Tramlink route 5

Route 5
Management
Operated by London Tramlink
Depot Therapia Lane
Route
Start Crystal Palace
End West Croydon
Length
Service
Level Daily (six trams per hour)
Frequency About every 8 minutes (proposed)
Journey time
Adult fares
Cash single £2.30
Oyster single £1.35

Tramlink route 5 is a proposed tram route which will be operated as part of the Tramlink network in south London. The route will be operated by Transport for London.

Background

This is currently the only extension being developed. The proposed routes link Harrington Road stop with Crystal Palace, and Crystal Palace directly with Beckenham Junction, both terminating at Crystal Palace Parade. There are three options on how to get to the Parade: on-street, off-street and a mixture of the two. Following recent consultation the off-street option is favoured, with trams running along existing railway as far as Crystal Palace Station, and then running round the western edge of Crystal Palace Park (within the current park's perimeter) to the bus terminus near the parade.

↑Jump back a section

Current Route

A tram at the Beckenham Junction terminus for Route 2
Route 5 (proposed)

Then back to Penge Road

Then to East Croydon and back to Beckenham Junction or Crystal Palace

↑Jump back a section
Last modified on 24 December 2012, at 22:32