Millennium Line

           Millennium Line

      Two trains meeting at Brentwood Station
      Overview
      Type Light Metro Rapid Transit
      System SkyTrain
      Termini Waterfront via Columbia
      VCC–Clark
      Stations 13
      Operation
      Opened January 2, 2002
      Owner TransLink (BC Transit)
      Operator(s) British Columbia Rapid Transit Company
      Rolling stock Bombardier ART Mark I and Mark II
      Technical
      Line length 20.3 km (12.6 mi)
      No. of tracks 2
      Electrification Third rail (Linear motor)
      Operating speed 80 km/h (50 mph)
      Route map
      Millennium Line.svg

      The Millennium Line is the second rapid transit line built in the SkyTrain light metro rapid transit system in Metro Vancouver, British Columbia, Canada. The line is owned and operated by TransLink. Millennium Line uses the colour yellow on route maps, wayfinding and station signage.

      History

      When the Expo Line opened in 1985, an extension to Lougheed Mall in east Burnaby was proposed. The most likely junction point for the spur to Lougheed Mall would have been from Royal Oak Station, up Edmonds Street to Lougheed Mall, although early SkyTrain route maps also suggested an extension northeast from New Westminster. Neither plan was ever realized, although the extension of Expo Line tracks to Columbia Station in 1989 and the completion of the Skybridge to Surrey in 1988 resulted in a short spur east of Columbia Station, which was ultimately incorporated into the new Millennium Line.

      In the late 1990s, the British Columbia government announced that an entirely new line would be built from VCC–Clark Station to Columbia Station via Lougheed Mall (served by Lougheed Town Centre Station), as the first phase of the "T-Line" outlined in the GVRD's Livable Region Strategic Plan that extended into Coquitlam. The government's choice of Bombardier's technology meant that the first phase of the line would have to connect to the existing Expo Line to use its maintenance yard. Connecting the two lines at Broadway Station was deemed too impracticable, so the lines were connected in New Westminster. Switches to the Millennium Line were installed on the Expo Line at the north end of the Skybridge. Expo Line service was reduced to a single track over the Skybridge during the installation of these switches.

      The second phase of the Millennium Line was to be an extension from Lougheed Mall to Coquitlam (then known as the Port Moody-Coquitlam (PMC) Line), which would have provided a "one seat ride" from Coquitlam to VCC–Clark Station. Switches to the PMC Line were installed to the east of Lougheed Town Centre Station and a third platform was roughed-in in anticipation of the extension. Phase II was cancelled following a change in provincial government.

      The Millennium Line opened on January 2, 2002, with trains initially operating between Waterfront Station on the Expo Line and Braid Station in eastern New Westminster - this was referred to as Phase I. Service was extended to Commercial–Broadway Station (then 'Commercial Drive Station'), or Phase II of construction, on September 4, 2002. Lake City Way Station opened on November 21, 2003. Three years later, the line was extended to its present terminus, VCC–Clark Station, opening on January 6, 2006.

      Millennium Line trains follow the Expo Line from Waterfront to Columbia Stations, then loop back into Vancouver via a new route, passing through Commercial–Broadway Station again at a different platform, and terminating at VCC–Clark Station.

      In 2007, the non-interlined portion of the Millennium Line served an average of 70,000 passengers per day. Of these, 14,000 passengers arrived on trains travelling from Expo Line stations west of Columbia Station, and 7,000 transferred from the Surrey section of the Expo Line.[1] Since then, it is estimated that ridership has grown to at least 80,000 passengers per day.[2]

