinabe governments have drawn up various plans to renovate and improve the railway line:

In 2013, a plan to renovate the railway, with the aim of preserving and developing the rail transportation of goods and people between the two countries in satisfactory conditions of safety and comfort.[23] The project involved renovating at least 50% of the rails at curves, and any weak tracks on straight sections; improving track maintenance efficiency; ensuring the continuous availability and safety of the track; and identifying the speed of trains.

In 2014, a plan to extend the line from Ouagadougou to Tambao, a lucrative manganese mine in the far north east of Burkina Faso. The plan was made in conjunction with the French transportation company Bolloré[24] and the international mining and engineering company Pan African Minerals[25][26]

In 2017, a signed agreement to renovate the line.[27]

The original plan to create a rail loop that would also encompass Niamey, Cotonou and Lomé has not yet materialised.[21]

References edit

  1. ^ Briggita, Michelle, and Budin Karim Jacques. "The Abidjan-Ouagadougou Railway Concession." The Abidjan-Ouagadougou Railway Concession. World Bank, Aug. 1999. Web. 12 Dec. 2014. < http://siteresources.worldbank.org/INTFINDINGS/685507-1161268713892/21098659/find140.htm>
  2. ^ Planet, Lonely. "Thorn Tree - Rail Travel Trip Report". www.lonelyplanet.com.
  3. ^ "Rail transport in Burkina Faso". May 12, 2020 – via Wikipedia.
  4. ^ Retour à Abidjan du train test
  5. ^ Rives coloniales: architectures, de Saint-Louis à Douala, Jacques Soulillou,Françoise Doutreuwe Salvaing
  6. ^ Côte d'Ivoire, Élodie Vermeil,Dominique Auzias,Jean-Paul Labourdette
  7. ^ Abidjan-Ouagadougou: La longue traversée d’un train essoufflé
  8. ^ Le chemin de fer en Afrique, Jean-Louis Chaléard, Chantal Chanson-Jabeur, Chantal Béranger
  9. ^ Achèvement du chemin de fer de la Guinée française, Maurice Zimmermann, Annales de Géographie, 1910
  10. ^ N ZI 6 EME TRAVEE
  11. ^ "Côte d'Ivoire / Culture: Le pont ferroviaire de Dimbokro Viaduc du N'zi". YouTube.
  12. ^ Pilot, Georges. "Ouvrages Du Génie Civil Français Dans Le Monde Lignes De Chemin De Fer." Ingenieurs Et Scientifiques De France. Nov. 2012. Web.
  13. ^ [Côte-d'lvoire. Mission Houdaille. Etude Du Chemin De Fer Et Du Port. Vues Photographiques.. Enregistré En 1927]." Gallica. Web. 12 Dec. 2014. <http://gallica.bnf.fr/ark:/12148/btv1b7702250s/f15.item.r=btv1b7702250s>
  14. ^ L'Abidjan-Niger, p.21
  15. ^ Gourlay, Youenn (October 16, 2019). "On a embarqué à bord du train Abidjan-Ouagadougou, ligne de vie d'Afrique de l'Ouest". Geo.fr.
  16. ^ Chaleard, Jean-Louis, Chantal Chanson-Jabeur, and Chantal Béranger. Le Chemin De Fer En Afrique. Paris: Karthala, 2006. Print.
  17. ^ a b "Impressions Aboard the Train from Abidjan to Ouagadougou | ICWA". Institute of Current World Affairs. December 21, 2015.
  18. ^ Le chemin de fer en Afrique Jean-Louis Chaléard, Chantal Chanson-Jabeur, Chantal Béranger
  19. ^ a b "2.4 Burkina Faso Railway Assessment - Logistics Capacity Assessment - Digital Logistics Capacity Assessments". dlca.logcluster.org.
  20. ^ Dagnogo, Foussata, Olivier Ninot, and Jean Louis Chaleard. "Le Chemin De Fer Abidjan-Niger: La Vocation D'une Infrastructure En Question."EchoGéo. N.p., Apr.-May 2012. Web. 12 Dec. 2014. <http://echogeo.revues.org/13131?lang=en>
  21. ^ a b "Abidjan – Ouagadougou enhancement launched". Railway Gazette International.
  22. ^ "The Abidjan - Ouagadougou railway concession (English)". World Bank.
  23. ^ REHABILITATION OF THE ABIDJAN-OUAGADOUGOU-KAYA RAILWAY LINE. Publication. Ivory Coast: Consultative Group, 2013. Print.
  24. ^ "Home". Bolloré. Retrieved 2020-07-12.
  25. ^ Baro, Evariste. "CHEMIN DE FER ABIDJAN-OUAGA-KAYA: «LES TRAVAUX DE RÉHABILITATION DÉMARRENT EN 2015»." L'Observateur Paalga. 11 Aug. 2014. Web.
  26. ^ "Burkina, Ivory Coast hand control of railway to mining firm- PM". Reuters. 2014-02-04. Retrieved 2020-07-12.
  27. ^ "Train : la réhabilitation de la ligne Abidjan-Ouagadougou démarrera le 15 septembre – Jeune Afrique". JeuneAfrique.com. July 19, 2017.