Tramlink route 5
|
|
This article needs additional citations for verification. (August 2012) |
|
|
The topic of this article may not meet Wikipedia's general notability guideline. (August 2012) |
| Management | |
|---|---|
| Operated by | London Tramlink |
| Depot | Therapia Lane |
| Route | |
| Start | Crystal Palace |
| End | West Croydon |
| Length | |
| Service | |
| Level | Daily (six trams per hour) |
| Frequency | About every 8 minutes (proposed) |
| Journey time | |
| Adult fares | |
| Cash single | £2.30 |
| Oyster single | £1.35 |
Tramlink route 5 is a proposed tram route which will be operated as part of the Tramlink network in south London. The route will be operated by Transport for London.
Background
This is currently the only extension being developed. The proposed routes link Harrington Road stop with Crystal Palace, and Crystal Palace directly with Beckenham Junction, both terminating at Crystal Palace Parade. There are three options on how to get to the Parade: on-street, off-street and a mixture of the two. Following recent consultation the off-street option is favoured, with trams running along existing railway as far as Crystal Palace Station, and then running round the western edge of Crystal Palace Park (within the current park's perimeter) to the bus terminus near the parade.
Current Route
| Route 5 (proposed) |
|---|
Then back to Penge Road
Then to East Croydon and back to Beckenham Junction or Crystal Palace |