      ↑Jump back a section

      Route

      Millennium Line Route Map
      Millennium Line
      UBC Loop
      SeaBus ( Lonsdale Quay )
      West Coast Express ( Mission )
      proposed
      Waterfront
      extension
      Canada Line ( Richmond )
      Burrard
      ( Richmond ) Canada Line
      Granville
      Stadium–Chinatown
      VCC–Clark
      Main Street – Science World
      Commercial–Broadway
      Nanaimo
      Renfrew
      29th Avenue
      Rupert
      Joyce–Collingwood
      Trans-Canada Highway
      Vancouver Zone 1 / Burnaby Zone 2
      Vancouver Zone 1 / Burnaby Zone 2
      Patterson
      Gilmore
      Brentwood Town Centre
      Metrotown
      Holdom
      Sperling – Burnaby Lake
      Royal Oak
      Lake City Way
      Production Way – University
      Edmonds
      Lougheed Town Centre
      Edmonds Yard
      future Evergreen Line ( Coquitlam )
      Trans-Canada Highway
      Burnaby / New Westminster
      Burnaby / Coquitlam
      22nd Street
      Coquitlam / New Westminster
      New Westminster
      Braid
      Columbia
      Sapperton
      Surrey ) Expo Line

      From Waterfront to Columbia Stations, Expo and Millennium Line trains stop at the same stations.

      The Millennium Line tracks pass through a tunnel for about 1 km east of Columbia Station, then are elevated above the CN/BNSF right-of-way through eastern New Westminster. The tracks run through Coquitlam, south of the Trans-Canada Highway to Lougheed Town Centre. There are currently no stations in Coquitlam, but original plans for the line proposed a "finger" looping into Coquitlam with a station at Mallairdville, but this was deleted following opposition from the community. From Lougheed Town Centre, the line is elevated, running down the middle or along the side of Lougheed Highway to just west of Brentwood Town Centre, where it picks up the CN/BNSF right-of-way again, being elevated until Renfrew Station, then travelling through the Grandview Cut to Commercial Drive and then on to VCC–Clark Station.

      When the Evergreen Line extension from Lougheed Town Centre Station to Coquitlam opens in summer 2016, the Millennium Line route will be shortened to serve Waterfront Station to Lougheed Town Centre. The Lougheed Town Centre to VCC–Clark section of the line will be served by the Evergreen Line, which will operate between VCC–Clark and Douglas College stations.

      ↑Jump back a section

      Future extensions

      West extension

      A long-term proposal exists to extend the line further west first along Great Northern Way on the ex-Finning land, today Great Northern Way Campus, with a couple of further possibilities:

      On January 14, 2008, the BC government announced a commitment to the expansion of the Millennium Line to UBC by 2020 as part of a $14 billion transit spending package to address global warming. It was not initially clear exactly what route the new line would take, but it was hinted that there would be less use of cut-and-cover to minimize disruption to businesses along Broadway and avoid the same problems seen during the Canada Line construction along Cambie Street.[3]

      As of January 2011, Translink is in the midst of a study on various options for improved transit out to UBC, including a westward SkyTrain extension from VCC–Clark Station.[4]

      Evergreen Line

      The Evergreen Line has now been confirmed for construction, commencing near summer 2012 and opening for service in summer 2016. In Coquitlam, a SkyTrain extension from Lougheed Town Centre Station to Coquitlam Town Centre was proposed when the original Millennium Line was built, and the necessary junction tracks were built at Lougheed Town Centre Station (which will now be used in 2016). Plans subsequently evolved to building a tram line instead of SkyTrain, which meant that the junction tracks would have remained unused. However, in February 2008, plans reverted to the use of SkyTrain technology to facilitate higher ridership, shorten travel times and to integrate seamlessly with the existing SkyTrain network.[5] The Evergreen Line will operate from Douglas College Station to VCC–Clark Station, replacing Millennium Line service on the Lougheed Town Centre to VCC–Clark portion of the route.

      ↑Jump back a section

      References

      1. ^ "Millennium Line celebrates five year anniversary with growing ridership". Translink. August 3, 2007. 
      2. ^ "SkyTrain in Vancouver". UBC SkyTrain Group. 2009. 
      3. ^ Palmer, Vaughn (2008-01-15). "Less than meets the eye, and light on details". Vancouver Sun (CanWest MediaWorks Publications). Retrieved 2008-01-15. 
      4. ^ "UBC Line Rapid Transit Study". Retrieved 2011-01-07. 
      5. ^ "Evergreen Line Business Case Update". BC Ministry of Transportation. 2008-02. 